ClickCease FORT SILL APACHE TRIBE – $267K, FY2026 | Award - MatchAwards

FORT SILL APACHE TRIBE

Agency
United States Department of the Interior
NAICS
221115 - Wind Electric Power Generation
Period start
2026-08-24
Period end
2028-08-23
Budget
267492.0
Place of performance
APACHE, OKLAHOMA, UNITED STATES

Description

THE FORT SILL CHIRICAHUA WARM SPRINGS APACHE TRIBE HOLDS A UNIQUE GEOGRAPHIC AND ECONOMIC POSITION WITHIN LUNA COUNTY, NM FEATURING VAST, RURAL, AND MINIMALLY DEVELOPED HOMELANDS. AS THE TRIBE DEVELOPS THESE AREAS, THEY CURRENTLY LACK ADEQUATE ACCESS TO ESSENTIAL UTILITIES, RANGING FROM WATER AND SANITARY SYSTEMS TO HIGH-SPEED BROADBAND. PAST FEASIBILITY STUDIES SHOW OUR LANDS ARE HIGHLY FAVORABLE FOR DIVERSE ENERGY GENERATION, RANGING FROM RENEWABLE SOLAR AND GEOTHERMAL RESOURCES TO ADVANCED BASELOAD TECHNOLOGIES. TO ACHIEVE OUR VISION OF MANAGING AND PRODUCING ENERGY ALONGSIDE OTHER ESSENTIAL UTILITIES, A FOUNDATIONAL REGULATORY FRAMEWORK MUST BE ESTABLISHED FIRST. THE TRIBE CURRENTLY LACKS THE INTERNAL LEGAL, REGULATORY, AND CORPORATE STRUCTURES NECESSARY TO MANAGE AND OVERSEE INFRASTRUCTURE INDEPENDENTLY. THIS STRUCTURAL GAP LEAVES THE TRIBE DEPENDENT ON EXTERNAL PROVIDERS AND HINDERS OUR PATH TO SELF-DETERMINATION. THIS STRUCTURAL GAP IS MAGNIFIED BY THE TRIBES UNIQUE MULTI-STATE LAND PORTFOLIO. AS A RESULT OF ITS HISTORICAL CIRCUMSTANCES, THE FORT SILL CHIRICAHUA WARM SPRINGS APACHE TRIBE HOLDS BOTH TRUST AND FEE-SIMPLE LANDS ACROSS OKLAHOMA, NEW MEXICO, AND ARIZONA. DEVELOPING THE FOUNDATIONAL TRIBAL UTILITY ORDINANCE, TUA OPERATIONAL STRUCTURES, AND TEDO CORPORATE FRAMEWORKS THEREFORE REQUIRES ANALYSIS OF FEE LAND REGULATORY CRITERIA APPLICABLE IN ALL THREE STATES. THIS PROJECT BUILDS THE INTERNAL REGULATORY CAPACITY TO GOVERN UTILITIES SAFELY AND SOVEREIGNLY ACROSS THAT FULL FOOTPRINT. THIS PROJECT DIRECTLY BUILDS THE REQUIRED INTERNAL REGULATORY CAPACITY TO SAFELY PROVIDE UTILITY SERVICES TO TRIBAL MEMBERS, BUSINESSES, THE SURROUNDING COMMUNITY, AND POTENTIAL INTERCONNECT WITH THE WESTERN ELECTRICITY COORDINATING COUNCIL (WECC) GRID. THE REQUESTED TEDC FUNDS WILL BE USED EXCLUSIVELY FOR NON-CONSTRUCTION, CAPACITY-BUILDING ACTIVITIES EXECUTED BY LEGAL AND UTILITY CONSULTANTS IN COORDINATION WITH TRIBAL LEADERSHIP: 1. TUA TEDO BUSINESS PLANNING: DEVELOPING OPERATIONAL BLUEPRINTS FOR A UNIFIED, MULTI-SERVICE UTILITY, INTEGRATING BROADBAND WITH GRID INFRASTRUCTURE, AND CREATING CORPORATE CHARTER FRAMEWORKS FOR AN ELIGIBLE TEDO. 2. TRIBAL ENERGY CODES AND POLICIES: DRAFTING AND ENACTING COMPREHENSIVE TRIBAL ENERGY REGULATIONS, UTILITY ORDINANCES, RIGHTS-OF-WAY CODES, AND METERING POLICIES 3. COMPREHENSIVE STRATEGIC PLANNING: DESIGNING REGULATORY ROADMAPS FOR ENERGY DEVELOPMENT, GRID INTERCONNECTION, AND ENERGY-EFFICIENT, GRID-TIED SYSTEMS BY THE CONCLUSION OF THE 12-MONTH GRANT PERIOD, THE TRIBE WILL ACHIEVE FULL REGULATORY READINESS BY PRODUCING FOUR DISTINCT DELIVERABLES: (1) A COMPREHENSIVE TRIBAL UTILITY ORDINANCE FRAMEWORK READY FOR OFFICIAL ADOPTION, (2) A FORMALIZED TUA BUSINESS PLAN AND ORGANIZATIONAL CHART, (3) A CORPORATE BLUEPRINT AND BUSINESS PLAN FOR AN ELIGIBLE TEDO, AND (4) A STRATEGIC ENERGY AND INFRASTRUCTURE EXPLORATION ROADMAP. ULTIMATELY, THIS PROJECT WILL TRANSITION THE TRIBE TO A POSITION OF FULL SOVEREIGNTY, CREATING THE EXACT ADMINISTRATIVE FRAMEWORK NEEDED TO SUCCESSFULLY DEPLOY AND MANAGE OUR FUTURE ENERGY, WATER, AND COMMUNICATION GRIDS

Source notice

More from United States Department of the Interior posted in October 2026