POTTER COUNTY CONSERVATION DISTRICT
- Agency
- United States Department of the Interior
- NAICS
- 924120 - Administration of Conservation Programs
- Period start
- 2026-08-03
- Period end
- 2028-09-30
- Budget
- 60000.0
- Place of performance
- PENNSYLVANIA, UNITED STATES
Description
THE GOAL OF THIS PROJECT IS TO ACHIEVE AQUATIC CONNECTIVITY AND HABITAT INTEGRITY IN THE UPPER GENESEE WATERSHED. THIS PROJECT WILL TAKE PLACE ON THE WEST BRANCH GENESEE RIVER, WHICH IS A CLASS A NATURAL REPRODUCTION TROUT STREAM LOCATED NEAR THE HEADWATERS OF THE GENESEE WATERSHED IN POTTER COUNTY, PENNSYLVANIA. IN REMOVING TWO EXISTING AQUATIC ORGANISM PASSAGE BARRIERS, 1.8 MILES OF CLASS A TROUT STREAM HABITAT WILL BE MADE AVAILABLE TO THE EXISTING EASTERN BROOK TROUT AND BROWN TROUT POPULATIONS. IN ADDITION TO ALLOWING FOR PROPER AQUATIC ORGANISM PASSAGE, THIS PROJECT WILL BE DESIGNED FOR IMPROVED FLOOD RESILIENCY, WHICH IN TURN WILL REDUCE SEDIMENTATION TO THE STREAM DURING HIGH WATER EVENTS.THIS PROJECT IS LOCATED IN RURAL PENNSYLVANIA, WHERE DETOUR ROUTES OFTEN ADD SIGNIFICANT TIME AND MILEAGE, AS WELL AS GO THROUGH LARGELY UNMAINTAINED AREAS OF ROADWAY, WHICH CAN CAUSE A MULTITUDE OF PROBLEMS IN EVENT OF AN EMERGENCY. FOR THIS PROJECT, SPECIFICALLY THE PRIVATE ROADWAY CROSSING, IN THE EVENT THAT THE EXISTING STREAM CROSSING WERE TO BE MADE UNACCESSIBLE, THERE IS NO ALTERNATE ROUTE TO THE RESIDENCE, AND THE RESIDENCE IS 0.25 MILES FROM WHERE THE STREAM CROSSES THE DRIVEWAY. IN ADDITION TO THE PRIVATE CROSSING, THE POTTER COUNTY CONSERVATION DISTRICT IS CURRENTLY IN THE PROCESS OF REPLACING A PUBLIC OWNED CULVERT, WHICH HAS SIGNIFICANT IMPACT ON DETOUR LENGTH IN CASE OF EMERGENCY. CURRENTLY, FROM THE STATE ROUTE TO THE EXISTING CROSSING, IT IS 2.4 MILES. IF THE CROSSING WERE TO BE DAMAGED AND A DETOUR WOULD NEED TO BE MADE, THE MILEAGE TO THAT EXACT SAME LOCATION IS 6.7 MILES, WHICH ENTIRELY CONSISTS OF UNPAVED, LOW VOLUME ROADS.IN ORDER TO COMPLETE THE EXPECTED GOAL OF OPENING 1.8 MILES OF NATURAL REPRODUCTION TROUT HABITAT, THE POTTER COUNTY CONSERVATION DISTRICT WILL ASSIST WITH THE DESIGN AND INSTALLATION OF A STRUCTURE THAT IS AT MINIMUM 17 FEET IN WIDTH, WHICH IS 125% THE BANKFULL WIDTH OF THE STREAM, AND ALLOWS FOR PASSAGE OF THE 100-YEAR FLOOD EVENT, AS WELL AS ALLOWS FOR FULL AQUATIC ORGANISM PASSAGE BY COMPLETING STREAM RESTORATION IN THE FORM OF GRADE CONTROL AND POOL FEATURES.More from United States Department of the Interior posted in October 2026