C1DA--518-20-106 Fire Alarm Device Replacements for Life Safety
- Status
- Closed (archived notice)
- Agency
- United States Department of Veterans Affairs
- Office
- TOGUS, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C24121R0092
- NAICS
- 541330 - Engineering Services
- PSC
- C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2021-04-19
- Deadline
- 2021-05-17
- Place of performance
- Bedford, 01730
Description
A/E SF-330 REQUEST FOR QUALIFICATIONS (SF-330) ***ATTENTION: THE INSTRUCTIONS PROVIDED IN THIS NOTICE ARE IN ADDITION TO THOSE PROVIDED ON THE SF 330, ARCHITECT-ENGINEER QUALIFICATIONS*** NAICS Code: 541 -- Professional, Scientific, and Technical Services; 541330 - Engineering Services (Small Business size standard of $16.5 million dollars average annual receipts) INTRODUCTION: The Department of Veterans Affairs Medical Center (VAMC); Network Contracting Office 1 (NCO1) is requesting qualification statements for Upgrade Fire Alarm System at the Bedford VAMC. CONTRACT INFORMATION: OVERVIEW 1.1 Government Agency Department and Address: Edith Nourse Rogers Memorial Veterans Hosptial 200 Springs Rd. Bedford, MA 01730 1.2 Project Title, Number and Location: Project Title: Upgrade Fire Alarm System Ph. II Project Number: #518-20-106 1.3 Scope of Work Provide all professional architectural and engineering (A/E) services necessary to develop complete construction drawings, specifications, cost estimates, project phasing, site visits and construction period administration associated with upgrading the fire alarm system in buildings 1, 3, 5, 8, 9, 10, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 33, 61, 62, 70, 78A, 80, 81 and 82 in accordance with Chapter 260 VA Design Guide and Space Criteria. All services provided shall be within the constraints of the construction budget consistent with the Veterans Affairs (VA s) project team goals as prioritized during project meetings and field surveys. Conduct preliminary project scope meetings and site survey investigations to develop the necessary elements for conceptual layout schemes with proposed alternatives consistent with the VA s project team goals as prioritized during preliminary project meetings, field surveys and studies. Enclosed in the Solicitation is previous (FA Redlines 2) contract as-built record sets showing extent of previous work carried out. This drawing set should not be considered as boilerplate and should be checked by due diligence during the design phase. The intent of this project is to upgrade fire alarm devices and panels and include, but is not limited to: Upgrade fire alarm notification devices to speaker-strobes in all locations. Upgrade all fire alarm signaling devices in all locations. Add additional notification and signaling devices where required by NFPA code or VA Design Guide. Upgrade panels to addressable where required. Upgrade fiber and copper connections for all existing fire alarm systems. This project is a follow-on from the Upgrade Fire Alarm System Ph. I project, and those documents will be available to the architect/engineer for coordination. This project shall completely interface and connect with the systems installed in the prior project. The former project upgraded systems primarily in-patient care buildings, this project primarily addresses the remaining non-patient care buildings on the campus. Design should be incorporated with high efficiency components, controls compatibility and reporting, commissioning, and air quality controls. These areas are required to be designed to meet VA requirements, Mass. DEP, EPA and other applicable environmental overseers. Work will include, but not be limited to, architectural, life safety systems, fire protection systems, electrical systems, and other specialty consultants required pertinent to the project requirements within the constraints of the construction budget consistent with the VA s project team goals as prioritized during project meetings and field surveys. A/E will include phasing plan, or additional impact needs and costs, to reduce impact to VA Medical Center. 2. DESCRIPTION OF WORK 2.1 General: Conduct preliminary meetings and site survey investigations to define the necessary elements of the project scope of work fulfilling the goals of the VA s project team (Engineering Svc), and presentation of preliminary layout plans with proposed alternatives to the User Group. Based on User Group meetings and site surveys, prepare a detailed project plan description report pertinent to the project requirements within the constraints of the construction budget consistent with the VA s project team goals. Through the course of the design phase, it will be necessary to interface with Medical Center staff to ascertain the details of the scope through a series of meetings and periodic submissions of documents. All design submission requirements shall be in accordance to A/E Contract and conform to all VA criteria and standards, in addition to Commonwealth of Massachusetts state codes and regulations. The A/E shall use VA Program Guides, Design Manuals and Master Specifications in preparing the Construction Documents for the project. However, should the A/E determine that deviation from such standards and specifications is necessary or beneficial to the Government; he shall promptly submit a request in writing to the Contracting Officer for permission to make the deviation. The request shall include an explanation of the specific reasons for the desired change and benefits expected. 