<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/105599257851694640" -->

---
title: Z1DA--657-19-123JC Create Emergency Generator… (36C25521R0048) - MatchAwards
description: Z1DA--657-19-123JC Create Emergency Generator Connection and Re-build Existing Main Service Entrance Switchgear. (VA-21-00027928). United States Department of Veterans Affairs. Solicitation 36C25521R0048. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Page 5 of 5...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/105599257851694640
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Z1DA--657-19-123JC Create Emergency Generator… (36C25521R0048)
og:url: https://matchawards.com/department_of_veterans_affairs/posts/105599257851694640
og:description: Z1DA--657-19-123JC Create Emergency Generator Connection and Re-build Existing Main Service Entrance Switchgear. (VA-21-00027928). United States Department of Veterans Affairs. Solicitation 36C25521R0048. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Page 5 of 5...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Z1DA--657-19-123JC Create Emergency Generator Connection and Re-build Existing Main Service Entrance Switchgear. (VA-21-00027928)

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LEAVENWORTH, USA

Notice type

Special Notice

Solicitation number

36C25521R0048

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2021-01-22

Deadline

Not stated

## Description

Page 5 of 5 FBO NCO15 MATOC SUBCONTRACTING SPECIAL NOTICE THIS INFORMATION IS POSTED FOR SUBCONTRACTING OPPORTUNITIES ONLY. PROPOSALS WILL NOT BE CONSIDERED FROM ANY FIRMS OTHER THAN THE FIVE (5) PREVIOUSLY SELECTED NCO15 MATOC CONTRACTORS ONLY.Â NO SOLICITATION DOCUMENT WILL BE POSTED FOR THIS REQUIREMENT. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY.Â THEREFORE, FAR 5.203 DOES NOT APPLY.Â IDIQ TASK ORDER FOR THE (657-19-123JC Create Emergency Generator Rebuild Existing Main Entrance Switchgear). The attached project requirements specs and drawing are provided for informational purposes only. THE FIVE (5) NCO15 MATOC CONTRACTORS AND CURRENT CONTRACT NUMERS ARE LISTED BELOW: Vendor Name IDIQ Contract Number Company POC Contact number OnSite Construction Group, LLC 36C25518D0043 Jacob Baucom jacob.baucom@onsite-cg.com 816 423-1142 L JBCO Group LLC 36C25518D0045 Lonnie Wilson / Richie Sanders / Ashley Galetti lwilson@kutfconstruction.com richie@ljbco.net / Ashley@ljbco.net 816 291-0580 / 816 550-4557 / 816-802-6394 WFV2 Construction, LLC 36C25518D0046 Mitch Dallas / Joe Vazquez / Bena Roseburrough mitchd@wonfreedom.com /joev@vazquezcc.com /benar@wonfreedom.com 816-914-0641/ 816-569-6869 Global Engineering Services Inc 36C25518D0047 Cole Woodman cole@ges-us.com ; cole.woodman@gmail.com 619 948-8541 B K M-IEC CONSTRUCTION LLC 36C25518D0048 Brent Motley bmotley@bkmconstructionllc.com admin@bkmconstructionllc.com 913 297-0049 Statement of Work VA St. Louis Health Care System Project 657-19-123JC, Phase 1 and Phase 2 Phase 1: Create Emergency Generator Connection Phase 2: Re-build Existing Service Entrance Switchgear Purpose of Project: VA Saint Louis Health Care System, John Cochran Division, requires modifications to the existing Main Service Entrance Switchgear at John Cochran VA Hospital, St. Louis, MO. The work will be done in two phases, which are detailed below. Each phase was designed by AE firm Ross and Baruzzini, however, due the nature of items discovered during the initial design, Construction Administration (CA) will be accomplished by two different companies. Phase 1 CA will be covered by HFS, and phase 2 CA will be administered by Guidon Design, Inc. Phase 2 will only be started when phase 1 is completed and with the written approval of the COR. All work in both phases will be accomplished within 350 days of the notice to proceed (NTP) being issued. Criteria: The Contractor shall provide