<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/105746477921989855" -->

---
title: N059--CAT6A Cable Installation Sioux Falls VA (36C26321Q0341) | Closed - MatchAwards
description: N059--CAT6A Cable Installation Sioux Falls VA. United States Department of Veterans Affairs. Solicitation 36C26321Q0341. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2021-02-26. MEDICAL FACILITY CABLE INSTALLATION SERVICES This is a sources sought...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/105746477921989855
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: N059--CAT6A Cable Installation Sioux Falls VA (36C26321Q0341) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/105746477921989855
og:description: N059--CAT6A Cable Installation Sioux Falls VA. United States Department of Veterans Affairs. Solicitation 36C26321Q0341. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline 2021-02-26. MEDICAL FACILITY CABLE INSTALLATION SERVICES This is a sources sought...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# N059--CAT6A Cable Installation Sioux Falls VA

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

Saint Paul, USA

Notice type

Presolicitation

Solicitation number

36C26321Q0341

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2021-02-17

Deadline

2021-02-26

Place of performance

Sioux Falls, 57105

## Description

MEDICAL FACILITY CABLE INSTALLATION SERVICES This is a sources sought notice only and it is not a solicitation announcement. The purpose of this sources sought notice is to gain knowledge of qualified potential contractors and their socio-economic size classification in accordance with NAICS code 238210, Electrical Contractors and Other Wiring Installation Contractors. Responses will be used by the Government to make appropriate acquisition decisions. After a review of the responses to this sources sought notice, a solicitation announcement may be posted. A response to this sources sought notice is not an adequate reply to a potentially forthcoming solicitation. The Sioux Falls VA Health Care System located in Sioux Falls, South Dakota is seeking qualified potential contractors to provide CAT 6 cable installation services. Refer to the attached document titled Cable Installation Services for additional details and information. To respond to this sources sought notice, please complete the attached form titled Response Form to Sources Sought Notice and email the information requested to Curt LaRose, Contracting Officer, at curt.larose@va.gov . The closing date and time of this sources sought notice is February 26, 2021 at 10:00 AM Central Time. This is not a solicitation and in no way obligates the Government to award any contract. Additionally, a response to this sources sought notice is not a request to be added to a prospective bidders list or to receive a copy of any forthcoming solicitation. See attached statement of work for details regarding the requirement. Statement of work for Cabling Indefinite Deliverable, Indefinite Quantity (IDIQ) Contract VA Sioux Falls HEALTH CARE SYSTEM This Statement of Work (SOW) defines the cabling system and subsystem components to include cable, termination hardware, and supporting hardware to install data cabling end to end. The intent of this document is to provide all pertinent information to allow the vendor to provide the labor, supervision, tooling, and miscellaneous mounting hardware and consumables to install a complete system. However, it is the responsibility of the contractor to propose any and all items required for a complete system if not identified in this SOW. The successful Contractor is required to furnish all labor, supervision, tooling, miscellaneous mounting hardware and consumables for each cabling system installed. The Contractor shall maintain current status with the warranting manufacturer, including all training requirements, for the duration of the IDIQ contract. The Contractor shall staff each installation crew with the appropriate number of trained personnel, in accordance with their manufacturer/warranty contract agreement, to support the Warranty requirements. After installation, the Contractor shall submit all documentation to support the warranty in accordance with the manufacturer s warranty requirements, including test results, and to apply for said warranty on behalf of the customer. The system warranty will cover the components and labor associated with the repair/replacement of any failed link as a result of a defective product when a valid warranty claim is submitted within the warranty period. PERFORMANCE: Services for equipment include the following performance metrics: The vendor shall travel to the Sioux Falls V.A. Healthcare Systems in Sioux Falls South Dakota during the Service Agreement period to perform work during our business hours. See Hours of Services section below. All components listed in the contract shall be provided by the contractor and installed including, but not limited to cabling, conduit, testing, programming, unless otherwise noted in each individual CLN task order description. Contractor shall terminate every cable in applicable rack or jack