ClickCease ECOSYSTEMS CONNECTIONS INSTITUTE, LLC – $270K, FY2026 | Award - MatchAwards

ECOSYSTEMS CONNECTIONS INSTITUTE, LLC

Agency
United States Department of the Interior
NAICS
114119 - Other Marine Fishing
Period start
2026-02-01
Period end
2029-12-31
Budget
270145.0
Place of performance
INDIANA, UNITED STATES

Description

THE MUSCATATUCK RIVER BASIN IS 1137 SQUARE MILES IN SOUTHEAST INDIANA AND A MAJOR TRIBUTARY OF THE EAST FORK WHITE RIVER. BOTH THE VERNON FORK MUSCATATUCK RIVER AND EAST FORK MUSCATATUCK RIVER FLOW SOUTHWESTERLY WHERE THEY JOIN JUST WEST OF AUSTIN INDIANA AND FORM THE MUSCATATUCK RIVER. THE MUSCATATUCK RIVER FLOWS 24 MILES TO THE CONFLUENCE WITH THE EAST FORK WHITE RIVER AT RIVER MILE RM 179. THE MUSCATATUCK COLONY LOW HEAD DAM IS LOCATED AT RM 51 IN THE VERNON FORK OF THE MUSCATATUCK IN JENNINGS COUNTY INDIANA AND NEAR THE MUSCATATUCK URBAN TRAINING CENTER. THE DAM IS 250 FEET LONG 15 FEET TALL 40 WIDE AT THE BASE AND 03 FEET WIDE AT THE TOP. THE DAM WAS CONSTRUCTED IN 1938 TO CREATE A POOL FOR A WATER SUPPLY FOR WHAT WAS REFERRED TO AS THE INDIANA FARM 20 COLONY FOR THE FEEBLE MINDED (THE COLONY).IN 1971 THE NAME WAS CHANGED TO THE MUSCATATUCK STATE HOSPITAL AND TRAINING CENTER. IN 2005 THE FACILITY CLOSED AND BECAME THE MUSCATATUCK URBAN TRAINING CENTER (MUTC) FOR THE DEPARTMENT OF DEFENSE. THE MUTC AND THE LOW HEAD DAM IS PART OF THE SOUTHERN INDIANA SENTINEL LANDSCAPE PARTNERSHIP. THE FOCUS OF THIS PARTNERSHIP WITH DOD USDA AND DOI IS TO STRENGTHEN MILITARY READINESS CONSERVE NATURAL RESOURCES BOLSTER AGRICULTURAL AND FORESTRY ECONOMIES INCREASE PUBLIC ACCESS TO OUTDOOR RECREATION AND ENHANCE RESILIENCE TO CLIMATE CHANGE. REMOVAL OF THIS DAM IS CONSISTENT WITH THESE STRATEGIC PLANNING GOALS. IN 2023 2024 ECOSYSTEMS CONNECTIONS INSTITUTE COMPLETED A FEASIBILITY STUDY OF THE DAM AND THE PORTION OF THE RIVER UPSTREAM (POOL) AND DOWNSTREAM OF THE DAM. THIS FEASIBILITY STUDY WAS FUNDED BY THE MUSCATATUCK URBAN TRAINING CENTER AND THE SAM SHINE FOUNDATION AND INCLUDED PHYSICAL (HYDRAULIC MODELING) SEDIMENT CHEMISTRY AND BIOLOGICAL HABITAT ATTRIBUTES OF THE STREAM THAT COULD BE USED TO SECURE PERMITS TO REMOVE THE DAM. THERE HAVE BEEN 72 FISH SPECIES AND 32 MUSSEL SPECIES DOCUMENTED IN THE VERNON FORK MUSCATATUCK RIVER INCLUDING SALAMANDER MUSSEL (SIMPSONAIAS AMBIGUA) FOUND IN THE UPPER PART OF THE WATERSHED. THE GOAL OF THIS INITIATIVE IS TO RESTORE FULL FLUVIAL PROCESS AND BIOLOGICAL CONNECTIVITY FOR THE ENTIRE MUSCATATUCK RIVER. REMOVAL OF THIS DAM WILL RECONNECT 164 STREAM MILES AND IS THE FIRST AND CRITICALLY IMPORTANT STEP TO ACCOMPLISH THIS GOAL.

Source notice

More from United States Department of the Interior posted in October 2026