ClickCease SOUTHERN UTE INDIAN TRIBE – $16.8M, FY2026 | Award - MatchAwards

SOUTHERN UTE INDIAN TRIBE

Agency
United States Department of the Interior
NAICS
924120 - Administration of Conservation Programs
Period start
2026-08-24
Period end
2031-09-30
Budget
16750000.0
Place of performance
COLORADO, UNITED STATES

Description

UPPER COLORADO BASIN REGION BUCKET 2 ECOSYSTEM (B2E) FINANCIAL ASSISTANCE PROGRAM PROVIDES FUNDING FOR PROJECTS THAT PROVIDE ENVIRONMENTAL BENEFITS AND RESTORATION OF ECOSYSTEMS AND HABITATS IMPACTED BY DROUGHT.THE PROJECT INTEGRATES CRITICAL INFRASTRUCTURE MODERNIZATION WITH ECOSYSTEM RESTORATION TO IMPROVE LONG TERM WATERSHED RESILIENCE IN THE PINE RIVER BASIN. THE PROJECT INCLUDES REHABILITATION OF THE AGING 1957 PINE RIVER CANAL DIVERSION STRUCTURE, INSTALLATION OF FISH SCREENS TO ELIMINATE ENTRAINMENT, CONSTRUCTION OF UPSTREAM AND DOWNSTREAM FISH PASSAGE TO RESTORE RIVER CONNECTIVITY, AND CREATION OF A MEASURABLE ENGINEERED BYPASS ENSURING RELIABLE WATER DELIVERY TO THE NANNICE DIVERSION. COMPLEMENTING THESE IMPROVEMENTS, THE PROJECT REPLACES THE DETERIORATING 100 FOOT BEAVER CREEK SIPHON THAT CONVEYS 280 CUBIC FEET PER SECOND (CFS) OF IRRIGATION WATER AND RESTORES 3,000 LINEAR FEET OF BEAVER CREEK THROUGH BANK STABILIZATION, TOE WOOD STRUCTURES, BANK-FULL BENCHES, AND NATIVE RIPARIAN PLANTINGS. TOGETHER, THESE ACTIONS ADDRESS LONGSTANDING DROUGHT RELATED DEGRADATION, ENHANCE AQUATIC AND RIPARIAN HABITAT FOR SENSITIVE AND PROTECTED SPECIES, IMPROVE WATER QUALITY AND OPERATIONAL RELIABILITY, AND SUPPORT A HEALTHIER, MORE RESILIENT RIVER SYSTEM.

Source notice

More from United States Department of the Interior posted in October 2026