ClickCease C1DA--(DESIGN) 442-21-012 OR HVAC System Upgrade… (36C25921R0073) | Closed - MatchAwards

C1DA--(DESIGN) 442-21-012 OR HVAC System Upgrade PH 2

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
Greenwood Village, USA
Notice type
Presolicitation
Solicitation number
36C25921R0073
NAICS
541330 - Engineering Services
PSC
C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
Category
Construction Related Services (4.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2021-06-01
Deadline
2021-06-22
Place of performance
Cheyenne, 82001

Description

Pre-SOLICITATION: A&E 442-21-012 OR HVAC System Upgrade PH 2 DESCRIPTION: This is a Pre-Solicitation Notice for the establishment of an Architect-Engineering (A-E) contract with services to be performed at the Cheyenne VA Medical Center, 2360 E. Pershing Blvd., Cheyenne, WY 82001. This requirement is being set-aside to Small Disabled Veteran Owned Small Business (SDVOSB) firms. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL; NO SOLICITATION PACKAGE WILL BE ISSUED UNTIL AFTER AN EVALUATION HAS BEEN MADE ON THE PROVIDED SF-330s. The SF-330 can be downloaded through the GSA Forms Library at: http://www.gsa.gov/portal/forms/type/TOP, scroll down to locate and click on the SF-330 hyperlink entitled, Architect-Engineer Qualifications. Please note: Funds are not presently available for this contract. The Government s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability. Magnitude of Construction is between $2,000,000 and $5,000,000. Written questions pertaining to this requirement should be submitted no later than 1:00 p.m. Mountain Time (MT), Tuesday, June 8, 2021. Interested firms should submit their current SF-330, Parts I and II, to ilze.karklins-powers@va.gov The SF-330s are due no later than 1:00 p.m. Mountain Time (MT), Tuesday, June 22, 2021. SCOPE OF WORK: Objective The Cheyenne Veterans Affairs Medical Center (VAMC) is seeking a qualified A&E Firm to provide design and construction management services to modify existing heating, ventilating, and air conditioning (HVAC) systems serving operating rooms (ORs)/ operating suites to bring them into compliance with current code and VA design standards. The anticipated cost of construction for this project is $2,550,000. Scope Field survey, analyze, and design upgrades necessary to existing HVAC system to bring four ORs at the Cheyenne Veteran Affairs Medical Center (VAMC) into full compliance with an approved equivalency to meet the VA surgical and HVAC design standards. The design will include the features summarized below in addition to any other modifications needed to have a complete and working system: Replace all diffusers in the ORs and clean core/ operating suite with a welded stainless steel HEPA filtered diffuser. Diffusers to include features such as dirty filter indicator, front access for filter change, and ability to challenge filter from faceplate. Design a properly sized laminar flow diffuser array in the operating suites in lieu of a laminar flow with air curtain system. Install two additional return grilles in each OR. Install booster fans, fan terminal unit, or fan powered diffusers as appropriate in each space where additional static pressure is needed to overcome HEPA filters at diffusers. Preform acoustical analysis where booster fans are added and provide appropriate silencers if needed. Validate the existing ductwork can handle the increased static pressure caused by the terminal HEPA filtration. Modify the after filter in the air handler serving the operating suites from a HEPA filter to a MERV 14 filter. Provide a DX condensing unit paired with existing DX coil in AHU serving the operating suites. Condensing unit shall be on emergency power. Verify emergency power availability in the penthouse, otherwise provide new feeder from the basement switchgear room. Modify AHU control sequence to enable DX cooling when desired discharge air conditions are not being met with the primary chilled water cooling coil. Provide humidity sensors in all four ORs and modify AHU control sequence to humidify/ dehumidify according to the space that is most out of the permitted range. Provide pressure independent return air terminal units for all four ORs to be controlled by pressure differential. Pressure sensors are present for ORs 3 & 4 but shall be added for ORs 1 & 2. Pressure differentials shall be visible on the building automation system. Evaluate temperature set back techniques to improve energy efficiency. Install occupancy sensors in spaces to control setback schedule. Create two computational fluid dynamic (CFD) models, one for OR 1 and one for OR 3, to ensure laminar flow diffuser array is properly sized to ensure proper airflow patterns and maximum air asepsis in the existing operating rooms. Also use the CFD model to identify the best location to add two additional return grilles in each OR to prevent recirculation/ entrainment of air from the non-sterile zone back into the sterile zone. CFD models shall be completed during schematic design to validate proper air distribution prior to design proceeding. In addition to the HVAC system the following will be addressed in the renovation of these spaces: Replacing the ceiling mounted light booms in ORs 1 & 2. Relocating one ceiling mounted light boom in OR 3 & OR 4 to obtain better lighting of the surgical field. Patch and paint all ceilings and walls in area of renovation. Replace lights in all four ORs with a sealed LED fixture suitable for use in an OR with dimming capability. Demolish abandoned pump and piping that previously served AHU-23 in ceiling plenum of OR 3 & 4 storage rooms back to mains in penthouse. Construction the walls surrounding ORs 1 & 2 to deck. Seal any openings above the ceiling in walls to deck surrounding ORs 3 & 4. Replace sprinkler heads in ORs. Provide a phasing plan to keep one set of operating rooms and surrounding departments operational throughout the duration of construction. Design shall be phased so that ORs 3 & 4 are renovated while ORs 1 & 2 remain in service. Once ORs 3 & 4 are in service, ORs 1 & 2 will be taken offline to be renovated. Whole system shutdowns will be limited to weekend work if possible. Existing ductwork will be cleaned prior to putting a set of ORs back in service. All outages and shutdowns shall be closely coordinated with the Contracting Officer Representative (COR) with minimum 2 weeks notice, any major shutdown impacting utilities to space (power, HVAC, medical gas) will be coordinated on a night or weekend. All work shall be planned and scheduled to minimize the construction activity impact on the operation of the medical center. All work shall be conducted with strict adherence to Cheyenne Medical Center and Veteran s Health Administration