ClickCease C1NB--Upgrade Chiller Plant (36C24621Q0430) - MatchAwards

C1NB--Upgrade Chiller Plant

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
HAMPTON, USA
Notice type
Special Notice
Solicitation number
36C24621Q0430
NAICS
541330 - Engineering Services
PSC
C1NB - ARCHITECT AND ENGINEERING- CONSTRUCTION: HEATING AND COOLING PLANTS
Category
Construction Related Services (4.2)
Posted
2021-03-16
Deadline
Not stated

Description

PUBLIC ANNOUNCEMENT FOR PROCUREMENT OF ARCHITECT-ENGINEERING (A/E) SERVICES: This is a request for Standard Form 330, Architect-Engineer Qualifications only. A-E Services are being procured in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) subpart 36.6. All submissions will be evaluated in accordance with the below selection criteria. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firms will be selected based on demonstrated competence and qualifications for the required work. Any resulting award for the proposed A/E services will be procured under a negotiated Firm-Fixed Price contract. The NAICS Code for this acquisition is 541330, Engineering Services, and the applicable Small Business Size Standard is $16.5 million annual revenue. During performance, the selected A/E firm will be required to attend meetings in person, on site, at the Salem VA Medical Center, Salem, VA. Therefore, the area of consideration is RESTRICTED to a maximum 500-mile radius of the Salem VA Medical Center, 1970 Roanoke Blvd, Salem, Virginia 24153 in which either the A/E firm s Primary or established Auxiliary/Satellite office must be located. NOTE: The 500-mile radius will be measured by one or more of the nationally recognized commercial free on-line mapping services from the Primary or established Auxiliary/Satellite Office Address to the above VA address (shortest driving distance option). Proximity of the firms assigned office, to the project site, including within the 500-mile radius, is one of the criteria on which selection of the most highly qualified firms will be based. Interested parties shall ensure current licensing to provide real property design services (Engineer Services) in accordance with the State regulations of which the firms assigned office is located, and shall have a current registration in: (1.) the System for Award Management (SAM) database at https://www.sam.gov, (2.) and the Vendor Information Pages database at http://www.va.gov/osdbu, if applicable, and (3.) have submitted the current cycle VETS-4212 Report at http://www.dol.gov/vets/programs/fcp/main.htm (for contracts in the amount of $150,000.00 or more). Failure of a proposed SDVOSB to be certified by the CVE at the time the SF 330 is submitted shall result in elimination from further consideration. DUE DATE FOR SF330 QUALIFICATIONS SUBMISSIONS: March 30, 2021 @ 11:00am EST PROJECT INFORMATION: Project No.: 658-21-103 Project Title: Upgrade Chiller Plant Place of Performance: Salem VA Medical Center (VAMC), 1970 Roanoke Blvd, Salem, Virginia 24153 A/E STATEMENT OF WORK Upgrade Chiller Plant PART A SCOPE OF WORK Architect-Engineer Services shall include: Provide professional engineering services to include option analysis, phasing design, investigative surveys and reports, planning, consultation and site visits, design work, preparation of contract drawings and specifications, preparation of cost estimates and provision of construction period services as necessary for demolition, construction, inspection, testing and certification for all required components for project 658-21-103 Upgrade Chiller Plant, at VAMC Salem, Virginia.  The Consultant shall provide the design and specifications for an energy efficient chiller system to replace the two (2) existing chillers. This includes all related components such as piping, valves, chilled water pumps and related components, controls and systems. Variable Frequency drives shall be used where appropriate. The drawings and specifications shall describe the preferred chiller system that is being used as a basis for design. This system must be able to be procured and installed within the project budget. The Consultant shall also list the names of three (3) approved equal manufacturer chiller systems. Include all equipment schedules on the drawings by symbol designations, name, estimated size or capacity in BTU, GPM, gallons, etc. All new and existing piping shall be labeled to identify its use. The two (2) new chillers shall contain the required valves and electrical disconnect devices necessary to isolate the unit for repair or replacement without affecting the operation or shutting down the remaining units or systems. Provide a design that designates the removal of one chiller and the installation of the new chiller in its place. Only one chiller can be under construction at a time and the chiller system must be 100% operational prior to starting the second chiller for demolition. The Consultant shall provide a design that in the event both chillers must be worked on simultaneously, a temporary chiller would have to be installed to maintain the chilled water requirements. The temporary chiller would have to be within the project budget and require no additional cost to the Government. The Consultant shall be responsible to determine the appropriate size and capacity of the new chillers and their related components based on the cooling load requirements for the facility. Confirm the new chiller capacities by cooling load calculations and submit the signed and sealed data for Design Review. Specify a digital control system capable of managing the entire new system from a main control location as well as remote station control. No pneumatic controls are to be incorporated into this design. New system shall be compatible to existing equipment and controls not being replaced but required for proper operation. Provide design details for the location and installation of all auxiliary components and accessories including, but not limited to expansion tanks, alarms, sensors, control devices, annunciator panels, condenser pumps, chilled water pumps, etc. The Consultant shall determine if the existing concrete pads are sufficient to support the new chiller equipment. If existing pads cannot be reused then the Consultant shall provide a design for new concrete pads, foundations, and mounting details for any new equipment. Comprehensive