within the room. All work shall be completed at agreed upon timeframe between contractor and SFVAHCS. All work must be performed by a qualified technician. HOURS OF SERVICES: The Contractor shall perform the services as specified herein Monday through Friday with the exception of National Holidays between the hours of 8:00a.m. 4:30p.m. GOVERNMENT NATIONAL HOLIDAYS: The Contractor is not required to provide services on the following national holidays nor shall the Contractor be paid for these holidays: New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by the U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. PARTS: Contractor shall provide original equipment manufacturer (OEM) parts/subsystems and software. The contractor shall ensure the government is informed of all safety modifications issued by the OEM, and all optional modifications offered by the OEM are made available to the Sioux Falls VA Health Care System (SFVAHCS). REPORTING: The Contractor s technician shall report to the Technical Representative s (TR) office (Building #17-Engineering) prior to starting work. The Contractor s technician shall prepare a written service ticket explaining the work for the day, a listing of which parts are to be used. The ticket shall be given to the TR for approval. After repairs to the IT cabling system have been completed, the TR or technical monitor must indicate acceptance of the work by stating acceptance on the repair ticket and by signing the ticket. A signed copy of the properly approved ticket shall accompany the payment invoice. All penetrations of fire rated assemblies shall be fire caulked. Contractor shall note fire stop deficiencies found during their work and include in report summary. Contractor is to prepare an annual report as to the improvements, maintenance, and service and over-all condition of the IT cabling system equipment. Report shall include: all equipment describing repairs and/or corrections made to the IT cabling system. Records of lockout tagout (as applicable) shall be maintained by service technician and listed in service report. BADGES AND PARKING: All Contractor personnel are required to wear identification (I.D.) badges issued by the SFVAHCS Engineering office during the entire time they are on the SFVAHCS grounds. It is the responsibility of the Contractor s personnel to park in the appropriate designated parking areas. Parking information is available from the SFVAHCS security office. The SFVAHCS shall not validate or make reimbursement for parking violations of the Contractor s personnel under any circumstance. AUTHORIZED SERVICES: Only those services specified herein are authorized under this contract. Prior to performing any service of a non-contract nature, the Contracting Officer (CO) must be advised of the reasons for this additional work. Only the Contracting Officer may authorize additional services and reimbursement will not be made unless prior authorization has been obtained. CONTRACTOR S RESPONSIBILITIES: The Contractor shall take all precautions necessary to protect against injury or damage during the performance of this contract. The Contractor shall be responsible for any injury to Contractor s employees as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by contractor s employees fault or negligence. Ensure contractor understands and implements the IT security requirements for system interconnection documents required per the Memorandum of Understanding or Interconnection Agreement (MOU-ISA). The standard operating procedure (SOP) and a template for a MOU-ISA are located on the Information Protection Risk Management (IPRM) Portal and can be provided to the contractor. Ensure contractor understands their participation in IT security requirements for C&A of the VA system to which they connect. Enforce contractor performance (timely submission of deliverables, compliance with personnel screening requirements, and appropriate termination activity as appropriate). Contractor shall participate in preconstruction risk assessment and may be required to provide negative, plastic zipper walls to maintain infection control and patient safety where requested by TR or technical monitor. Cable boxes and open ceiling tiles in patient care or corridors shall be monitored at all times. CONTRACTOR PERSONNEL: PERSONNEL ACCEPTANCE: The Government reserves the right to accept or reject Contractor s staff for the rendering of services. Complaints concerning Contract Personnel s performance or conduct shall be dealt with by the Contractor, TR and the final decision made by the Contracting Officer. Location: Sioux Falls, SD VA Health Care System 2501 W. 22nd Street Sioux Falls, SD 57117 TELECOMMUNICATIONS CABLING REQUIREMENTS Facilities Description The Data cabling system shall ensure efficient data signal transmission up to latest (250MHz) performance in compliance to ANSI/TIA/EIA/568-B for Category 6A Systems. The system shall ensure efficient operation from patch panels in the telecommunications room to the workstation outlets. System shall be designed and approved for use below raised access floor systems and above drop ceiling spaces. Cabling