<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/104959416789705940" -->

---
title: J099--Solar PV Service (36C25820Q0386) - MatchAwards
description: J099--Solar PV Service. United States Department of Veterans Affairs. Solicitation 36C25820Q0386. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. PERFORMANCE WORK STATEMENT (PWS) Solar Photovoltaic Arrays Maintenance and Repair Southern Arizona VA Health Care...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/104959416789705940
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J099--Solar PV Service (36C25820Q0386)
og:url: https://matchawards.com/department_of_veterans_affairs/posts/104959416789705940
og:description: J099--Solar PV Service. United States Department of Veterans Affairs. Solicitation 36C25820Q0386. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. PERFORMANCE WORK STATEMENT (PWS) Solar Photovoltaic Arrays Maintenance and Repair Southern Arizona VA Health Care...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J099--Solar PV Service

Status

Closed (archived notice)

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

MESA, USA

Notice type

Special Notice

Solicitation number

36C25820Q0386

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

J099 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS

Posted

2020-10-01

Deadline

Not stated

## Description

PERFORMANCE WORK STATEMENT (PWS) Solar Photovoltaic Arrays Maintenance and Repair Southern Arizona VA Health Care System PART 1 General Information GENERAL: This is a non-personnel services contract to provide Solar Photovoltaic Arrays Maintenance, Repair, and Cleaning. This contract includes the 12 carport arrays and the ground -mount array and tracker system. This is a full maintenance contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. D escription of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Solar Photovoltaic Arrays Maintenance and Repair as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract. B ackground: The Southern Arizona VA Health Care System (SAVAHCS) has thirteen solar arrays/ inverters on-site. Twelve of the Solar PV inverters are Advanced Energy Solaron® Grid-Tie inverters, and one is a Satcon PowerGate® Plus inverter. Twelve of the arrays are carport-structure arrays, and one array is a ground-mount, single-axis tracking array. The ground-mount tracking system is a RayTracker GC. The total capacity of the solar PV arrays is 4.5 MW dc (nameplate). The ground-mount array and carport structure arrays were built by REC Solar, Inc. (now known as REC Solar Commercial Corporation): The PV modules have a minimum 20-year limited warranty that modules will generate no less than 80% of rated output under Standard Test Conditions (STC) Ground-Mount Array (came on-line in August 2010): The Ground-Mount array has a five-year warranty from both the manufacturer and installer, including parts and labor. The RayTracker has a 20-year extended warranty(a normal five-year warranty plus a purchased 15-year warranty). \[NOTE: First Solar acquired RayTracker is 2011\. At the time of the writing of this scope, First Solar is hoping to leave the tracker business and is hoping to negotiate with the VA regarding the 20-year warranty.\] The Satcon Inverter has a 10-year warranty. \[NOTE: CEC Greatwall acquired Satcon in 2014.\] Carport Structures (Phase 1 came on-line gradually starting in July 2011; Phase 2 came on-line gradually starting in October 2012): The Carport Structures photovoltaic system has a 10-year limited warranty. The Advanced Energy Solaron Inverters have a 5-year warranty plus a 5-year extended warranty (10-year total). \[NOTE: Bold Renewables purchased Advanced Energy Solaron inverters 2019.\] Refer to Technical Exhibit 4 for a site plan of the arrays. Refer to Technical Exhibit 5 for inverter, array, and module details. O bjectives: The objective of this contract is to maintain and document safe and efficient operation of the arrays and inverters. S cope: The Contractor shall furnish all parts, labor, equipment, qualified personnel, qualified supervision, and transportation necessary to provide training, maintenance, repair, inspection and cleaning of the thirteen SAVAHCS Solar PV inverters and arrays. G eneral Information Site-Specific Safety Plan: The Contractor shall develop and maintain an effective Site-Specific Safety Plan to ensure services are performed in accordance with standard electrical and PV safety practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure safe services. The Contractor Site-Specific Safety Plan shall include a list of the Contractor-required safety training and a written procedure for Contractor personnel to follow in the event of a medical or site emergency. The Site- Specific Safety Plan is to be delivered within 3 weeks after contract award (refer to Technical Exhibit 2). Quality Assurance: The government shall evaluate the Contractor under this contract in accordance with the Performance Requirements Summary (refer to Technical Exhibit 1). This summary is primarily focused on what the Government must do to ensure that the Contractor has performed in Accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). Recognized Holidays: The Contractor is not required to perform service on federal holidays. Labor Day Columbus Day Presi Memorial Day Thanksgiving Day Independence Day Christmas Day Hours of Operation: For NORMAL SERVICES: The Contractor is responsible for conducting business, between the hours of 7:00 am and 5:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. When Normal Service requires that an inverter or array be taken off-line, that service should be accomplished in a timely manner to reduce the number of hours the array is off-line during Tucson Electric Power (TEP) On-Peak hours (refer to Part 2, Definitions and Acronyms). For other than firm fixed price contracts, the Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. For SERVICES OUTSIDE OF NORMAL SERVICES: Hours of Operation as agreed to in writing between the Contractor and Contracting. Place of Performance: The work to be performed under this contract will be performed at the Southern Arizona VA Health Care System, 3601 S. 6th Avenue, Tucson, AZ 85723\. T ype of Contract: The government will award a full maintenance contract. S ecurity Requirements: Contractor personnel performing work under this contract must have a general employment background check at the time of the proposed submission and must maintain the level of security required for the life of the contract. PHYSICAL Security: The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. Key and Badge Control: Prior to commencing any work, Contractor personnel will sign -out a temporary badge and key(s) from either the M&O Supervisor, the Electric Shop, or the COR. The Contractor shall establish and implement methods of making sure all badges/keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No badges or keys issued to the Contractor by the Government shall be duplicated. Such procedures shall include turn-in of any issued badges and keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate badges/keys/key cards to the M&O Supervisor and the COR. