ClickCease J039--Planned Maintenance Elevators (36C24521Q0154) | Closed - MatchAwards

J039--Planned Maintenance Elevators

Status
Closed (archived notice)
Agency
United States Department of Veterans Affairs
Office
LINTHICUM, USA
Notice type
Solicitation
Solicitation number
36C24521Q0154
NAICS
811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
J039 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MATERIALS HANDLING EQUIPMENT
Category
Industrial Products Install / Maintenance / Repair (5.5)
Posted
2021-01-06
Deadline
2021-01-11

Description

GENERAL REQUIREMENTS OF CONTRACT SCOPE Skilled elevator personnel directly employed and supervised by the same company that furnished and installed the elevator equipment and/or third-party vendors certified by the manufacturer to work on that manufacturer s equipment shall perform maintenance service. The types of Equipment at the VA Medical Center Washington DC 20422 are OTIS, MATOT, Motion Controls, , THYSSEN-KRUP and SCHINDLER. Prior to execution of this contract the contractor is responsible for conducting a thorough examination of all elevator equipment including cars inside and out, machine rooms, hoist way equipment and pits. The purpose of the exam is to provide the contractor with first-hand knowledge of the current condition of the equipment and systems. Contractors failure to provide a thorough examination of the equipment does not relieve responsibility under this contract. 1. This service shall include, but not be limited to the following: a. Weekly systematic examination of equipment; b. Cleaning, lubricating, adjusting, repairing and replacing of all parts as necessary to keep the equipment in first-class condition and proper working order; c. Furnishing all lubricant, cleaning materials and parts required. d. Equalizing tension, shortening or renewing of hoisting ropes where necessary. This includes hoisting ropes or other cables determined to need replacement during the semi-annual elevator inspection. Contractor shall provide a unit cost per elevator for hoisting rope renewal as separate bid item and a separate Purchase Order will be issued at that unit price for hoisting rope renewal for the life of this contact. All hoisting rope replacement work performed under this contract will be subject to all terms and conditions of this contract. e. The performance standards set forth in the original specification including flight time, cycle time, and door times, shall be maintained at all times; f. The operational system shall function, to the original standards specified, including any changes and/or adjustments required meeting varying conditions of hospital occupancy. g. Assure smooth starting and stopping and accurate leveling at all times. 2. This maintenance service shall not include the performance of any work required as a result of improper use, accidents, or negligence for which the Contractor is not directly responsible. This contract will include contract line items to cover work performed as a result of improper use, accidents, negligence or abuse. The contractor must submit, as a separate line item a per hour labor rate at both straight time and overtime. 3. Provide 24-hour 7 day per week emergency callback service, which shall consist of promptly responding to calls within two hours for emergency service. Emergency callback service is defined between the hours of 4:30 PM and 8:00 AM Monday through Friday and 24 hours per day Saturday, Sunday and Federal Holidays should a shutdown or emergency trouble develop between regular examinations. Emergency Service call back response time Monday through Friday from 8:00 AM to 4:30 PM excluding Federal Holidays will be thirty minutes. Federal Holidays are: MLK Day, Presidents Day, Memorial Day, July 4th, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas, and New Years Day. 4. Service and emergency personnel shall report to the COR or his authorized representative upon arrival at the hospital and again upon completion of the required work. A copy of the work ticket containing a complete description of the work performed shall be given to the COR. All personnel shall check in at the Energy Control Center located in Building 104 upon arrival and again upon leaving the premises. If the COR is not available the service ticket may be left at the Control Center in Building 1 5. The Contractor shall maintain a website listing the date and time of all weekly examinations and all trouble calls. Each trouble call shall be fully described, including the nature of the call; necessary correction performed, and/or parts replaced. The website will allow authorized VA personnel access at any time remotely 24/7. 6. The contractor must provide Real time monitoring software for each unit to allow the contractor and VA staff to continuously monitor elevator equipment performance to facilitate troubleshooting and predicting operational problems in each unit and it s associated equipment. 7. The Contractor shall obtain all necessary licenses and/or permits required to perform the work under this contract. All costs associated with obtaining necessary licenses and/or permits shall be Contractor s responsibility. 