all labor, material, transportation and equipment to perform the work outlined below. All installed items will be checked by the COR, the project Electrical Engineer and JB Maintenance and Operations (M&O) personnel for complete functionality prior to project completion. If the installed work does not function to the standards of M&O personnel the contractor shall fix any discrepancies at no cost to the Government. The Scope of Work for this project shall consist of the following: Phase 1: The purpose of phase 1 of the project is to create a generator connection that will allow the hospital and all other buildings currently fed from Bldg. 17 (i.e. the main service entrance switchgear) to be fed by emergency generator power. For specific information on the required materials, installations and locations, refer to the construction drawings and specifications for this project. Creation of this connection will necessarily involve power outages. All outages of any type should be minimized as much as possible and must be scheduled on weekends. Also, all outages of any type must be scheduled a minimum of 3 weeks in advance with JC Maintenance and Operations. Phase 2: The purpose of phase 2 of the project is to re-build the existing Main Service Entrance Switchgear in Bldg. 17\. Note that this is not new building construction but rather a gut of much of the interior components of the existing building. The intent is to minimize downtime of the switchgear and keep the hospital at 100% power as much as possible. To accomplish this the main-tie will be used, with the generator connection and rented generators (i.e. phase 1) as a back-up. The original switchgear was manufactured by Westinghouse, which was bought by Eaton in the 90 s, and the project Engineer has coordinated extensively with Eaton and Ameren UE in the creation of the construction drawings and specifications. For specific information on the required materials, installations and locations, refer to the construction drawings and specifications for this project. Creation of this connection will necessarily involve power outages. All outages of any type should be minimized as much as possible and must be scheduled on weekends. Also, all outages of any type must be scheduled a minimum of 3 weeks in advance with JC Maintenance and Operations. For both Phases: At the beginning of the project, the Contractor will create a Gantt chart or similar spreadsheet to indicate project phasing and supply it to the COR. The contractor shall be responsible for updating the spreadsheet as the project progresses. All work shall comply all VA TIL specifications. All Contractor personnel shall wear the proper safety equipment required by all applicable OSHA, MO State, Federal and VA Safety regulations to accomplish this type of work. All work shall comply with all VA health care provisions, such as ICRA (Infection Control Risk Assessment) provisions, ILSM, and all applicable State and U.S. Federal Codes. For all items removed by this Statement of Work, the Contractor shall be responsible for the safe and legal disposal or recycle of all items listed. The Contractor will have signed paperwork from the disposal site or recycle center indicating all removed items are disposed of properly and in accordance with all applicable State and Federal Codes and Laws. Note: Per 6500.6, CONTRACT SECURITY CHECKLIST FOR INITIATION PHASE OF ACQUISITIONS: The Authorization requirements do not apply, and a Security Accreditation Package is not required." See attached document: TP09 FINAL SPECS PHASE 1 VA JC Generator Combined Specs. See attached document: TP09 FINAL SPECS PHASE 2 657 19 123JC Rebuild Switchgear. See attached document: TP09 (FINAL DRAWINGS) Phase 1 IFC Composite Set\_Phase-1\. See attached document: TP09 (FINAL DRAWINGS) Phase 2 657-19-123JC (Drawings) Rebuild Switchgear- Phase-2\. 