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the r r shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas. Upon authorization in writing by the COR, the Contractor may open locked areas for subcontractor personnel engaged in the performance of assigned work in those areas (e.g., inverter or meter personnel). Lock Combinations. N/A Q ualifications: Contractor Project Manager/Field Supervisor shall have at least 3 years of Solar PV experience and possess an Occupational Safety and Health (OSHA) 30-Hour Training Course card. Additionally, being a North American Board of Certified Energy Practitioners (NACEP) Certified PV Installation Professional is preferred. The Lead Solar PV Technician shall have at least 2 years of electrician experience; 1 year of Solar PV experience; and possess at least an OSHA 10-Hour Training Course card. Additionally, evidence of passing the NABCEP Entry Level Exam is preferred. Copies of the OSHA-30 and OSHA-10 training cards are to be delivered within 3 weeks after contract award (refer to Technical Exhibit 2). Post Award Conference: The Contractor agrees to attend any post a ward conference convened by the contracting activity or contract administration office in accordance with Federal Acquisitio n Regulation Subpart 42.5\. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. Key Personnel: The follow personnel are considered key personnel by the government: Contract Manager, Project Manager/Field Supervisor. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer and the COR. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. Contractor personnel shall wear (or, if wearing the badge presents a safety concern, keep the badge in their pocket or in their vehicle) their visit prior to commencing any work at the facility (refer to Section 1.5.7.2, Key and Badge Control). Contractor Travel: \[N/A\]. Other Direct Costs: ODCs must be preapproved by the Contracting Officer. Examples of ODCs applicable to this PWS include inverter MOXA box replacements not covered under warranty; inverter controller board replacement not covered under warranty; tracker system controller board replacement not covered under warranty; inverter cooling fans not covered under warranty; and PV modules. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. Organizational Conflict of Interest: Contractor and sub-Contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5\. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI. 1.5.18 PHASE-IN / PHASE-OUT PERIOD: Note: The Phase-In Period does not apply to this contract. In the event that this contract proceeds to a Phase-Out Period, to minimize any decreases in productivity and to prevent possible negative impacts, the Contractor shall have personnel/services available during the 21- day phase-out period. PART 2 DEFINITIONS & ACRONYMS D EFINITIONS AND ACRONYMS: D EFINITIONS: CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The Contracting Officer is the only individual who can legally bind the government. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement. DELIVERABLE. Anything that can be physically delivered and may include non-manufactured things such as meeting minutes or reports. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. 2.1.7 MAINTENANCE. Activities required or undertaken to conserve the original asset or resource (e.g., filter replacement, String Combiner Box fuse replacement, Inverter fuse replacement, bolt torqueing). PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements. 2.1.11 REPAIR. Activities required or undertaken to replace a broken, damaged, or failed device or equipment to return the device or equipment to an operating or usable condition (e.g., failed Inverter Cooling fan, failed MOXA box, failed fuse in Array Combiner Box). 2.1.12\. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the sub-Contractor. JUNE 2020 Page 6 TEP ON-PEAK HOURS: Currently, the TEP On-Peak hours are as follows: Season Calendar Time Frame Daily Time Frame Hourly Time Frame Summer May 1 through September 30 Monday through Friday (excluding Memorial Day, Independence Day, and Labor Day) 2 pm to 8 pm Winter October 1 through April 30 Monday through Friday (excluding Thanksgiving Day, Christmas Day, 6 am to 10 am and 5 pm to 9 pm Take note that TEP holidays do not always align with federal holidays. Hours other than those detailed above are defined as TEP Off-Peak hours. Historically, TEP has occasionally redefined the time frame of On-Peak and Off-Peak hours. In the event that such a change occurs, Contracting will inform the Contractor of the change. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract. WORK WEEK. Monday through Friday, unless specified otherwise. A CRONYMS: ACOR Alternate Contracting Officer's Representative CFR Code of Federal Regulations COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QC Quality Control TE Technical Exhibit PART 3 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES G OVERNMENT FURNISHED ITEMS AND SERVICES: 3.1\. Services: The Government will either provide personnel to open inverter enclosures; array enclosures; and combiner box enclosures which may need to be accessed in order to perform the services under this contract; or will allow the Contractor personnel to check-out a key and temporary badge (refer to Section 1.5.7.2, Key and Badge Control). Utilities: The Government will provide access to a water source if they are required for performance of services (e.g., PV module cleaning). The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning equipment and ensuring that the inverter/array is fully on-line and properly inverting before locking up and leaving the site. During routine servicing, if it is necessary to take an inverter or ar 