system is based on home run cabling requirements. Distribution is achieved above or below ceiling or access floor through use of individual 4-pair Category 6A rated plenum cables and components. The cable will distribute telecommunication signals from patch panels and connecting blocks located in the telecommunications room. Horizontal Distribution Subsystem Telecommunications Outlets Each telecommunications outlet (TO) location, unless otherwise noted, shall be provided with two, or four Category 6A plenum UTP cables. Each Category 6A UTP cable shall be terminated on an 8-position, 8-conductor Category 6A UTP Panduit Mini Comm modular jack to the T568B wiring code. The TO faceplates, unless otherwise noted, shall be mounted to single gang boxes, box eliminators, surface mount boxes and/or floor monuments (provided by a 3rd party) as required. Product Specifications RJ45 Category 6A Connectors for Data Circuits All jacks will be Panduit Mini Comm Category 6A modular blue (data) and will meet the Category 6A performance requirements. Modular jacks shall be terminated using an approved Panduit termination tool to eliminate connector damage and promote consistent terminations. The jacks shall be color-coded for both T568A and T568B wiring. Each jack shall be wired to T568B. Wall Faceplates Work area wall outlets shall be constructed utilizing electrical ivory, Standard, single gang, 1, 2, or 4-Port Panduit Mini Comm faceplates, unless for phone, then Panduit phone wall plate will be used. Data outlets shall be loaded with blanks where cables are not installed. Faceplates shall be Panduit part number CFP (1, 2 or 4) EI for electrical ivory or stainless steel. For areas that have stainless or EI contractor shall provide matching to adjacent installations. Telecommunications Outlet Installation All outlets shall be installed in the following manner. Cables shall be coiled in the in-wall or surface-mount boxes if adequate space is present to house the cable coil without exceeding the manufacturer s bend radius In hollow wall installations where box-eliminators are used, excess wire can be stored in the wall No less than 6 and no greater than 12 of slack shall be stored in an in-wall box. Three feet of excess slack shall be neatly coiled and stored in the ceiling above each drop location in addition to slack stored in wall boxes and hollow wall spaces. Wall box shall be installed to match the height of adjacent boxes or 18 on center above finished floor, unless otherwise noted. Surface mounted Panduit shall match color of box and include offset boot to jog around ceiling tile grid. Panduit will be installed from surface mounted boxes up to ceiling grid for each installation. If work replaces an existing cable, Contractor shall completely remove from IT rack to wall outlet. Owner shall note cables identified for replacement in order instructions. In addition, each cable type shall be terminated as indicated below. Cables shall be dressed and terminated in accordance with the recommendations made in the ANSI/TIA/EIA-568-B document, manufacturer s recommendations and/or best industry practices Pair untwist at the termination shall not exceed 0.25 inch for connecting hardware. Bend radius of the cable in the termination area shall not be less than 4 times the outside diameter of the cable The cable jacket shall be maintained as close as possible to the termination point Horizontal Distribution Cable Product Specifications Horizontal Cabling for Data Circuits Category 6A Cabling: Plenum Horizontal cabling shall be 23 AWG, 4-pair UTP, UL/NEC/NFPA CMP rated, with a plenum-rated jacket. Individual conductors shall be FEP insulated. Cable jacketing shall be lead-free. Cable shall meet the performance requirements to all standard Category 6A performance requirements. Cable shall be safety listed to NFPA 262/UL910\. Cable shall be UL Listed for safety, and UL verified for performance as well as be a part of the UL verification program. Horizontal Distribution Cable Installation Cable shall be installed in accordance with manufacturer s recommendations and best industry practices Cable raceways shall not be filled greater than the NEC maximum fill for the particular raceway type Cables shall be installed in continuous lengths from origin to destination (no splices) The cable s minimum bend radius of 4 times the cable diameter and maximum pulling tension of 25 lbs. shall not be exceeded If a J-hook or trapeze system is used to support cable bundles all horizontal cables shall be supported at a maximum of four-foot intervals - at no point shall cable(s) rest on acoustic ceiling grids or panels Cabling shall be supported independently or within existing cable management infrastructure. Do not support cabling to any other conduit, sprinkler line, or HVAC component. Other installations using the aforementioned banned support methods is not clearance to use them for supporting cables installed under this contract. Horizontal distribution cables shall be bundled in groups of not greater than 40 cables (cable bundle quantities in excess of 40 cables may cause deformation of the bottom cables within the bundle) Cable