C1DA--A/E: Upgrade/Replace HVAC Phase III
- Status
- Closed (archived notice)
- Agency
- United States Department of Veterans Affairs
- Office
- HAMPTON, USA
- Notice type
- Special Notice
- Solicitation number
- 36C24621Q0454
- NAICS
- 541330 - Engineering Services
- PSC
- C1DA - ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
- Category
- Construction Related Services (4.2)
- Posted
- 2021-03-23
- Deadline
- Not stated
Description
Page 2 of 2 PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A/E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A/E services will be procured under a negotiated Firm-Fixed Price contract. The NAICS Code for this acquisition is 541330, Engineering Services, and the applicable Small Business Size Standard is $16.5 million annual revenue. During performance, the selected A/E firm will be required to attend meetings in person, on site, at the Salem VA Medical Center, Salem, VA. Therefore, the area of consideration is RESTRICTED to a maximum 500-mile radius of the Salem VA Medical Center, 1970 Roanoke Blvd, Salem, Virginia 24153 in which either the A/E firm s Primary or established Auxiliary/Satellite office must be located. NOTE: The 500-mile radius will be measured by one or more of the nationally recognized commercial free on-line mapping services from the Primary or established Auxiliary/Satellite Office Address to the above VA address (shortest driving distance option). Proximity of the firms assigned office, to the project site, including within the 500-mile radius, is one of the criteria on which selection of the most highly qualified firms will be based. Interested parties shall ensure current licensing to provide real property design services (Engineer Services) in accordance with the State regulations of which the firms assigned office is located, and shall have a current registration in: (1.) the System for Award Management (SAM) database at https://www.sam.gov, (2.) and the Vendor Information Pages database at http://www.va.gov/osdbu, if applicable, and (3.) have submitted the current cycle VETS-4212 Report at http://www.dol.gov/vets/programs/fcp/main.htm (for contracts in the amount of $150,000.00 or more). Failure of a proposed SDVOSB to be certified by the CVE at the time the SF 330 is submitted shall result in elimination from further consideration. SF330 shall be email to: bryant.guerrant@va.gov . DUE DATE FOR SF330 QUALIFICATIONS SUBMISSIONS: April 9, 2021 @ 11:00am EST PROJECT INFORMATION: Project No.: 658-21-103 Project Title: Upgrade/ Replace HVAC Phase III Place of Performance: Salem VA Medical Center (VAMC), 1970 Roanoke Blvd, Salem, Virginia 24153 A/E SCOPE OF WORK PROJECT NO. 658-21-102 Upgrade/ Replace HVAC Phase III VETERANS AFFAIRS MEDICAL CENTER SALEM, VA 24153 1. General Description of Services: Provide professional engineering services to include option analysis, investigative surveys and reports, planning, design, consulting, preparation of contract drawings, specifications, cost estimates and construction period services as required for Project 658-21-102 Upgrade/ Replace HVAC Phase III at Salem VA Medical Center (VAMC) Salem, Virginia. 2. Project Description: The intent of this project is to provide a design to Upgrade/Replace HVAC in the Salem VAMC Warehouse( Bldg. 143) to include replacement of all ductwork, controls(DDC) and all other associated components associated with the air handling and distributions systems in order to provide a system that conforms to all VHA requirements with regards to layout, environmental conditions, traffic flow, and interaction with other supporting services. Project will include demolition of the existing AHU and ductwork and replacement with a new RTU and air distribution system. In addition, the Salem VAMC is currently designing a 1,500 sf addition to the existing warehouse. This design shall incorporate all necessary provisions required to support the future expansion (sizing of the RTU). The design shall also include Design shall include all aspects of sitework, structural, mechanical, electrical, plumbing, life safety, fire safety and other necessary components to provide fully functional and efficient HVAC system. Design shall include all necessary provisions for temporary facilities and/or other necessary provisions to ensure the facilities maintains full operations and impacts to operations are minimized during construction. After developing expansion/renovation options, the A/E shall work in conjunction with VAMC Staff and interested Agencies to determine the best option and then design and prepare construction documents for the architectural, civil, mechanical, plumbing, electrical, and other applicable components of this Project. An important requirement of this design will be that the Warehouse area continue to function during the construction to the maximum extent possible. This