MESA GRANDE BAND OF MISSION INDIANS
- Agency
- United States Department of the Interior
- NAICS
- 221310 - Water Supply and Irrigation Systems
- Period start
- 2026-09-18
- Period end
- 2028-08-31
- Budget
- 993870.0
- Place of performance
- SANTA YSABEL RESERVATION, CALIFORNIA, UNITED STATES
Description
PROJECT OVERVIEWTHE MESA GRANDE BAND OF MISSION INDIANS (MESA GRANDE) PROPOSES A COMPREHENSIVE WATER SYSTEM DEVELOPMENT AND REHABILITATION PROJECT TO SUPPORT ITS ORGANIC FARMING OPERATIONS AND THE TRIBES FIRST HOUSING DEVELOPMENT ON TRIBAL LANDS IN OVER 30 YEARS. THIS INITIATIVE BUILDS UPON GROUNDWATER RESOURCES DEVELOPED THROUGH PREVIOUS BUREAU OF RECLAMATION (BOR) FUNDED PROJECTS. THESE EFFORTS ARE CRITICAL TO THE SUCCESS OF FUTURE HOUSING, AGRICULTURE, AND ECONOMIC DEVELOPMENT EFFORTS AT MESA GRANDE.BACKGROUND AND NEEDHOUSING DEVELOPMENT ON THE RESERVATION HAS BEEN CONSTRAINED BY STEEP AND ROCKY TERRAIN. HOWEVER, THE RECENT TRANSFER OF THE GOLDEN EAGLE FARM FROM FEE TO TRUST STATUS HAS OPENED NEW POSSIBILITIES FOR HOUSING, ENABLING THE TRIBE TO PURSUE ITS VISION OF CREATING A WELCOMING AND INCLUSIVE COMMUNITY FOR UP TO 1,500 TRIBAL MEMBERS. THE INITIAL FOCUS IS ON SERVING THE MOST VULNERABLE POPULATIONS THROUGH PHASE 1 OF THE HOUSING PLAN ON THE NORTH FIELD OF THE GOLDEN EAGLE FARM.THE GOLDEN EAGLE FARMS WATER SYSTEM WAS ORIGINALLY DEVELOPED IN THE 1970S BY PREVIOUS OWNERS TO SUPPORT EQUESTRIAN ACTIVITIES. IT INCLUDES FOUR ACTIVE WELLS, A 200,000-GALLON MAIN STORAGE TANK, THREE SMALLER 10,000-GALLON TANKS, AND AN UNDERGROUND DISTRIBUTION SYSTEM. WHEN THE MESA GRANDE BAND ACQUIRED THE PROPERTY IN 2017, THE WATER INFRASTRUCTURE WAS ALREADY IN POOR CONDITION DUE TO YEARS OF MINIMAL MAINTENANCE. FINANCIAL CONSTRAINTS HAVE LIMITED THE TRIBES ABILITY TO PROPERLY MAINTAIN, REPAIR, OR UPGRADE THE AGING SYSTEM.PROJECT COMPONENTSOFF-GRID WATER DELIVERY SYSTEMTHE PROJECT SEEKS TO ACCESS GROUNDWATER WITHOUT RELIANCE ON THE ELECTRICAL GRID. SOLAR-POWERED WELL PUMP SYSTEMS WILL BE INSTALLED AT TWO PREVIOUSLY SITED AND DRILLED WELLS IN MOUNTAINOUS TERRAIN ON THE 900 ACRE TRACT. WATER WILL BE DELIVERED BY GRAVITY TO THE NORTH FIELD, CREATING A FULLY OFF-GRID WATER DELIVERY SYSTEM. THIS DESIGN ENSURES ENERGY INDEPENDENCE AND OPERATIONAL SUSTAINABILITY.SYSTEM FLEXIBILITY AND REDUNDANCYTWO SEPARATE WATER SOURCES WILL SUPPORT INDEPENDENT STORAGE AND DISTRIBUTION SYSTEMS, ENHANCING SYSTEM FLEXIBILITY AND REDUNDANCY. WHILE THE INITIAL SYSTEM WILL OPERATE OFF-GRID, FUTURE PLANS INCLUDE EXTENDING ELECTRICAL INFRASTRUCTURE TO THE NORTH FIELD AND EVENTUALLY TO THE 900 ACRE TRACT, ALLOWING FOR GRID INTEGRATION IF NEEDED.PUBLIC HEALTH, SAFETY BENEFITS, AND EMERGENCY PREPAREDNESSTHE INSTALLATION OF TWO WATER STORAGE TANKS WILL PROVIDE A RELIABLE EMERGENCY WATER SUPPLY FOR RESIDENTS OF THE BLACK CANYON TRACT, TRACT 2, AND THE SURROUNDING COMMUNITY. THESE TANKS WILL BE VITAL DURING WILDFIRES AND EXTREME HEAT EVENTS, WHICH ARE INCREASINGLY COMMON IN THE REGION.WATER CONSERVATION AND EFFICIENCYUPGRADES TO THE WATER DISTRIBUTION SYSTEM AT THE GOLDEN EAGLE FARM WILL REDUCE WATER LOSSES AND IMPROVE OPERATIONAL EFFICIENCY. WATER METERS AND ISOLATION VALVES WILL ENABLE THE TRIBE TO MONITOR USAGE, DETECT LEAKS, AND ISOLATE SECTIONS OF THE SYSTEM FOR MAINTENANCE WITHOUT DISRUPTING SERVICE.CONTAMINATION PREVENTIONBACKFLOW PREVENTERS WILL BE INSTALLED TO PROTECT THE WATER SUPPLY FROM CONTAMINATION DUE TO PRESSURE DROPS OR LINE BREAKS. REFURBISHMENT OF THE 200,000-GALLON WATER STORAGE TANK WILL REDUCE EVAPORATION AND PROTECT THE WATER FROM ENVIRONMENTAL HAZARDS.TRIBAL SOVEREIGNTY AND COMMUNITY IMPACTTHIS PROJECT AFFIRMS TRIBAL SOVEREIGNTY BY ENABLING THE TRIBE TO DEVELOP AND MANAGE ITS OWN WATER INFRASTRUCTURE USING GROUNDWATER RESOURCES. IT SUPPORTS THE TRIBES HOUSING AND ECONOMIC DEVELOPMENT GOALS WHILE BUILDING THE CAPACITY TO DEVELOP A SUSTAINABLE GROUNDWATER MANAGEMENT PROGRAM TO PROTECT TRIBAL GROUNDWATER RESOURCES FOR CURRENT AND FUTURE GENERATIONS.More from United States Department of the Interior posted in October 2026