review of the existing conditions to include extensive field investigation and, other projects in-progress that will impact this scope. Interviews with VA engineers, medical staff, and support staff. These interviews shall be documented and presented in the design report with each submission. Summary of findings from the review of building records, reports, plans and interviews with station personnel. The A/E shall be responsible for doing site investigation and not relying on records as some available records are outdated. Drawings - submit construction drawings in accordance with VA guidelines Specifications submit specifications in accordance with VA guidelines Calculations/Statements Submit all calculations in published format in addition to native file format Calculations shall be included with every submission after the design report Provide Statement of Special Inspections Provide 3rd party Commissioning consultant for collaboration and review during design phases and construction period services which shall include submittal review, RFI responses, site visits, progress meeting attendance (virtual may be acceptable), change order review including preparation of ASI as necessary, and as-built preparation. Construction Amount: The project is to be designed within an estimated base construction cost of $1,980,000 with at least 2 deducts alternates totaling 20%. If the base bid cost exceeds budget, and deduct alternates do not bring the project within the construction budget, the A/E shall redesign or take steps necessary to reduce cost so that budget limitations are not exceeded at no additional cost to the Government. Provide all necessary site visits for design and construction not listed under construction period services. All work to be performed for this project must meet all Center for Engineering, Occupational Safety and Health (CEOSH); National Fire Protection (NFPA); National Electric Code (NEC); National Electrical Manufacturers Association (NEMA); Energy Independence and Security Act of 2007 (EISA 2007); Underwriters Laboratory, Inc. (UL); Federal, State, and Local regulations and codes; and JCAHO standards and guidelines. Coordinate all correspondence with regulatory agencies through VAMC engineering management prior to contact with the regulatory agency. In particular, this project will require coordination with State Historic Preservation Office due to its vicinity to historically significant structures and the historic district associated with the Salem VAMC. All designs shall incorporate all electrical, mechanical, structural and architectural components necessary to provide for a complete structural and functional area. Designs shall be in accordance with all applicable requirements of Center for Engineering, Occupational Safety and Health (CEOSH); National Fire Protection Association (NFPA), Environmental Protection Agency (EPA),Occupational Safety Health Agency( OSHA), International Code Council (ICC), National Plumbing Code, National Electric Code, American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), Center for Disease Control(CDC), National Safety Code, AIA Guidelines for Construction and Equipment of Hospital and Health Care Facilities, VA Specifications, VA Standard Details, VA Construction Standards, VA Design Guides , VA Design Manuals and applicable local, National Electrical Manufacturers Association (NEMA); Energy Independence and Security Act of 2007 (EISA 2007); Underwriters Laboratory, Inc. (UL); Federal, State, and Local regulations and codes; and JCAHO standards and guidelines. Develop plans and specifications for construction of the project: Upgrade Chiller Plant. The design must consider requirements of the overall project as the desired future condition and allow for future construction of follow-on components, if needed, without significant effect to the project constructed under this contract The A/E shall provide a charrette. The A/E shall provide all requirement for NESHAP (Attachment A) The A/E shall add specifications for quality control (Attachment B) Design must adhere to the following energy requirements All new construction shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2010, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2010 to document the energy savings. Should the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements in order to identify the most energy-efficient design that is life-cycle cost effective. The A/E shall add specifications for energy requirements (Attachment C). The following parameters shall be used for performing the analysis: 20 year life-cycle period for system comparisons Use Public domain programs such as TRACE, E-CUBE, Carrier E20-II, etc. 7% Discount Factor Neither includes taxes, nor insurance while computing cost. Design is to be accomplished using AutoCAD 2019 to include BIM. Design and cost estimates to be in compliance with A/E requirements listed on the VA website. As part of the A/E design and during construction period services the A/E consultant is required to purchase and utilize Submittal Exchange. Provide cost estimate reflecting both periods of services independently. A.   All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format and transmitted via an Internet-based submittal service that receives, logs and stores documents, provides electronic stamping and signatures, and notifies addressees via email. 1.    Internet-based submittal service shall be used for transmittal of all submittals, request for information (RFI), progress documentation, contract modification documents (e.g. change proposals, change orders), certified payrolls, daily reports, test reports, and any other document the COR wishes to make part of the project record. 2.    Prime Contractors, subcontractors, suppliers, and Architect's consultants are to be permitted to use the service at no extra charge. 3  Paper document transmittals will not be reviewed; emailed PDF documents will not be reviewed. 4. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts. B.   The cost of the service is to be paid for by A/E C.   Set up ownership of the electronic submittal service account such that the Government is the sole owner and has full rights to the account. Coordinate with the Contracting Officer Representative to fulfill this requirement. D.   