GUNNISON CONSERVATION DISTRICT
- Agency
- United States Department of the Interior
- NAICS
- 924120 - Administration of Conservation Programs
- Period start
- 2026-09-18
- Period end
- 2031-09-30
- Budget
- 749843.73
- Place of performance
- COLORADO, UNITED STATES
Description
UPPER COLORADO BASIN REGION BUCKET 2 ECOSYSTEM (B2E) FINANCIAL ASSISTANCE PROGRAM PROVIDES FUNDING FOR PROJECTS THAT PROVIDE ENVIRONMENTAL BENEFITS AND RESTORATION OF ECOSYSTEMS AND HABITATS IMPACTED BY DROUGHT.THIS AGREEMENT SUPPORTS PLANNING, DESIGN, PERMITTING, AND IMPLEMENTATION ACTIVITIES FOR SIX WATERSHED-SCALE RESTORATION PROJECTS, RED CREEK, COCHETOPA CREEK (TRUE WEST RANCH), CEBOLLA CREEK (OCATE), FISHER GULCH, YELLOW PINE RIDGE, AND HEADWATERS WILLOW CREEK, FOCUSED ON DROUGHT RESILIENCY, HABITAT RESTORATION, AND CHANNEL WET MEADOW ENHANCEMENT. ACTIVITIES INCLUDE ENVIRONMENTAL COMPLIANCE, DETAILED DESIGN, CONSTRUCTION OF PROCESS-BASED OR FORM-BASED TREATMENTS, AND POST-IMPLEMENTATION MONITORING. TASK 1: RED CREEK PROJECT PLANNING, DESIGN, LTPBR CONSTRUCTION, AND MONITORINGTHE RED CREEK PROJECT FOCUSES ON DROUGHT RESILIENCY, FLOODPLAIN CONNECTIVITY, AQUATIC AND RIPARIAN HABITAT RESTORATION, AND COMMUNITY. THE PROJECT WILL USE LOW TECH PROCESS-BASED RESTORATION (LTPBR) METHODS TO SUPPORT BEAVER HABITAT EXPANSION AND ASSOCIATED HYDROLOGIC BENEFITS ALONG 2.1 MILES OF RED CREEK. APPROXIMATELY 200 LTPBR STRUCTURES WILL BE CONSTRUCTED. TASK 2: COCHETOPA CREEK PROJECT HABITAT RESTORATION AND DROUGHT RESILIENCYTHIS PROJECT ADDRESSES AQUATIC HABITAT DEGRADATION DURING LOW FLOW PERIODS ALONG 1.2 MILES OF COCHETOPA CREEK. DESIGN, PERMITTING, AND CONSTRUCTION WILL FOCUS ON ADDING FORM BASED STRUCTURES (WOOD TOES, ROOT WADS, ENGINEERED ROCK RIFFLES, CROSS VANES) TO CREATE DEEP REFUGE POOLS AND IMPROVE DROUGHT RESILIENCY.TASK 3: CEBOLLA CREEK PROJECT STREAMBANK RESTORATION AND HABITAT IMPROVEMENTTHE CEBOLLA CREEK PROJECT WILL RESTORE 1,800 FEET OF DEGRADED STREAMBANK THROUGH FORM BASED TECHNIQUES, REDUCING EROSION, RESTORING RIPARIAN VEGETATION, AND ENHANCING DROUGHT RESILIENCE.TASK 4: FISHER GULCH PROJECT WET MEADOW RESTORATION AND DROUGHT RESILIENCYTHE FISHER GULCH PROJECT REPLACES THE ORIGINALLY PROPOSED LICK PARK SITE (NOW FULLY FUNDED THROUGH THE RESTORE COLORADO GRANT PROGRAM). ON USFS LAND, THE FISHER GULCH PROJECT WILL PRESERVE AND RESTORE APPROXIMATELY 2 MILES OF RIPARIAN AND WET MEADOW HABITAT USING LOW-TECH ZEEDYK-STYLE ROCK STRUCTURES TO RESTORE SHEET FLOW, REDUCE STREAM GRADE, AND STABILIZE HEADCUTS.TASK 5: YELLOW PINE RIDGE PROJECT WET MEADOW RESTORATION AND DROUGHT RESILIENCYA NEW CROSS-BOUNDARY BLM USFS WET MEADOW SITE ADDED IN THE REVISED BUNDLE. THE PROJECT WILL RESTORE APPROXIMATELY 1 MILE OF RIPARIAN AND WET MEADOW HABITAT USING LOW-TECH ZEEDYK-STYLE ROCK STRUCTURES, INCLUDING JUNIPER REMOVAL AT SPRING HEADS AND WITHIN WET MEADOW AREAS.TASK 6: HEADWATERS WILLOW CREEK PROJECT WET MEADOW RESTORATION AND DROUGHT RESILIENCYA NEW BLM-MANAGED WET MEADOW SITE ADDED IN THE REVISED BUNDLE. THE PROJECT WILL PRESERVE AND RESTORE RIPARIAN AND WET MEADOW HABITAT IN THE HEADWATERS OF WILLOW CREEK, A TRIBUTARY FLOWING INTO BLUE MESA RESERVOIR, USING LOW-TECH ZEEDYK-STYLE ROCK AND OR WICKER WEIR STRUCTURES, WITH WOODY MATERIAL HARVESTED ON SITE.More from United States Department of the Interior posted in October 2026