2.2 Implementation: Engage the services of all consultants in each discipline deemed to be necessary to fulfill the requirements of the project plan. Each discipline shall document and investigate the relevant existing conditions, review the building available information, and verify all essential elements pertinent to their discipline. Site investigations shall measure, photograph, video tape and document the conditions of areas to be renovated and/or impacted. The A/E shall visit the project site to investigate the information shown on the Government-Furnished drawings, record (as-built) drawings and other planning documents which is part of this contract. This information is the best available, but the Government does not guarantee its accuracy or completeness. The A/E's investigation of field conditions shall be performed in a competent professional manner in accordance with the Architectural Design Manual PG18-10. It is the A/E's responsibility to research the existing Government documents, determine those that are applicable to the project and request copies from the Government; the Government will not perform a search of Government documents to determine the information that the A/E may need during design. 2.3 Project Development: The A/E shall provide all services required to prepare documents and reports for the subject project consistent with the VA s project team goals as prioritized during preliminary project meetings, field surveys and studies. The A/E shall determine existing conditions, severity of deficiencies, if any previous deficiencies have been corrected and to identify any conditions which may have previously been unreported. Cost estimates shall be prepared to reflect the cost of replacing the component in a standalone project (i.e., not as part of another project) and all cost for this replacement including but not limited to asbestos removal, required phasing, special field conditions and/or temporary equipment needed during the construction. The completed report shall then be submitted for approval to the Contracting Officer s Representative (COR). 2.4 Project Design: Based on the approved design development the A/E shall provide all services required to prepare plans, specifications, and other supporting documents necessary to correct the identified deficiencies in priority order. The approved cost estimate and available project funding will be used to determine the amount of deficiencies which will be correct under this project. A complete design including but not limited to determination and evaluation of existing conditions, necessary engineering calculation, necessary design work, independent fire safety/life safety review, IH Services, quantity and cost estimates, bid schedule, construction cost estimates, a proposed construction schedule, design analyses and calculations, a design documentation report, engineering considerations and options report, renderings, and project finish boards shall be developed for this project. 2.5 Asbestos: The proper identification Asbestos to determine construction costs associated with Comprehensive Strategy & Report phase of this project are considered part of this project. To extent possible existing Asbestos Assessment of the facility will be made available to the A/E. Additionally proper asbestos abatement design and IH monitoring services required during construction to correct the deficiencies selected for the construction design portion of this project shall also be provided by the A/E. All A/E staff and subcontractors must have 16 hour asbestos training to enter crawlspaces. 3. GENERAL DESCRIPTION of SERVICES A/E shall provide the services indicated in this Overview, Supplement A, Supplement B and Supplement C. These services will be provided in distinct phases: Conceptual Preliminary User Group Meetings & Field Surveys 35% Submittal Schematics 65% Submittal DD Design Development 95% Submittal CD Construction Documents essentially complete barring VA approval. Third Party Review Independent Peer Review 100% Submittal Bid [Final] Documents Construction Period Services Project Close Out Submittal As-Built Construction Documents 3.1 Drawings: The drawings, specifications, and all other submittal items will be prepared using English units of measure. 