will greatly limit certain aspects of the construction including construction tools, methods, and timeframes. These limitations and requirements will need to be clearly detailed in the design package as will the need for multiple phases for the construction work to proceed while also maintaining functionality within adjacent spaces. This design shall utilize the latest VA Technical Information Library (VA TIL) Design Manuals for all aspects of the HVAC design. This project shall evaluate the existing space and provide the best options to the VAMC for completing the renovation with the least amount of disruption to the staff and functions. The project design shall require phasing plan(s) for outages and corresponding infection control plans to protect adjacent hospital areas during construction. The design package shall include complete drawings, construction specifications, detailed cost estimate(s), and other pertinent documents for advertisement of a contract for construction. Among other improvements, the design shall also incorporate installation of monitoring systems for reporting and identification of air quality, humidity, and other critical environmental data within each room. Work will require design efforts from multiple disciplines including but not limited to Architectural, Structural, Life Safety, Plumbing, Mechanical, Medical Specialty, and Electrical. Expertise in design for hospital settings be critical to success of this design. Work will also require detailed phasing plans to meet the needs of the various phases in the work above as well as the final configuration for all space. 3. Construction Amount: The project is to be designed within an estimated base construction cost of $1,980,000 with at least 2 deduct alternates totaling 20%. If the base bid cost exceeds budget and deduct alternates do not bring the project within the construction budget, the A/E shall redesign or take steps necessary to reduce cost so that budget limitations are not exceeded. 4. Design Standards: The project design shall be completed in accordance with this A/E scope of work and all applicable Department of Veterans Affairs (VA) standards, specifications, and other criteria referenced herein unless otherwise approved by the VA. The A/E shall retrieve all VA design information and standards from the VA Facilities Web Site (http://www.va.gov/facmgt/standard). These documents and all national, state and local codes adopted and used by the VA shall be incorporated into the design of this project. At a minimum, the following references shall be utilized for planning and design purposes. The facility record drawings and AutoCAD files are available for the A/E s use. NOTE: Not all record drawings are available on AutoCAD. Additionally, the A/E is responsible for field verification of all facility record drawings. Design shall meet or exceed the follow guidelines: VA BIM Manual v2.2 VHA Program Guide PG-18-3 VA Master Construction Specifications Structural Design Manual H-18-8 Seismic Design Requirements Sanitary Design Manual for Hospital Projects PG-18-13 Barrier Free Design Handbook Life Safety Codes Electrical Design Manual HVAC Design Manual PG-18-10 Government Record Drawings (A/E shall field verify conditions) PG-18-15 A/E Submission Requirements. Physical Security Design Manual (Final Draft) 5. BIM Requirements: AE shall use IFC compliant parametric Building Information Modeling (BIM) software for the design of this project design as prescribed in the VA BIM Manual v2.2 for BIM standards. 6. Site Investigation: AE shall hire an independent 3rd party consultant to conduct a survey of existing conditions using 3D laser scanning technology and produce a 3D BIM LOD 300 Model. This model shall serve as the base model for development of the project design by the AE. The following deliverables shall be provided by the consultant: Intensity Map Point Cloud files (.rcs format) 2D AutoCAD Floor Plans 2D Point Cloud Sheets 3D Model at LOD300 level produced using IFC compliant BIM software 7. Energy Requirements: New construction and applicable renovations shall meet the Federal Government s standard for a sustainable building the following shall be incorporated into the project: Any facet of renovation must meet the minimum requirements of ASHRAE Standard 90.1 2010 or most current standard effective at the time of AE contract award. A one-page summary of key components will be provided with the design information from the VA. The summary which will be provided is not all encompassing, and the Standard s compliance report shall be submitted at the Final Design phase for each facet of the design as required by the standard. In addition to the ASHRAE Standard 90.1 compliance reports, the A/E shall evaluate applicability of VHA requirements with regards to LEED or Green Globe certification and make a recommendation to the VA with regards to applicability to this Project. The final decision with regards to applicability of certification requirements shall rest with the VA. The project shall be designed to meet all federal energy conservation requirements and goals applicable to VHA projects. 