<!-- mobian-agent-ad sponsored="true" id="c772c5e3-fca4-416a-b3f7-e7c8b1e7ef73" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/faa9d47a0f61450ca837be0c53bf6bc6/download)

## Contacts

* TAMMY J PERRINE, CONTRACT SPECIALIST

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/826613a051db4e54969c91d1923538b3/view)

[More from United States Department of Veterans Affairs posted in October 2020](/department%5Fof%5Fveterans%5Faffairs/archive/2020-10)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J099--Solar PV Service","description":"PERFORMANCE WORK STATEMENT (PWS) Solar Photovoltaic Arrays Maintenance and Repair Southern Arizona VA Health Care System PART 1 General Information GENERAL: This is a non-personnel services contract to provide Solar Photovoltaic Arrays Maintenance, Repair, and Cleaning. This contract includes the 12 carport arrays and the ground -mount array and tracker system. This is a full maintenance contract. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. D escription of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Solar Photovoltaic Arrays Maintenance and Repair as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract. B ackground: The Southern Arizona VA Health Care System (SAVAHCS) has thirteen solar arrays/ inverters on-site. Twelve of the Solar PV inverters are Advanced Energy Solaron® Grid-Tie inverters, and one is a Satcon PowerGate® Plus inverter. Twelve of the arrays are carport-structure arrays, and one array is a ground-mount, single-axis tracking array. The ground-mount tracking system is a RayTracker GC. The total capacity of the solar PV arrays is 4.5 MW dc (nameplate). The ground-mount array and carport structure arrays were built by REC Solar, Inc. (now known as REC Solar Commercial Corporation): The PV modules have a minimum 20-year limited warranty that modules will generate no less than 80% of rated output under Standard Test Conditions (STC) Ground-Mount Array (came on-line in August 2010): The Ground-Mount array has a five-year warranty from both the manufacturer and installer, including parts and labor. The RayTracker has a 20-year extended warranty(a normal five-year warranty plus a purchased 15-year warranty). [NOTE: First Solar acquired RayTracker is 2011. At the time of the writing of this scope, First Solar is hoping to leave the tracker business and is hoping to negotiate with the VA regarding the 20-year warranty.] The Satcon Inverter has a 10-year warranty. [NOTE: CEC Greatwall acquired Satcon in 2014.] Carport Structures (Phase 1 came on-line gradually starting in July 2011; Phase 2 came on-line gradually starting in October 2012): The Carport Structures photovoltaic system has a 10-year limited warranty. The Advanced Energy Solaron Inverters have a 5-year warranty plus a 5-year extended warranty (10-year total). [NOTE: Bold Renewables purchased Advanced Energy Solaron inverters 2019.] Refer to Technical Exhibit 4 for a site plan of the arrays. Refer to Technical Exhibit 5 for inverter, array, and module details. O bjectives: The objective of this contract is to maintain and document safe and efficient operation of the arrays and inverters. S cope: The Contractor shall furnish all parts, labor, equipment, qualified personnel, qualified supervision, and transportation necessary to provide training, maintenance, repair, inspection and cleaning of the thirteen SAVAHCS Solar PV inverters and arrays. G eneral Information Site-Specific Safety Plan: The Contractor shall develop and maintain an effective Site-Specific Safety Plan to ensure services are performed in accordance with standard electrical and PV safety practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure safe services. The Contractor Site-Specific Safety Plan shall include a list of the Contractor-required safety training and a written procedure for Contractor personnel to follow in the event of a medical or site emergency. The Site- Specific Safety Plan is to be delivered within 3 weeks after contract award (refer to Technical Exhibit 2). Quality Assurance: The government shall evaluate the Contractor under this contract in accordance with the Performance Requirements Summary (refer to Technical Exhibit 1). This summary is primarily focused on what the Government must do to ensure that the Contractor has performed in Accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). Recognized Holidays: The Contractor is not required to perform service on federal holidays. Labor Day Columbus Day Presi Memorial Day Thanksgiving Day Independence Day Christmas Day Hours of Operation: For NORMAL SERVICES: The Contractor is responsible for conducting business, between the hours of 7:00 am and 5:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility...","url":"https://matchawards.com/department_of_veterans_affairs/posts/104959416789705940","identifier":"36C25820Q0386","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J099 - MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS"}],"availabilityStarts":"2020-10-01","sameAs":"https://sam.gov/opp/826613a051db4e54969c91d1923538b3/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