Submittal Service: The selected service is: Submittal Exchange (tel: 1-800-714-0024): www.submittalexchange.com. E.   Training: Selected service shall include web-based training sessions for Government, Contractor, and AE personnel. F.   Project Closeout: The Government shall determine when to terminate the service for the project. Selected internet based service shall provide archived copies of all files to the Government as part of closeout. Deliverables: AE Project Schedule of Deliverables Task Name Duration NTP 0 days Design Charette* 14 days Schematic Design 60 days VA Review 14 days Schematic Design Review Meeting 1 day Design Development 60 days VA Review 14 days Design Development Review Meeting 1 day Construction Document Development 45 days VA Review 14 days Construction Document Review Meeting 1 day Final Construction Documents 30 days Total Duration 254 days Notes: Durations provided above are shown in calendar days. Design Charrette shall be scheduled within 14 calendar days following receipt of NTP. All activities are scheduled using finish to start relationships. Total contract duration was calculated using CPM scheduling software and is based on a 5 day work week w/ standard federal holidays Design Report: Prior to the initiation of any detailed design, the A/E shall, in conjunction with representatives of the Engineering Department, review documentation, conduct department interviews and tour project areas. Next the A/E will develop various alternatives, which will be presented to the Engineering Department for selection. Design Scope: Once alternatives/options are selected, the A/E shall develop and provide a complete set of drawings and specifications for bidding and construction purposes which encompass the previously selected options. Additionally, the A/E shall provide a detailed cost estimate of the project construction costs, and a constructability analysis identifying the most efficient, cost effective ways to accomplish the construction while allowing for the least disruption of hospital operations. The following A/E design submissions shall be in accordance with the A/E requirements listed on the VA website. Part I: 30% Submission: The requirements are working drawings at the 30% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 8 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part II: 60% Submission: The requirements are working drawings at the 60% stage, marked-up specifications, and a detailed construction cost estimate showing a quantitative survey of all labor and material. Submit 8 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part III: 95% Submission: The requirements are complete construction drawings showing all details and views, updated detailed cost estimate, and finalized specifications. Submit 8 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part IV: 100% Submission: The requirements are complete construction drawings showing all details and views, updated detailed cost estimate, and finalized specifications. Submit 8 half size set of drawings (22 x 34 ) on bond paper, 2 copies of the marked-up specifications, 1 copy of the preliminary construction cost estimate, and an electronic copy of the drawings (.pdf and AutoCAD) and specifications (.docx and .pdf) on a CD-ROM. Part IV: Final Submission: Provide 1 set of drawings (30 x42 ) on bond paper, 6 sets of half size drawings on bond paper, 2 sets of specifications, and an electronic copy of the drawings(.pdf and AutoCAD) and specifications(.docx and .pdf) on a CD-ROM. All documents shall bear the seal of a Registered Design Professional with date and signature. The plans cover sheet shall have ALL RDP seals with signature and date affixed with discipline identified and contact information including firm name, address, phone number, and email contact. The design deliverables must adhere to the following requirements: Specifications: The project specifications shall be prepared in Microsoft Word by the A/E from the VA Master Specifications. The general format shall include; Part 1-General, Part 2-Products, and Part 3-Execution. Part 1 verbiage shall include the general requirements, identify applicable standards, and identify submittals required for a particular specification. This information should be directly related and correspond to a specific submittal number enumerated in the Submittal Register as identified below. Part 2 shall include description of the salient characteristics of the products. Part 3 shall include a description of the methods used to install items of construction. The A/E shall identify all VA Master Specification sections applicable to the project and edit them accordingly to fit the scope of work. If additional specification sections are needed that are not listed in the VA Master Specs, the A/E is responsible to write and edit an appropriate CSI format specification section. Specifications shall be printed on 8 ½ x 11 bond paper using 12pt Times-New-Roman fonts. The A/E shall incorporate into the specifications and its construction site inspection procedures the applicable Infection Control and Dust Control provisions. Construction Cost Estimates: The A/E shall prepare a Construction Cost Estimate in Microsoft Excel using the CSI 34-division format. The Cost Estimates shall include a copy of the quantity take-offs, breakdown of individual line items that accurately reflect the quantity take-off of the various categories of work involved, unit of measure, quantities, unit cost, overhead, and profit. All cost data shall be taken from the most current version of a recognized industry standard, e.g. Means Estimating Guides. For items that are not in the industry standards, vendor quotes and justification for labor hours shall be provided. Construction Cost Estimates shall be submitted with 30%, 60%, 95% and 100% design reviews and for the final submission. As part of the cost estimating effort, the A/E shall provide a Schedule of Values such that discrete elements of the Specifications are identified and may be used in negotiations with a proposal bidder. Construction Schedule: The A/E shall develop a construction phasing schedule to minimize interruptions to normal operations of the affected construction area(s) or the Medical Center. Phasing sequences shall be clearly delineated in the construc

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in March 2021

More lists