shall be installed above fire-sprinkler and systems and shall not be attached to the system or any ancillary equipment or hardware The cabling system and support hardware shall be installed so that it does not obscure any valves, fire alarm conduit, boxes, or other control devices Cables shall not be attached to ceiling grid or lighting support wires Where light support for drop cable legs is required, the Contractor shall install clips to support the cabling Any cable damaged or exceeding recommended installation parameters during installation shall be replaced by the Contractor prior to final acceptance at no cost to the Owner Cables shall be identified by a self-adhesive label in accordance with the System Documentation Section of this specification Unshielded twisted pair cable shall be installed so that there are no bends less than four times the cables outside diameter (4 X cable O.D.) at any point in the run Cable length from Jack to Jack will not exceed 89.9 Meters/295 Feet. Pulling tension on 4-pair UTP cables shall not exceed 25-pounds for a single cable or cable bundle Horizontal Cross-Connect Installation Copper termination and management hardware shall be installed in the following manner: Cables shall be dressed and terminated in accordance with the recommendations made in the TIA/EIA-568-B document, manufacturer s recommendations and/or best industry practices Pair untwist at the termination shall not exceed 0.25 inch for connecting hardware Bend radius of the cable in the termination area shall not exceed 4 times the outside diameter of the cable Cables shall be neatly bundled and dressed to their respective panels or blocks Each panel or block shall be fed by an individual bundle separated and dressed back to the point of cable entrance into the rack or frame The cable jacket shall be maintained as close as possible to the termination point Each cable shall be clearly labeled on the cable jacket behind the patch panel at a location that can be viewed without removing the bundle support ties Cable labels shall not be obscured from view Cabling System Testing All cables and termination hardware shall be 100% tested for defects in installation and to verify cable performance under installed conditions. All conductors of each installed cable shall be verified useable by the Contractor prior to system acceptance. Any defect in the cabling system installation including but not limited to cable, connectors, feed-through couplers, patch panels, and connector blocks shall be repaired or replaced in order to ensure 100% useable conductors in all installed cables. All cables shall be tested in accordance with this document, the ND&I Contract agreement, and best industry practices. If any of these are in conflict, the Contractor shall be responsible to bring any discrepancies to the attention of the project team for clarification and/or resolution. Written documentation of test results for each cable installed under this contract shall be submitted to Sioux Fall Engineering for their records. Copper Each cable shall be tested for continuity on all pairs and/or conductors. Twisted-pair cables shall be tested for continuity, pair reversals, shorts, and opens plus tests that indicate installed cable performance. These cables shall be tested using a certified Level III or Level IV cable scanner. The copper feed pairs will be tested end to end. Continuity Each twisted pair of every installed cable shall be tested using a green light test set that shows opens, shorts, polarity and pair-reversals. The test shall be recorded as pass/fail as indicated by the test set in accordance with the manufacturers recommended procedures and referenced to the appropriate cable identification number and circuit or pair number. Any faults in the wiring shall be corrected and the cable re-tested prior to final acceptance. Length Each installed cable shall be tested for installed length using a TDR type device. The cables shall be tested from jack to jack. The data cable length will not exceed 89.9 Meters/295 Feet . Cable lengths shall be recorded, referencing the cable identification number and circuit or pair number. For multi-pair cables, the longest pair length shall be recorded as the length for the cable. Performance Verification Copper Category 6A data cabling systems shall be performance verified using an automated test set. This test set shall be a Level III qualified tester approved by the cabling manufacturer. The test shall be permanent link which tests for the following performance parameters: Wire Map Length Insertion Loss Pair-to-Pair Near End Crosstalk (NEXT) Power Sum Near End Crosstalk (PSNEXT Equal Level Far End Crosstalk (ELFEXT) Power Sum Equal Level Far End Crosstalk (PSELFEXT) Return Loss (RL) Propagation Delay Delay Skew Category 6A data cable shall be performance verified using an automated test set. Test results shall be automatically evaluated by the equipment, using the most up-to-date criteria from the ANSI/TIA/EIA-568-B.2.1 Standard, and the result shown as pass/fail. Test results shall be printed directly from the test unit or from a download file using an application fro 