regulations, infection control requirements, and life safety requirements. Provide three (3) design period visits to the site. Participate in design review meetings for each deliverable over Microsoft Teams. Provide six (6) site visits during the construction phase of this project with a schedule determined by mutual agreement between the COR & the A&E firm. Provide on-site inspection with written evaluation and/or punch list upon completion of each phase. Provide all typical CA services such as answering RFIs, evaluating change orders, and reviewing submittals. Contractor shall place emphasis on cost and scope management. An estimate of construction cost based on level of design detail will be required at each design phase. Refer to the appended A/E Submission Instructions for Minor and NRM Construction Program (VA Guide PG-18-15) for minimum deliverable requirements at each phase. Also include any other submittal requirements detailed in this SOW. The NAICS code for this project is 541330 Engineering Services. The current small business size standard for 541330 is $16.5 million. OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA: The submitted SF-330s will be evaluated on the following criteria: This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The following evaluation criteria will be used to evaluate SF-330 technical proposals: The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) through (4) are considered most important and equal among themselves; Criteria (5) through (7) are of slightly less importance than (1) through (4) but are equal value among themselves. Professional qualifications necessary for satisfactory performance of required services; Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; Capacity to accomplish the work in the required time; Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Use of Service-Disabled Veteran Owned Small businesses. Experience in construction period services. Criterion1 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Additionally, offerors will be evaluated on their record of working together as a ream. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a licensed and/or certified workforce in all the following disciplines - Architecture, Interior Design, Civil, Structural, Mechanical & HVAC, Electrical, Fire Protection Engineering, LEAN/Six Sigma, LEED/Green Globes and AAMI. Lead designer in each discipline shall be registered but does not have to be registered in the particular state of this project. Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G. Criterion 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Offerors will be evaluated on specialized experience and technical competence, to include offeror s proposed personnel, in the performance of services similar to those anticipated under this contract with regard to: Specialized knowledge of medical equipment sterilization processes and designs, transport systems for supplies and instruments, hospital infection control, and space planning. AE firm should be familiar with VA/AAMI/ANSI/ASME/ASHRAE/CDC/NFPA/OSHA codes and guides listed in the SPS Design Guide (pg. 18-12). Submission requirements: Provide up to five (5) projects completed or substantially completed within the past five (5) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 Firms from Section C Involved in this Project, block (1). Include a contract number or project identification number in block 21. Include an e-mail address, and phone number for the point of contact in block 23(c). Include in the project description the contract period of performance, award contract value, current contract value, a summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work actually performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of five (5) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2. Criterion 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time, to include capacity within the key disciplines required by this project. Additionally, offerors will be evaluated on the volume of work awarded by the VA during the 12 months before the closing date. Submission requirements: Describe the firm s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm s capacity to accomplish multiple projects simultaneously. Criterion 4 - Past Performance. Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Additionally, offerors will be evaluated on the reputation and standing of the firm and its principals with respect to professional performance, general management, and cooperativeness. Offerors will be also evaluated on their record of significant claims against the firm. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1. Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 19, Attn: Ilze Karklins-Powers via email at ilze.karklins-powers@va.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Also, submit information regarding whether any significant claims have been filed against the offeror. Criterion 5 - Location in the general geographical area (Cheyenne, WY) and knowledge of the (Cheyenne, WY); provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. Provided that the application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the contract, firms/teams will be evaluated on the locations of their office or offices that will be performing the work under this contract. Submission requirements: Indicate firms/teams location, including main offices, branch offices and any sub consultants offices and demonstrate how this will be advantageous to the Government. Criterion 6 - Use of Service-Disabled Veteran Owned Small businesses. The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors will be evaluated. Submission requirements: Indicate Service-Disabled Veteran Owned Small Business (SDVOSB) firms/teams proposed to be used on this project. Criterion 7 - Experience in construction period services. Professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates will be evaluated. Submission requirements: Indicate from projects submitted in Criteria #2 the extent and magnitude of the construction period services regarding the areas stated above included in those projects. SELECTION INTERVIEW: Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired. GENERAL INFORMATION: All design and work will conform to the current edition of the VA Master Specifications and VA Design Standards as published at the following site: www.cfm.va.gov; ASME, OSHA, IBC 2009, NFPA and NEC building codes and standards. Coordinate all work through the COR of Facilities Management Service. Contractor is responsible for all cleanups and refuse disposal throughout the construction period. The A-E firm will prepare drawings and sp

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in June 2021

More lists