2. CALLS FOR MAINTENANCE SERVICE Contractor shall respond only to calls for service placed by the VA Engineering Service COR or designees A list of names of these individuals will be submitted to the Contractor upon award of the contract. Calls received from anyone else should be relayed to the appropriate VA Engineering COR for investigation. If desired, a call-back verification procedure may be instituted such that the Contractor will call the Engineering contact office to confirm each service call back. SIGNING IN AND OUT The following office is the required contact office for the Contractor at all times: OFFICE LOCATION PHONE Chief of M&O Bldg. 6 BH119 202-745-8000-57698 Control Center (After normal hours) Bldg. 1 GE253 202-745-8000 ext. 5-8405 For each visit to the facility, the Contractor service representative must report to the appropriate office, both upon arrival and prior to departure, to sign "in" and "out" on response log. Response time will be determined by the first appearance of a service representative at the appropriate office in response to a particular call. Response log entries may be used in substantiating invoice validity. 3. INCLUDED WORK Contract includes full maintenance for the equipment listed in the attached schedule of vertical transport systems, consisting of scheduled preventive maintenance (See Paragraph 5), periodic testing, corrective call back service for operational problems not successfully preempted by PM (See Paragraph 6), and 24-hour, 7-day per week emergency call back service, (See Paragraph 7). Contractor will provide all resources required in performing these maintenance services and inspections, including parts, materials, lubricants, hydraulic fluids, cleaning fluids, equipment, tools, shipping, travel, and labor (with exception of emergency overtime charges specified elsewhere). Contractor is responsible to determine the nature and extent of any work required to restore equipment to satisfactory condition and operation. All maintenance on covered equipment shall be performed in accordance with manufacturer guidelines and/or the following industry standards, as applicable, whichever is more stringent: ASME A17.1 Safety Code for Elevators and Escalators, latest edition ASME A 17.2 Inspectors' Manual for Elevators and Escalators, latest edition ASME A17.3 Safety Code for Existing Elevators and Escalators, latest edition NEIT Vertical Transportation Standards for Elevators, Escalators, and Dumbwaiters, latest edition NFPA 70 National Electric Code, latest edition For any apparatus where such guidelines are not specifically called out, Contractor shall service aIl apparatus (as a minimum) to the common practice standards of the Industry for the equipment. Contractor shall submit to the VA for approval a PM, testing and maintenance check chart or checklist to the VA COR for each covered component or assembly. Covered equipment listed on the schedule encompass all system components and associated apparatus as normally supplied and required for operation by the manufacturers in the currently installed configuration, including integrity of connections to building utilities, excluding building utility supply lines up to the point of manufacturer provided hardware. Replacement of interior car lights and monthly cleaning of all elevator pits is included. Cleaning of interior of cars and exterior hoist way frames and doors, are excluded. The PM, maintenance and testing checklist shall be in accordance with all current ASME, NFPA and all other applicable standards. Contract covers maintenance services required due to normal wear and tear by all parties. Disrepair caused by proven negligent misuse or vandalism is not covered, and in such instances Contractor shall service notice of such to the VA based upon the additional contract line items to cover parts and services that is offered as part of this contract. This work shall not be done unless specifically authorized as described in Paragraph 8. Allowance will be made for unique instances of "operator error." If an equipment user has mistakenly reported an equipment operating problem for a maintenance problem, contractor will provide a written explanation of the reason why the equipment was not operating as desired, and detail. the proper method of operation to avoid repetition of the situation. Repeated instances of the problem by the same VA service (department, e.g., Nutrition & Food Service) on the same model equipment are not covered under this provision, and will be handled per Paragraph 8. NORMAL WORK HOURS Provide 24-hour 7 day per week emergency callback service, which shall consist of promptly responding to calls within two hours for emergency service. Emergency callback service is defined between the hours of 4:30 PM and 8:00 AM Monday through Friday and 24 hours per day Saturday, Sunday and Federal Holidays should a shutdown or emergency trouble develop between regular examinations. Emergency Service call back response time Monday through Friday from 8:00 AM to 4:30 PM excluding Federal Holidays will be one hour response