3.1.1 General: The A/E shall prepare drawings in a manner that clearly and adequately delineates the work to be accomplished by the construction contractor. Design documents will be sufficiently detailed to permit construction contractors to submit responsive bids without visiting the project site. The cover sheet will be signed and stamped by principal of the firm who is a registered Architect or Professional Engineer. All drawings will be created using AutoCAD and National CAD standards. These CAD standards are available on the Internet at http://www.va.gov/facmgt/standard/cadd/VHACADAppGuide.doc . 3.1.2 CAD Files: One CAD (*.DWG) file shall be used per drawing (sheet) applying the VA s CAD layering and disk labeling protocols. All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement B sets of drawings (AutoCAD). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA COR at the time each submission is due (XRF, DXF and ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks. 3.1.3 Format: All drawings and sketches will be provided in both hard copy and electronic file format. Full-sized drawings shall be developed as D sized sheets (24 inches by 36 inches at the trim line) and shall utilize the standard VA title block. Fonts shall be standard AutoCAD, and drawings must be fully compatible with AutoCAD 2014. Drawing file names must relate to the VA project name, discipline and subject as approved by the VA COR. Drawings shall utilize world coordinate system with standard cross hairs. Adobe Acrobat PDF files for each AutoCAD file shall be provided. 3.1.4 An independent fire safety and life safety review shall be accomplished at 95% design submission. Include the cost and coordination for a fire/safety review. Third Party Review to be limited to Fire Alarms, Pull stations and other equipement being replaced or improved, not to include review including fire partitions, fire rated walls or travel distances. These deficiencies may be noted, but the construction documents are not intended to include work to improve smoke partitions, fire walls or travel distances. 3.2 Specifications: 3.2.1 General: The A/E shall utilize the latest edition of VA Master Specifications as revised and provided by the facility supplemented by the VA Office of Construction and Facilities Management Master Specifications as needed. The VA retains no responsibility for the development or preparation of any specification. While it is recognized that certain Divisions and/or Sections will require significant input from the VA, the A/E retains overall responsibility for these Sections. 3.2.2 Electronic Files: All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement B sets of specifications (MS Word). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA COR at the time each submission is due (ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks. 3.2.3 Outline Specifications: The A/E shall develop an outline specification listing the proposed guide specifications and the A/E prepared sections that will be used for the project. The outline specification will list the guide specification number and title for each proposed section. Sections shall be arranged within their respective divisions, in numerical order. New specification sections, developed by the A/E, will be numbered to fall in their respective division at a logical location. 3.2.4 Editing Specifications: The A/E must thoroughly edit and adapt the Specifications to satisfy the project requirements and provide a complete set of construction specifications. The A/E shall notify the VA in writing should there be instances where there are no appropriate Master Specifications available for use. At the VA s direction the required specifications will be prepared by the A/E. These specifications shall list the essential features, functions, and other factors to clearly indicate the type and quantity of items/work required. All specifications will be prepared by listing parameters and requirements that can be met by several manufacturers. The use of trade names may be used to establish the standard of quality to be met. 3.2.5 Construction Contractor Submittal Register: The specifications require the construction contractor to submit shop drawings, samples, manufacturer s data, certificates, test reports, and other items to the Government. The A/E shall prepare a complete listing of construction contractor submittal requirements on an Excel Spreadsheet. The spreadsheet shall have a separate line for each required submittal and separate columns for Division, Section, and type of submittal (catalog cut, sample, etc). 3.3 Quantity and Cost Estimates: 3.3.1 Format: The A/E shall prepare quantity computations, cost estimates, and construction cost estimates for this project. All construction cost estimates shall conform to the requirements contained in VA Manual for Preparation of Cost Estimates (latest edition). Manual is available on the internet at http://www.va.gov/facmgt/standard . 3.3.2 Cost Estimate Submittal: Cost estimates shall be submitted in 2 hard copies and in electronic form. THE A/E IS RESPONSIBLE FOR ESTABLISHING INTERNAL CONTROLS FOR KEEPING THE PRJOJECT DESIGN WITHIN PROJECTED CONSTRUCTION FUNDING. THE A/E WILL BE REQUIRED TO REVISE DESIGN AND RESUBMIT COST ESTIMATES AS NECESSARY (AT NO COST TO THE VA) SHOULD COST ESTIMATES EXCEED CONSTRUCTION FUNDING. 