8. Deductive Alternates: AE shall ensure the project design includes a minimum of 2 and maximum of 4 viable deductive alternates equal to approximately 20 percent of the projects construction cost to ensure construction award within program budget limitations. The number of deductive alternates shall be a minimum of two. 9. Construction Estimate: AE shall provide an estimate of construction project costs for all work required for the base bid and the bid alternatives. Cost estimates shall be revised for each design submittal. AE shall prepare cost estimate in accordance with the VA s Manual for Preparation of Cost Estimates & Related Documents for VA Facilities. 10. Construction Schedule and Phasing Requirements: The A-E will develop and submit for review a schedule for construction, as a part of each design submittal phase. The schedule shall be task oriented, indicating the number of calendar days, after Notice to Proceed, by which milestones are to be achieved. The critical path Method (CPM) of network calculation shall be used to generate the construction schedule. The schedule will be a network analysis and will be based on the technical and contractual requirements of the contract and estimated construction durations of the project. The schedule will clearly show the critical path for the overall completion of construction. All activities shall have an estimate of the average number of workers per day that are expected to be used during the execution of that activity. AE shall submit a phasing narrative and phasing plan(s) with each design submission as prescribed in Program Guide, PG-18-5, Volume C. 11. Equipment List: The design shall require that the construction/installation contractor provide a complete report containing the list of items installed in the project which will require periodic maintenance or observation, the frequency of required maintenance/observation, details of the maintenance, and any other information necessary to inform future maintenance activities of the Medical Center maintenance staff. The A/E shall provide for a complete review of this report submittal as part of Construction Period Services rendered by the A/E and shall coordinate this report/list with Logistics Services to insure all applicable items are addressed for future maintenance and proper registry of the items into the Medical Center s tracking systems for maintenance and property disposition. 12. Deliverables: Quantities of design review materials for each design submission are provided below. Schematic Design, Design Development, and Construction Document Submissions: One (1) set design drawings, complete set bound with all disciplines, Arch D (24 x 36) size. One (1) set design drawings, separated and bound by each discipline, Arch D (24 x 36) size. Three (3) sets design drawings, complete set bound with all disciplines, Arch C (18 x 24) size. One (1) hardcopy copy, edited/marked-up VA Master Specifications of each discipline with VA Master Specification Table of Contents. One (1) hardcopy, Cost Estimate One (1) hardcopy copy, AE Preliminary Schedule One (1) hardcopy, design narratives and investigative reports. One (1) Electronic copy on CD, BIM Model and Drawing Files in BIM Software format. One (1) electronic copy of all design deliverables listed above in (pdf format). Final Construction Document Submission: One complete set (1) Arch D (24 x 36) size sets of the design drawings. Three (3) Arch C (18 x 24) size sets of the design drawings. Two (2) sets complete typed reproducible specifications (unbound) plus a copy on CD ROM in Word format. Note: The specification sections shall be one document on the CD ROM, not individual documents. These shall also incorporate Sections edited by the Salem VAMC in Sections 00 and 01. (ADD NOTE for PDF specifications to have sections AND ONLY the sections book marked.) Two (2) copies of typed Final cost and schedule estimates, plus a copy on CD ROM in Excel format. One (1) hardcopy of design narratives and investigative reports. One (1) electronic set of all design deliverables in (pdf format). BIM Model and drawing files in BIM Software format. One (1) copy of the final scope of work and including base bid and all deduct alternates in Microsoft Word Format. Each bid item and deducts shall have the estimated cost and duration included for that item of work based on the final AE cost estimate and preliminary schedule. Two (2) sets of final digital/hardcopy engineering calculations (if applicable). List of sole source items with justification (if applicable). List of Or-equal items with justification (if applicable). 