COLORADO TROUT UNLIMITED
- Agency
- United States Department of the Interior
- NAICS
- 114119 - Other Marine Fishing
- Period start
- 2026-05-01
- Period end
- 2027-04-30
- Budget
- 70000.0
- Place of performance
- COLORADO, UNITED STATES
Description
PURPOSE. SOUTH BOULDER CREEK (SBC) WATERSHED RESTORATION PHASE III (WSR PH III) IS THE NEXT IN A SERIES OF PROJECTS RECOMMENDED IN THE SBC STREAM MANAGEMENT PLAN (SMP) (SEPTEMBER 2022) TO FURTHER THE GOALS OF CREATING FISH PASSAGE AND HELPING TO OPERATIONALIZE AN ENVIRONMENTAL POOL (EP) FOR SUPPORTING MINIMUM FLOWS. THE EP IS BEING BUILT AS PART OF THE GROSS RESERVOIR EXPANSION PROJECT.WSR PH III WILL BE MADE UP OF 4 SUBPROJECTS. IIIA COMPLETE PERMITTING FOR 2 STRUCTURES. IIIB1 COMPLETE 60% ENGINEERING DESIGNS FOR 3 STRUCTURES. IIIB2 COMPLETE 90% ENGINEERING DESIGNS FOR THE SAME 3 STRUCTURES. AND IIIC COMPLETE PERMITTING FOR THESE SAME 3 STRUCTURES. THIS APPLICATION FOR FISH PASSAGE GRANT FUNDING IS FOR WSR PH IIIB1 COMPLETE 60% ENGINEERING DESIGN FOR 3 STRUCTURES.ACTIVITIES TO BE PERFORMED.TASK 1. EXECUTE STRUCTURE SPECIFIC OUTREACH AND COMMUNICATIONS PLANTASK 2. DEVELOP 60% ENGINEERING DESIGNS FOR MODIFICATION OF 3 STRUCTURESTASK 3. PROGRAM MANAGEMENT AND ADMINISTRATIONEXPECTED DELIVERABLES OR OUTCOMES. MAPS. SURVEYS. PHOTOS AND 60% ENGINEERING DESIGNS. TO INCLUDE DRAFT LEVEL DESIGN REPORT. PRELIMINARY PLAN SET. PRELIMINARY REVEGETATION AND GRADING PLANS. PRELIMINARY SPECIFICATIONS AND COST ESTIMATE (OPCC). AND CLIENT AND STAKEHOLDER REVIEW AND COMMENTS. PRELIMINARY ASSESSMENTS WILL INCLUDE HYDRAULIC. STRUCTURAL. GEOTECH. GEOMORPHOLOGY AND ECOLOGY.INTENDED BENEFICIARIES. THE EFFORTS REQUIRED TO MODIFY DIVERSION STRUCTURES TO PASS AND MANAGE THE EP MINIMUM FLOW REQUIREMENTS PRESENTS OPPORTUNITIES TO RECONNECT UP TO 8 MILES OF THIS 10 MILE STRETCH (AQUATIC SPECIES AND FISH PASSAGE). IMPROVE INSTREAM AND BANKSIDE HABITAT. IMPROVE FLOOD RESILIENCE. AND UPDATE AND IMPROVE DITCH OPERATIONS THROUGH STRUCTURE IMPROVEMENTS AND AUTOMATION. THE PROPOSED MODIFICATION DESIGNS FOR 3 PRIORITY STRUCTURES ONCE CONSTRUCTED AND IMPLEMENTED WOULD 1) RECONNECT 5 MILES OF THIS 10 MILE REACH OF SBC TO FISH AND AQUATIC SPECIES PASSAGE 2) BENEFIT PRIORITY NATIVE SPECIES (PLAINS TOPMINNOW AND ORANGE SPOTTED SUNFISH. PREBLES MEADOW JUMPING MOUSE. TRICOLORED BAT AND UTE LADY TRESSES ORCHID) WITHIN THEIR HISTORIC RANGE AS WELL AS OTHER NATIVE SPECIES AND NONNATIVE SPORT FISH AND 3) FURTHER YEAR ROUND MINIMUM STREAM FLOW OBJECTIVES. AND IMPROVED STREAM HABITAT. WATER MANAGEMENT INFRASTRUCTURE EFFICIENCY. AND OVERALL STREAM FUNCTION AND RESILIENCY.ALL EFFORTS HAVE BEEN AND WILL CONTINUE TO BE IN PARTNERSHIP WITH LOCAL STAKEHOLDERS INCLUDING.CITY OF BOULDER. CITY OF LAFAYETTE. DENVER WATER. CITY OF LOUISVILLE. BOULDER COUNTY. AND THE THREE DITCH COMPANIES.SCIENTIFIC AND ENGINEERING ADVISORY STAKEHOLDERS INCLUDE VARIOUS MUNICIPAL (DESCRIBED ABOVE). STATE OF COLORADO (CWCB. CPW. CDWR) AND US FISH AND WILDLIFE SERVICE PERSONNEL PARTICIPATING IN DESIGN AND ASSESSMENT REVIEWS. AND PROVIDING PROFESSIONAL STAFF SUPPORT. FUNDING. ACCESS TO DATA AND SUBJECT MATTER EXPERTISE. A SUBSET OF THE STAKEHOLDERS ALSO MAKEUP THE PROJECT STEERING COMMITTEE.More from United States Department of the Interior posted in October 2026