<!-- mobian-agent-ad sponsored="true" id="217051d2-86f3-4f6c-9993-94df65151c84" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Curt LaRose, Contracting Officer

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/99f3481545304647b7649ea40f07f9cf/view)

[More from United States Department of Veterans Affairs posted in February 2021](/department%5Fof%5Fveterans%5Faffairs/archive/2021-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"N059--CAT6A Cable Installation Sioux Falls VA","description":"MEDICAL FACILITY CABLE INSTALLATION SERVICES This is a sources sought notice only and it is not a solicitation announcement. The purpose of this sources sought notice is to gain knowledge of qualified potential contractors and their socio-economic size classification in accordance with NAICS code 238210, Electrical Contractors and Other Wiring Installation Contractors. Responses will be used by the Government to make appropriate acquisition decisions. After a review of the responses to this sources sought notice, a solicitation announcement may be posted. A response to this sources sought notice is not an adequate reply to a potentially forthcoming solicitation. The Sioux Falls VA Health Care System located in Sioux Falls, South Dakota is seeking qualified potential contractors to provide CAT 6 cable installation services. Refer to the attached document titled Cable Installation Services for additional details and information. To respond to this sources sought notice, please complete the attached form titled Response Form to Sources Sought Notice and email the information requested to Curt LaRose, Contracting Officer, at curt.larose@va.gov . The closing date and time of this sources sought notice is February 26, 2021 at 10:00 AM Central Time. This is not a solicitation and in no way obligates the Government to award any contract. Additionally, a response to this sources sought notice is not a request to be added to a prospective bidders list or to receive a copy of any forthcoming solicitation. See attached statement of work for details regarding the requirement. Statement of work for Cabling Indefinite Deliverable, Indefinite Quantity (IDIQ) Contract VA Sioux Falls HEALTH CARE SYSTEM This Statement of Work (SOW) defines the cabling system and subsystem components to include cable, termination hardware, and supporting hardware to install data cabling end to end. The intent of this document is to provide all pertinent information to allow the vendor to provide the labor, supervision, tooling, and miscellaneous mounting hardware and consumables to install a complete system. However, it is the responsibility of the contractor to propose any and all items required for a complete system if not identified in this SOW. The successful Contractor is required to furnish all labor, supervision, tooling, miscellaneous mounting hardware and consumables for each cabling system installed. The Contractor shall maintain current status with the warranting manufacturer, including all training requirements, for the duration of the IDIQ contract. The Contractor shall staff each installation crew with the appropriate number of trained personnel, in accordance with their manufacturer/warranty contract agreement, to support the Warranty requirements. After installation, the Contractor shall submit all documentation to support the warranty in accordance with the manufacturer s warranty requirements, including test results, and to apply for said warranty on behalf of the customer. The system warranty will cover the components and labor associated with the repair/replacement of any failed link as a result of a defective product when a valid warranty claim is submitted within the warranty period. PERFORMANCE: Services for equipment include the following performance metrics: The vendor shall travel to the Sioux Falls V.A. Healthcare Systems in Sioux Falls South Dakota during the Service Agreement period to perform work during our business hours. See Hours of Services section below. All components listed in the contract shall be provided by the contractor and installed including, but not limited to cabling, conduit, testing, programming, unless otherwise noted in each individual CLN task order description. Contractor shall terminate every cable in applicable rack or jack within the room. All work shall be completed at agreed upon timeframe between contractor and SFVAHCS. All work must be performed by a qualified technician. HOURS OF SERVICES: The Contractor shall perform the services as specified herein Monday through Friday with the exception of National Holidays between the hours of 8:00a.m. 4:30p.m. GOVERNMENT NATIONAL HOLIDAYS: The Contractor is not required to provide services on the following national holidays nor shall the Contractor be paid for these holidays: New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by the U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a...","url":"https://matchawards.com/department_of_veterans_affairs/posts/105746477921989855","identifier":"36C26321Q0341","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2021-02-17","availabilityEnds":"2021-02-26","areaServed":"Sioux Falls, 57105","sameAs":"https://sam.gov/opp/99f3481545304647b7649ea40f07f9cf/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```