by phone and four hour onsite response. Federal Holidays are: MLK Day, Presidents Day, Memorial Day, July 4th, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas, and New Years Day. 5. PREVENTIVE MAINTENANCE AND PERIODIC TESTING For all covered traction type elevators and cart lifts, Contractor shall schedule and perform comprehensive PM consisting of weekly condition/performance inspections, and extended monthly service performed according to a monthly, quarterly, semi-annual, or annual schedule, as indicated by the applicable PM, testing and maintenance check charts and checklists approved by the VA. Contractor shall also provide weights and perform annual and five-year inspection tests as per ASME A 17.1 and A 17.2 Code, cooperating with a certified inspector contracted by VA to witness tests and record results. Attached vertical transport system schedule indicates systems due for testing during contract term. For all covered hydraulic-type elevators. Contractor shall schedule and perform comprehensive PM consisting of bi-weekly condition/performance inspections, and extended monthly service performed according to a monthly, quarterly, semi-annual, or annual schedule, as indicated by the applicable PM, maintenance and testing check charts and checklists. Contractor shall also provide weights and perform annual and three-year inspection tests as per ASME A 17.1 and A 17.2 Code, cooperating with a certified inspector contracted by VA to witness tests and record results. Attached vertical transport system schedule indicates systems due for testing during contract term. For all covered dumbwaiter systems, Contractor shall schedule and perform comprehensive PM consisting of bi-weekly condition/performance inspections, and extended monthly service performed according to a monthly, quarterly, semi-annual, or annual schedule. Contractor shall also provide weights and perform annual and five-year inspection tests as per ASME A 17.21 and A 17.2 Code, cooperating with a certified inspector contracted by VA to witness tests and record results. Attached vertical transport system schedule indicates systems due for testing during contract term. All check charts must be electronic and can be web based. The contractor will submit to the VA for approval check charts and checklists indicating the frequency and schedule for applicable items, and the methods for performing this service. Contractor shall perform service in accordance with industry or manufacturer service recommendations as per Paragraph 3. The monthly PM check charts include an item for Contractor to certify the reliability of all life-safety critical components and shall be filled out and submitted upon completion of the monthly PM service. The weekly or bi-weekly PM service, of one-hour minimum duration per unit, shall be conducted to find and correct any problems. Contractor shall immediately resolve deficiencies, including items designated for specific attention under monthly inspections. Contractor shall complete approved weekly/bi-weekly PM check charts and checklists to indicate whether specific key items were found to require maintenance and the nature of service performed. The check charts and checklists shall be turned in to the contact office when work has been completed for the day. During all PM service, any specific device cleaning, lubrication, adjustment or part replacement which is performed shall be indicated on accompanying service reports. PM visits shall be performed at times convenient to the VA, with weekly or bi-weekly PM being conducted according to a pre-arranged recurring schedule, to be specified or approved by the VA Engineering COR within two weeks after receipt of NOTICE TO PROCEED. Weekly/bi-weekly and monthly PM service shall include, but are not limited to: 1. Systematic examination of system condition/performance, which includes as a minimum riding in car to each floor (elevators) or transporting loads to various floors (cart lifts, dumbwaiters), checking audible/ visual indicators and system response to call buttons or switches at landing stations, inspecting machinery and mechanical spaces, inspecting all door safety interlocks and submitting findings and corrections in detailed service report and PM check chart. 2. Cleaning, lubricating, adjusting, and replacing of all parts as necessary to keep the equipment in full and proper working order, and to keep all parts and apparatus within manufacturer accepted tolerance specifications. 3. Equalizing tensions, shortening or renewing of hoisting ropes where necessary. 4. Keeping equipment adjusted to original or currently specified performance standards at all times, including flight times, cycle time and door times. 5. Assuring continuously smooth starting and stopping, accurate leveling, and freedom from performance deterioration perceptible to occupants, such as shaking, hesitation, vibrations, rattles or squeaks. 6. Keeping machinery and mechanical spaces clean and free of rubbish. 7. Scheduled service includes, but is not limited to, items on approved PM check charts and checklists. 