ClickCease CALIFORNIA DEPARTMENT OF FISH & WILDLIFE – $536K, FY2026 | Award - MatchAwards

CALIFORNIA DEPARTMENT OF FISH & WILDLIFE

Agency
United States Department of the Interior
NAICS
114119 - Other Marine Fishing
Period start
2026-07-01
Period end
2030-06-30
Budget
536121.0
Place of performance
CALIFORNIA, UNITED STATES

Description

THE WOODSON BOAT RAMP PRESERVATION AND ACCESS PLANNING PROJECT WILL PREPARE THE ENGINEERING, ENVIRONMENTAL, AND PERMITTING DOCUMENTS NEEDED TO DEVELOP A SHOVEL-READY DESIGN FOR LONG-TERM PRESERVATION OF THE PUBLIC BOAT RAMP AND RIVER EMBANKMENT AT THE SACRAMENTO RIVER NEAR WOODSON BRIDGE IN TEHAMA COUNTY, CALIFORNIA. THE SITE IS IN A LOW-INCOME AREA WHERE SAFE, EQUITABLE RIVER ACCESS SUPPORTS RECREATION AND EMERGENCY USE. THERE IS NO FEE TO ACCESS THE FACILITY.THE RAMP WAS ORIGINALLY DESIGNED AND CONSTRUCTED IN 2000 THROUGH THE SPORT FISH RESTORATION BOATING ACCESSPROGRAM, REPLACING AN EARTHEN LAUNCH WITH A CONCRETE RAMP TO IMPROVE SAFETY AND ACCESS. SINCE THEN, INCREASEDHIGH-FLOW EVENTS, SEDIMENT DEPOSITION, AND LATERAL CHANNEL MIGRATION HAVE ALTERED THIS REACH OF THE SACRAMENTORIVER, UNDERMINING PORTIONS OF THE RAMP AND EMBANKMENT AND THREATENING THE FACILITYS LONG-TERM VIABILITY.THIS APPLICATION REQUESTS FUNDING FOR A PLANNING AND ALTERNATIVES ANALYSIS PHASE THROUGH 65 PERCENT DESIGN TOEVALUATE STABILIZATION AND ACCESS-PRESERVATION OPTIONS UNDER CURRENT RIVER CONDITIONS. THE WORK WILL INCLUDECONCEPTUAL, 30 PERCENT, AND 65 PERCENT ENGINEERING PLANS AND ENVIRONMENTAL DOCUMENTATION TO POSITION THE PROJECTFOR FUTURE IMPLEMENTATION FUNDING. WORK TASKS INCLUDE HYDRAULIC AND GEOTECHNICAL SURVEYS, MODELING OF FLOW ANDSEDIMENT DYNAMICS, AND EVALUATION OF BANK-PROTECTION AND RAMP HARDENING ALTERNATIVES. THE ANALYSIS WILL ALSOASSESS THE FEASIBILITY OF SITE REALIGNMENT OR RELOCATION, IF WARRANTED BY RIVER CONDITIONS, TO ENSURE ALLPRACTICABLE OPTIONS FOR PRESERVING PUBLIC ACCESS ARE CONSIDERED. RESULTS WILL GUIDE DESIGN DEVELOPMENT, COSTESTIMATES, AND ENVIRONMENTAL DOCUMENTATION CONSISTENT WITH CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA), NATIONALENVIRONMENTAL POLICY ACT (NEPA), AND PERMITTING REQUIREMENTS.THIS PLANNING EFFORT FULFILLS THE SPORT FISH RESTORATION ACTS PURPOSE BY SUSTAINING EQUITABLE PUBLIC ACCESS ANDMAINTAINING THE FACILITYS RECREATIONAL AND EMERGENCY FUNCTIONS. THE PROJECT WILL ESTABLISH A RESILIENT,ENVIRONMENTALLY SOUND DESIGN THAT PROTECTS THE SITE FROM FLOOD DAMAGE AND ENSURES CONTINUED USE. PEER-REVIEWEDSTUDIES GOLET ET AL. (2025) AND LARSEN GRECO (2002) IDENTIFY THIS SEGMENT OF THE SACRAMENTO RIVER AS ONE OFITS MOST GEOMORPHICALLY ACTIVE REACHES, WHERE ONGOING BANK EROSION CONTINUALLY RESHAPES THE FLOODPLAIN ANDTHREATENS ADJACENT INFRASTRUCTURE. ADVANCING THIS PROJECT TO A CONSTRUCTION-READY STAGE, WHILE MAINTAININGINTERIM FUNCTIONALITY, WILL PROTECT A VITAL PUBLIC ACCESS POINT, SUSTAIN EMERGENCY-RESPONSE CAPABILITY, ANDPRESERVE COMMUNITY RECREATION INFRASTRUCTURE ALONG THE SACRAMENTO RIVER.MAINTENANCE FUNDING WILL OCCUR AS MATCH TO PERFORM TEMPORARY RAMP AND ACCESS-ROAD REPAIRS, DEBRIS AND SEDIMENTREMOVAL, AND MINOR BANK STABILIZATION UNDER THE COUNTYS ANNUAL BOAT-RAMP PERMIT. THESE ACTIONS WILL MAINTAINSAFE PUBLIC AND EMERGENCY ACCESS DURING PROJECT DEVELOPMENT AND PREVENT FURTHER DETERIORATION.THE PROJECT WILL BE DELIVERED THROUGH A PARTNERSHIP BETWEEN TEHAMA COUNTY PUBLIC WORKS ENGINEERING DIVISION,THE TEHAMA COUNTY TRANSPORTATION COMMISSION (TCTC),AND THE RESOURCE CONSERVATION DISTRICT OF TEHAMA COUNTY (RCDTC), WITH COORDINATION FROM DEPARTMENT OF WATERRESOURCES (DWR), STATE PARKS, AND THE U.S. ARMY CORPS OF ENGINEERS (USACE).

Source notice

More from United States Department of the Interior posted in October 2026