SHAKOPEE MDEWAKANTON SIOUX COMMUNITY
- Agency
- United States Department of the Interior
- NAICS
- 212399 - All Other Nonmetallic Mineral Mining
- Period start
- 2026-08-17
- Period end
- 2028-08-17
- Budget
- 387828.0
- Place of performance
- PRIOR LAKE, MINNESOTA, UNITED STATES
Description
DESCRIPTION AND NEEDS: THE SHAKOPEE MDEWAKANTON SIOUX COMMUNITY (SMSC) PROPOSES TO CONDUCT A COMMUNITY-WIDE GEOTHERMAL RESOURCE ASSESSMENT TO EVALUATE THE TECHNICAL FEASIBILITY, SCALABILITY, AND ECONOMIC VIABILITY OF DEPLOYING GEOTHERMAL HEATING AND COOLING SYSTEMS ACROSS SMSC OWNED AND MANAGED LANDS. THE PROJECT WILL FOCUS ON A MINIMUM OF 5 PRIORITY SITES FOR PLANNED DEVELOPMENT AREAS WHICH MAY INCLUDE FUTURE HIGH-ENERGY-USE COMMERCIAL AND RESIDENTIAL FACILITIES. THIS PROJECT ADDRESSES A CRITICAL BARRIER TO GEOTHERMAL DEPLOYMENT: THE LACK OF SITE-SPECIFIC SUBSURFACE DATA AND ENGINEERING ANALYSIS REQUIRED TO INFORM SYSTEM DESIGN AND INVESTMENT DECISIONS. WHILE SMSC HAS DEMONSTRATED STRONG LEADERSHIP IN SUSTAINABILITY THROUGH ITS NATIVEGREEN INITIATIVE AND BROADER CLIMATE PLANNING EFFORTS, INCLUDING ITS PRIORITY CLIMATE ACTION PLAN (PCAP), GEOTHERMAL SYSTEMS HAVE NOT YET ADVANCED BEYOND HIGH-LEVEL EVALUATION DUE TO LIMITED SUBSURFACE CHARACTERIZATION. THE PCAP IDENTIFIES THERMAL ENERGY NETWORKS AND GEOTHERMAL SYSTEMS AS PRIORITY MEASURES FOR REDUCING GREENHOUSE GAS EMISSIONS AND IMPROVING LONG-TERM ENERGY SYSTEM PERFORMANCE. THIS PROPOSED ASSESSMENT DIRECTLY ADVANCES THOSE PRIORITIES BY GENERATING THE TECHNICAL DATA NEEDED TO EVALUATE GEOTHERMAL SYSTEM FEASIBILITY, REDUCE DESIGN UNCERTAINTY, AND SUPPORT INFORMED CAPITAL PLANNING. WITHOUT THIS STUDY, SMSC LACKS THE DATA REQUIRED TO DETERMINE WHICH SITES CAN SUPPORT COST-EFFECTIVE GEOTHERMAL DEPLOYMENT AND HOW THESE SYSTEMS SHOULD BE DESIGNED AT A COMMUNITY SCALE. OBJECTIVES: THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO DEVELOP A COMPREHENSIVE, SITE-SPECIFIC UNDERSTANDING OF GEOTHERMAL POTENTIAL ACROSS SMSC LANDS TO SUPPORT FUTURE PROJECT DEVELOPMENT. KEY OBJECTIVES INCLUDE: (1) DEVELOP SITE-SPECIFIC GEOTHERMAL RESOURCE DATA AND FEASIBILITY ASSESSMENTS ACROSS A MINIMUM OF 5 PRIORITY SITES, INCLUDING SUBSURFACE CHARACTERIZATION THROUGH DRILLING AND THERMAL TESTING (2) EVALUATE AND DEFINE VIABLE GEOTHERMAL SYSTEM CONFIGURATIONS, INCLUDING PRELIMINARY SYSTEM SIZING, WELLFIELD DESIGN CONCEPTS, AND PERFORMANCE EXPECTATIONS FOR PLANNED FACILITIES (3) ESTABLISH A CLEAR PATHWAY TO IMPLEMENTATION BY ANALYZING TECHNICAL AND ECONOMIC FACTORS AND DEVELOPING A PHASED DEPLOYMENT STRATEGY TO ADVANCE PRIORITY PROJECTS INTO DESIGN, FINANCING, AND CONSTRUCTION OUTCOMES: THE PROJECT WILL PRODUCE A SET OF TECHNICAL AND PLANNING OUTPUTS THAT ESTABLISH A CLEAR FOUNDATION FOR GEOTHERMAL DEPLOYMENT ACROSS SMSC OWNED AND MANAGED LANDS. THESE OUTPUTS INCLUDE SITE-SPECIFIC SUBSURFACE DATA, CONCEPTUAL SYSTEM DESIGNS, AND PRELIMINARY CAPACITY ESTIMATES FOR EACH PRIORITY SITE. THE ANALYSIS WILL ALSO PROVIDE PLANNING-LEVEL COST RANGES AND ENERGY SAVINGS ESTIMATES TO SUPPORT FINANCIAL DECISION-MAKING. RESULTS WILL BE INTEGRATED INTO A GIS-BASED RESOURCE MAP AND A PHASED IMPLEMENTATION ROADMAP IDENTIFYING PRIORITY PROJECTS AND NEXT STEPS. COLLECTIVELY, THESE OUTCOMES WILL REDUCE UNCERTAINTY, SUPPORT INFORMED CAPITAL PLANNING, AND POSITION SMSC TO ADVANCE GEOTHERMAL SYSTEMS INTO DESIGN, FINANCING, AND IMPLEMENTATION.More from United States Department of the Interior posted in October 2026