8. As part of this contract the contractor will install electronic troubleshooting software that sends out alerts to contractor staff of impending maintenance issues. These electronic alerts will help the staff in determining frequencies of PM, maintenance and testing and help contract staff in quickly recognizing and rectifying problems. 9. Contractor will also coordinate and assist with VA Fire Alarm contract staff in performing any related annual fire alarm testing for each elevator.(time allotted 16 hours per year) 10. Contractor will also coordinate and assist with 3rd party Elevator inspector in performing any annual, semiannual and five (5) year inspections for each elevator. Annual inspections-8 hours Semi Annual inspections -8 hours 5 year test-40 hours Contractors failure to schedule and perform a PM within the specified time interval shall be considered non-compliance with terms of contract, and VA will deduct proportionately from payments for services missed. Criticality of this equipment requires that continued such failure will necessitate holding Contractor in default and the VA obtaining suitable service via separate means. Where specific maintenance procedures or guidelines are given by the VA, Contractor will perform in accordance with these guidelines in addition to industry guidelines described in Paragraph 3, INCLUDED WORK. If a specific procedure is not given by the VA, the manufacturer's recommended PM procedure, as described in their service manual, will be followed. 6. CORRECTIVE MAINTENANCE CALL BACK SERVICE. Contractor shall provide, at no additional cost, corrective maintenance call back service for malfunctions during VA administrative hours, not successfully preempted by PM service. A Contractor representative shall report to the Engineering contact office prepared with sufficient material and labor resources to complete repairs, within two hours (outside of normal hours) of notice by VA of a performance problem with covered equipment and within thirty minutes of notice during VA Administrative Hours. VA may choose to specify a later, more convenient time for beginning the work, and the Contractor will report at the designated date and time. It is highly recommended that the successful bidder leave a contract employee on station at all times during normal working hours due to the large number of machines included in this scope and because of the extremely high use rate experienced by each machine. Contractor shall proceed without unreasonable delay to troubleshoot and correct reported problems, while minimizing time equipment is out of service. Contractor shall provide detailed explanation and documentation for any problems which cannot be resolved the day work is begun. When any malfunction is reported far a covered system while contractor representative is on site for any other service, Contractor shall investigate prior to departing site, restoring operation as soon as necessary materials and equipment are available. 7. EMERGENCY CALL BACK Contractor shall respond to emergency service calls twenty-four hours per day, seven days per week, including federal holidays, within two hours of notice. When the immediate safety of equipment or persons in and about the vertical transport system is potentially jeopardized by system malfunction, Contractor shall respond as soon as possible, but within two hours, without additional charge. Such service shall be limited to safely removing persons trapped in stalled cars, and minor adjustments and repairs necessary to alleviate the perilous conditions. It would also include the continued operation of units considered critical to MEDVAMC operations. When emergency service does not rectify all problems, Contractor shall return to the VA by 7:00 a.m. the following work day to restore proper operation. For all such after-hours service, Contractor shall provide a pre-determined rate for overtime maintenance service and Contractor will be paid via parts and service allotment purchase order for overtime charges, as described in Paragraph 8, OTHER WORK. 8. OTHER WORK Maintenance problems discovered on equipment covered by this contract which the Contractor believes exceed the scope of contract provisions, must not be worked on without concurrence and specific authorization from the Engineering COR to perform repairs. The Contractor must immediately notify the Engineering COR of any equipment or environmental conditions which impair or jeopardize the functioning of the equipment. In any case, the VA must be explicitly notified in advance that additional charges will be incurred, prior to beginning such work. In such instances that the VA agrees the work is not within the scope of the contract, and the VA desires the Contractor to perform repairs. Any service required which the Contractor believes to be in excess of the contract provisions and require additional payment (e.g., work beyond normal work hours) must not be performed without prior authorization from the Engineering COR or the labor and parts rider order to pay for the additional service if desir

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in January 2021

More lists