3.3.3. Proposed Phasing and Construction Schedule: The A/E shall prepare a proposed schedule for construction that is consistent with the project construction cost estimate. During development of this schedule, due consideration will be given to standard construction practices, durations of tasks, the sequence of construction, procurement of materials, climatic conditions, etc. It is planned that areas in and adjacent to the proposed construction area shall be occupied during construction. The A/E shall develop a phasing plan that addresses this fact and assures smooth implementation of required construction. 3.4 Design Analysis (DA): The A/E shall develop a DA that addresses general project parameters, functional and technical requirements, design objectives, design assumptions and calculations applicable to the project s design. Design/Construction Alternatives, existing physical limitation and their impact shall also be included in the DA. 3.5 Quality Control: 3.5.1. Quality Control Plan: The A/E shall prepare a Quality Control Plan (QCP) which includes the following as a minimum: Identification and discussion of all organizational and technical interfaces Design team members and their areas of responsibility Team members responsible for checking the design Team members responsible for checking the electronic files Team members responsible for reviewing and submitting the required VA Design Alerts and Quality Alerts Project Schedule showing key milestones and review periods 3.5.1.1. VA Design Alerts and VA Quality Alerts can be found on the internet at http://vaww.va.gov/facmgt/ . 3.5.2. Quality Assurance: The A/E is responsible for developing and performing quality assurance reviews of all work to confirm that proper criteria, regulations, laws, codes, principles and professional procedures have been used. This includes work performed by subcontractors. The VA shall review all project submissions, but this review is general in nature and should not be considered as part of the A/E s Quality Control Plan and/or Quality Assurance. 3.5.3 Quality Certification: The A/E shall certify at each submission in writing that he/she has performed quality assurance reviews of that submission. 3.6 Site Visits, Meetings/Conferences, and Discussions: 3.6.1. Site Visits: The A/E shall perform design site visits as required to accomplish the scope of this project. The purpose of these visits is further defined project requirements, observe and evaluate existing field conditions, review any existing documentation, conduct required design meetings, and to gather supplemental site data necessary for performing the design. Reports summarizing the conditions observed, personnel contacted, and data gathered during the visits shall be prepared and included in the Design Development Documentation. 3.6.2. Design Review Conferences: Design review conferences shall conduct shortly following the issuance of each review Submission. Refer to Supplement B for the proposed schedule, but will typically take place two weeks after the submission date. Design review conferences for the Schematics, Design Development and Construction Document Development phase shall include the A/E Project Manager/Senior Designer. These conferences shall take place at the facilities where the work is being performed. 3.6.3 Site Visit and Meeting Minutes: The A/E shall take notes and prepare minutes for all site visits, meetings and conferences attended during design. Minutes will be prepared in typed form, signed by the A/E Project Manager, and furnished to COR within seven calendar days after the meeting/conference for concurrence and distribution to attendees. Copies of all meeting/conference minutes will be included in each Submission. 3.7 Responsibility after Design Completion: The A/E is required to support the VA should errors or omissions in the documents create problems in bidding or administering the contract for construction. As needed, the A/E will clarify the design intent and correct any errors or omissions in the original documents. The corrections shall be done in a timely manner at no additional cost to the Government. The A/E shall incorporate amendment changes on the original drawings and/or CAD drawings when requested to do so after the bidding process at no extra cost to the Government. In addition, the A/E shall incorporate amendment changes on the submittal registers and submit on a CD labeled with the project title, location, and construction contract number. Also, during the bidding period, the A/E is required to assist in answering all bidders inquiries pertaining to the design. If clarifications are required, the A/E will prepare the required amendment. The A/E, however, shall not receive or respond to any direct inquiries from contractors. 3.8 A/E ServiceAttachments
Contacts
- Philip Silva, Contract Specialist
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in April 2021