<!-- mobian-agent-ad sponsored="true" id="d36b8e75-2c91-46e2-93a6-959abad8c763" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74fe927937b142cd95a54f929a2f91f1/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66600c7b4c1344dd822288c523ca683f/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ed44aaf6c80c4644859a010e1cf8aa90/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4b6b7ba3e5b64c3d95d00edbee4afdc8/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb8d3b87eb2c41cca9841f9cd2bc0648/download)

## Contacts

* Cedric Graham, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/92dcf771144a451880793c49ff377a2e/view)

[More from United States Department of Veterans Affairs posted in January 2021](/department%5Fof%5Fveterans%5Faffairs/archive/2021-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Z1DA--657-19-123JC Create Emergency Generator Connection and Re-build Existing Main Service Entrance Switchgear. (VA-21-00027928)","description":"Page 5 of 5 FBO NCO15 MATOC SUBCONTRACTING SPECIAL NOTICE THIS INFORMATION IS POSTED FOR SUBCONTRACTING OPPORTUNITIES ONLY. PROPOSALS WILL NOT BE CONSIDERED FROM ANY FIRMS OTHER THAN THE FIVE (5) PREVIOUSLY SELECTED NCO15 MATOC CONTRACTORS ONLY.Â NO SOLICITATION DOCUMENT WILL BE POSTED FOR THIS REQUIREMENT. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY.Â THEREFORE, FAR 5.203 DOES NOT APPLY.Â IDIQ TASK ORDER FOR THE (657-19-123JC Create Emergency Generator Rebuild Existing Main Entrance Switchgear). The attached project requirements specs and drawing are provided for informational purposes only. THE FIVE (5) NCO15 MATOC CONTRACTORS AND CURRENT CONTRACT NUMERS ARE LISTED BELOW: Vendor Name IDIQ Contract Number Company POC Contact number OnSite Construction Group, LLC 36C25518D0043 Jacob Baucom jacob.baucom@onsite-cg.com 816 423-1142 L JBCO Group LLC 36C25518D0045 Lonnie Wilson / Richie Sanders / Ashley Galetti lwilson@kutfconstruction.com richie@ljbco.net / Ashley@ljbco.net 816 291-0580 / 816 550-4557 / 816-802-6394 WFV2 Construction, LLC 36C25518D0046 Mitch Dallas / Joe Vazquez / Bena Roseburrough mitchd@wonfreedom.com /joev@vazquezcc.com /benar@wonfreedom.com 816-914-0641/ 816-569-6869 Global Engineering Services Inc 36C25518D0047 Cole Woodman cole@ges-us.com ; cole.woodman@gmail.com 619 948-8541 B K M-IEC CONSTRUCTION LLC 36C25518D0048 Brent Motley bmotley@bkmconstructionllc.com admin@bkmconstructionllc.com 913 297-0049 Statement of Work VA St. Louis Health Care System Project 657-19-123JC, Phase 1 and Phase 2 Phase 1: Create Emergency Generator Connection Phase 2: Re-build Existing Service Entrance Switchgear Purpose of Project: VA Saint Louis Health Care System, John Cochran Division, requires modifications to the existing Main Service Entrance Switchgear at John Cochran VA Hospital, St. Louis, MO. The work will be done in two phases, which are detailed below. Each phase was designed by AE firm Ross and Baruzzini, however, due the nature of items discovered during the initial design, Construction Administration (CA) will be accomplished by two different companies. Phase 1 CA will be covered by HFS, and phase 2 CA will be administered by Guidon Design, Inc. Phase 2 will only be started when phase 1 is completed and with the written approval of the COR. All work in both phases will be accomplished within 350 days of the notice to proceed (NTP) being issued. Criteria: The Contractor shall provide all labor, material, transportation and equipment to perform the work outlined below. All installed items will be checked by the COR, the project Electrical Engineer and JB Maintenance and Operations (M\u0026O) personnel for complete functionality prior to project completion. If the installed work does not function to the standards of M\u0026O personnel the contractor shall fix any discrepancies at no cost to the Government. The Scope of Work for this project shall consist of the following: Phase 1: The purpose of phase 1 of the project is to create a generator connection that will allow the hospital and all other buildings currently fed from Bldg. 17 (i.e. the main service entrance switchgear) to be fed by emergency generator power. For specific information on the required materials, installations and locations, refer to the construction drawings and specifications for this project. Creation of this connection will necessarily involve power outages. All outages of any type should be minimized as much as possible and must be scheduled on weekends. Also, all outages of any type must be scheduled a minimum of 3 weeks in advance with JC Maintenance and Operations. Phase 2: The purpose of phase 2 of the project is to re-build the existing Main Service Entrance Switchgear in Bldg. 17. Note that this is not new building construction but rather a gut of much of the interior components of the existing building. The intent is to minimize downtime of the switchgear and keep the hospital at 100% power as much as possible. To accomplish this the main-tie will be used, with the generator connection and rented generators (i.e. phase 1) as a back-up. The original switchgear was manufactured by Westinghouse, which was bought by Eaton in the 90 s, and the project Engineer has coordinated extensively with Eaton and Ameren UE in the creation of the construction drawings and specifications. For specific information on the required materials, installations and locations, refer to the construction drawings and specifications for this project. Creation of this connection will necessarily involve power outages. All outages of any type should be minimized as much as possible and must be scheduled on weekends. Also, all outages of any type must be scheduled a minimum of 3 weeks in advance with JC Maintenance and Operations. For both Phases: At the beginning of the project, the Contractor will create a Gantt chart or similar spreadsheet to indicate project phasing and supply it to the COR. The contractor shall be responsible for updating...","url":"https://matchawards.com/department_of_veterans_affairs/posts/105599257851694640","identifier":"36C25521R0048","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2021-01-22","sameAs":"https://sam.gov/opp/92dcf771144a451880793c49ff377a2e/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