13. Schedule of Deliverables: All deliverables shall be provided as specified in the schedule of deliverables provide below. The total contract duration for this project is 164 calendar days from issuance of NTP. AE shall submit a schedule not to exceed 164 calendar days within 14 calendar days following issuance of NTP. Schedule shall include at a minimum all activates and/or milestones listed in the sample schedule below. The A/E shall provide monthly progress schedule updates throughout the design process. The selected A/E must be able to deliver on this timeline. AE Project Schedule of Deliverables Task Name Duration NTP 0 days Design Charette* 14 days Schematic Design 30 days VA Review 14 days Schematic Design Review Meeting 1 day Design Development 45 days VA Review 14 days Design Development Review Meeting 1 day Construction Document Development 30 days VA Review 14 days Construction Document Review Meeting 1 day Final Construction Documents 14 days Total Duration 164 days Notes: Durations provided above are shown in calendar days. Design Charrette shall be scheduled within 14 calendar days following receipt of NTP. All activities are scheduled using finish to start relationships. Total contract duration was calculated using CPM scheduling software and is based on a 5 day work week w/ standard federal holidays. 14. As-Builts: Upon completion of construction and incorporation of all revisions required to complete the Building Information Model and record drawings, the following items shall be submitted: Two (2) sets, reproducible hard copy as-built plans, Arch E1 (30 X 42 ) One (1) electronic copy on CD-ROM, as-built drawings in AutoCAD format, current release. One (1) electronic copy on CD-ROM, complete Building Information Model. EVALUATION FACTORS FOR AWARD THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD, BUT WILL BE DEEMED INCORPORATED BY REFERENCE. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, and other factors considered. The following factors shall be used to evaluate offers: Professional Qualification Specialized Experience and Technical Competence Capacity Past Performance Locations Quality Control Plan Experience in Construction Period Services The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, and other factors considered. Boards will evaluate firms' qualifications strictly on the basis of the announced selection criteria and their stated order of importance. The criteria will be applied as follows: Professional Qualifications (FAR 36.602-1(a)(1)). A board will evaluate, as appropriate, the education, training, registration, certifications (see paragraph 3-4.d(4)), overall and relevant experience, and longevity with the firm of the key management and technical personnel. This criterion is primarily concerned with the qualifications of the key personnel and not the number of personnel, which is addressed under the capacity criterion. The lead designer in each discipline must be registered as required by FAR 36.609-4 and 52.236-25 but does not have to be registered in the particular state where the project is located. Specialized Experience and Technical Competence (FAR 36.602-1(a)(2)). Offerors will be evaluated based on the specialized experience of a firm on similar projects and the technical capabilities (such as design quality management procedures, CADD/BIM, and equipment resources,) of the prime firm and any subcontractors. Evaluation will be based on the information presented in the Architect-Engineer Qualifications - Standard Form 330 (SF330). A minimum of three (3) and maximum of five (5) example projects may be submitted for consideration under SF330, Part I, Section F. Example projects should be designs completed within six (6) years of solicitation closing date. Capacity (FAR 36.602-1(a)(3)). A firm s capacity will be evaluated based on their experience with similar size projects, the available capacity of key disciplines to perform the work in the required time, and a primary design schedule. The volume of work awarded during the previous 12 months, based on data extracted from the Federal Procurement Data System, will be considered when evaluating capacity. Additionally, the full potential value of any current indefinite delivery contracts that a firm has been awarded will be considered when evaluating capacity. Past Performance (FAR 36.602-1(a)(4)). Offerors will be evaluated based on terms of cost control, quality of work, and compliance with performance schedules. Knowledge of the Locality (FAR 36.602-1(a)(5)). Firms will be evaluated on their knowledge of the locality such as knowledge of local historical features, climatic conditions, and local construction methods that are unusual or unique to the area wContacts
- Bryant Guerrant, Contract Specialist
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in March 2021