ClickCease RIVANNA WATER & SEWER AUTHORITY – $100K, FY2026 | Award - MatchAwards

RIVANNA WATER & SEWER AUTHORITY

Agency
United States Department of the Interior
NAICS
114119 - Other Marine Fishing
Period start
2026-01-01
Period end
2027-02-01
Budget
100000.0
Place of performance
VIRGINIA, UNITED STATES

Description

THE PURPOSE OF THIS PROJECT IS TO DEVELOP DESIGN PLANS AND SPECIFICATIONS FOR THE REMOVAL OF THE EXISTING LOW-HEAD DAM ON THE NORTH FORK RIVANNA RIVER, LOCATED AT THE RIVANNA WATER AND SEWER AUTHORITY S (RWSA S) NORTH RIVANNA WATER TREATMENT PLANT. THE TREATMENT PLANT IS SCHEDULED FOR DECOMMISSIONING WITHIN 5 YEARS, BUT REMOVAL OF THE DAM IS NOT PART OF THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY S WITHDRAWAL PERMITTING REQUIREMENTS. THE VOLUNTARY REMOVAL OF THE DAM WILL RESULT IN RESTORING NATURAL SEDIMENT TRANSPORT FUNCTIONS AND INSTREAM HABITAT TO SUPPORT DIADROMOUS FISH, LISTED FRESHWATER MUSSELS, AND OTHER AQUATIC SPECIES WITHIN THE WATERSHED, PROVIDE AQUATIC ORGANISM PASSAGE, ALLEVIATE PUBLIC SAFETY CONCERNS AND FLOODING POTENTIAL WITHIN THE COMMUNITY, AND OPEN RECREATIONAL OPPORTUNITIES. RWSA INITIALLY PLANNED TO DISCONTINUE SERVICE OF THE WATER TREATMENT PLANT IN 2026 HOWEVER, THE RECENT ANNOUNCEMENT OF A LARGE NEW PHARMACEUTICAL MANUFACTURING FACILITY IN THIS THIS SERVICE AREA REQUIRES THAT THE NORTH RIVANNA WATER TREATMENT PLANT REMAIN IN SERVICE FOR AN ADDITIONAL 3-5 YEARS. RWSA IS COMMITTED TO THE MISSION OF THE NATIONAL FISH PASSAGE PROGRAM AND WILL BE PROCEEDING WITH DESIGN OF THE DAM REMOVAL AND STREAM RESTORATION SO THAT DEMOLITION WORK MAY OCCUR AS SOON AS WATER SYSTEM CONDITIONS ALLOW. RWSA INTENDS TO COLLABORATE WITH THEIR CONSULTANT, SHORT ELLIOT HENDRICKSON (SEH) AND THE VIRGINIA FISH AND WILDLIFE OFFICE FOR THE PROPOSED PROJECT DESIGN. THE PROJECT SCOPE OF WORK FOR WHICH THE RWSA SEEKS FUNDING ASSISTANCE INCLUDES THE FOLLOWING- TOPOGRAPHIC AND BATHYMETRIC SURVEY- WATERSHED HYDROLOGY- HYDROLOGIC HYDRAULIC EVALUATION- STREAM GEOMORPHOLOGY SEDIMENT ANALYSIS (INCLUDING SEDIMENT VOLUME ABOVE DAM)- ANALYSIS OF ALTERNATIVES FOR DAM REMOVAL AND STREAM RESTORATION- DEVELOPMENT OF PRELIMINARY AND FINAL DESIGN DRAWINGS AND SPECIFICATIONS- ENGINEERS ESTIMATE AND IMPLEMENTATION SCHEDULERWSA WILL PROVIDE IN-KIND CONTRIBUTION TO THE PROJECT BY FUNDING SERVICES BY SEH THAT SUPPORT THIS DESIGN WORK, INCLUDING PROJECT MANAGEMENT, COORDINATION, AND PROJECT MEETINGS, AND PERMITTING SUPPORT. THE RESULT OF ALL DESIGN WORK WILL INCLUDE A COMPREHENSIVE REPORT OF ALL SURVEY WORK, FINAL ENGINEERING DRAWINGS AND TECHNICAL SPECIFICATIONS, AND PERMIT APPLICATIONS AND CORRESPONDENCE WITH REGULATORY AGENCIES. THIS DESIGN IS SCHEDULED TO TAKE APPROXIMATELY 13 MONTHS TO COMPLETE. RWSA INTENDS TO COLLABORATE WITH LOCAL STAKEHOLDERS SUCH AS THE RIVANNA CONSERVATION ALLIANCE (RCA), ALBEMARLE COUNTY PARKS AND RECREATION, AND THE UNIVERSITY OF VIRGINIA FOUNDATION TO DETERMINE PUBLIC ACCESS SPECIFICATIONS AFTER THE DAM IS REMOVED.

Source notice

More from United States Department of the Interior posted in October 2026