ClickCease LA POSTA BAND OF MISSION INDIANS, THE – $382K, FY2026 | Award - MatchAwards

LA POSTA BAND OF MISSION INDIANS, THE

Agency
United States Department of the Interior
NAICS
924120 - Administration of Conservation Programs
Period start
2026-09-14
Period end
2028-09-30
Budget
381644.0
Place of performance
BOULEVARD, CALIFORNIA, UNITED STATES

Description

THE LA POSTA BAND OF MISSION INDIANS (RECIPIENT) HAS, IN CONSULTATION WITH THE U.S. BUREAU OFRECLAMATION (RECLAMATION), DEVELOPED INITIAL DESIGN PLANS TO ADDRESS SEDIMENT AND EROSION IMPACTING TRIBALSURFACE WATERS INCLUDING RIPARIAN, WETLAND, AND STREAM RESTORATION. THE RECIPIENT IS ACTIVELY WORKINGON EFFORTS TO RESTORE ENVIRONMENTAL, CULTURAL, AND RECREATIONAL RESOURCES DAMAGED BY STORMWATERRUNOFF FROM THE INTERSTATE-8 HIGHWAY SYSTEM. PROPOSED ACTIVITIES HAVE BEEN PRIORITIZED TO ADDRESSSEDIMENT MOBILIZATION AND EROSION THROUGH SOURCE CONTROL ACTIONS FOLLOWED BY RECONSTRUCTION ANDHARDENING OF THE EMERGENCY ACCESS ROAD. FINALLY, THE RECIPIENT PROPOSES TO ADDRESS RESTORATION OF THEIMPACTED WETLANDS AND RIPARIAN AREA, POND, AND STREAMBED. THE GOAL OF THE OVERALL LARGER PROJECTIS TO RESTORE THE RIPARIAN AND WETLAND AREA FOR WILDLIFE, CULTURAL, AND RECREATIONAL USE AND HARDEN THEEMERGENCY ACCESS ROAD. THE OBJECTIVES OF THIS PROGRAM IN SUPPORTING THIS OVERALL PROGRAM GOAL AREDESCRIBED BELOW.THIS PHASE OF THE PROGRAM INCLUDES PLANNING AND DESIGN TO ADDRESS HABITAT AND SURFACE WATERRESTORATION. TO ACCOMPLISH THESE GOALS, THE FOLLOWING TASKS ARE REQUIRED:2.1.1 TASK 1. PROJECT MANAGEMENTPROJECT MANAGEMENT WILL REQUIRE THE ENVIRONMENTAL DIRECTOR TO ATTEND MEETINGS AND CONDUCTOUTREACH TO APPROPRIATE AGENCIES DURING THE FINAL DESIGN AND INITIAL CONSTRUCTION PROCESS. TO ASSISTIN PROJECT MANAGEMENT AND REGULATORY COMPLIANCE CAPACITY, THE TRIBE WILL CONTRACT ENVIRONMENTALTECHNICAL CONSULTANTS, ENVIRONMENTAL ENGINEERS AND PROFESSIONAL HYDROLOGISTS.2.1.2 TASK 2. ENVIRONMENTAL PLANNINGENVIRONMENTAL PLANNING FOR RESTORATION ACTIVITIES WILL INCLUDE HABITAT RESTORATION ASSESSMENT THETRIBAL TECHNICAL CONSULTANT WILL ASSIST IN PREPARING THE PLANNING DOCUMENT AND WILL WORK CLOSELYWITH RECLAMATION AND OTHER APPROPRIATE AGENCY STAFF TO ENSURE ALL APPROPRIATE ENVIRONMENTAL PLANNING ANDPERMITTING DOCUMENTS ARE IDENTIFIED AND PREPARED PRIOR TO CONSTRUCTION ACTIVITIES. IT IS IMPORTANT TONOTE THAT RESTORATION ACTIVITIES MAY BE TIMELINE LIMITED DUE TO WILDLIFE PROTECTION MITIGATION TO BEDETERMINED IN CONSULTATION WITH THE U.S. FISH AND WILDLIFE SERVICES.2.1.3 TASK 3. RESTORATION DESIGN AND IMPLEMENTATIONUPON COMPLETION OF THE ENVIRONMENTAL PLANNING DOCUMENT FOR RESTORATION ACTIVITIES, ENGINEEREDDESIGNS WILL BE IDENTIFIED AND A PROFESSIONAL ENGINEER OR HYDROLOGIST MAY BE REQUIRED TO COMPLETEDESIGN PLANS FOR IDENTIFIED RESTORATION ACTIVITIES. UPON COMPLETION OF DESIGN AND IF PERMITS AREAPPROVED BY REGULATORY AUTHORITIES, RESTORATION CONSTRUCTION MAY BE REASONABLE HOWEVER, APPROVAL WILL BE NEEDED FROM RECLAMATION TO INITIATE THESE ACTIVITIES, AS THEY HAVE YET TO BE IDENTIFIED.

Source notice

More from United States Department of the Interior posted in October 2026