CROW CREEK SIOUX TRIBE
- Agency
- United States Department of the Interior
- NAICS
- 221310 - Water Supply and Irrigation Systems
- Period start
- 2026-08-10
- Period end
- 2027-11-30
- Budget
- 500000.0
- Place of performance
- FORT THOMPSON, SOUTH DAKOTA, UNITED STATES
Description
UNDER THIS AGREEMENT THE CROW CREEK SIOUX TRIBE SHALL REPLACE EXISTING IRRIGATION EQUIPMENT THAT HAS EITHER REACHED THE END OF ITS USEFUL LIFE OR IS APPROACHING THE END OF ITS USEFUL LIFE. THE TRIBE SHALL REPLACE OR RENOVATE EQUIPMENT ISSUES IN THREE MAIN AREAS OF THE CURRENT IRRIGATION SYSTEM (BIG BEND, NORTH SHORE, FORT THOMPSON) TO MAKE THE SYSTEM MORE RESILIENT TO DROUGHT CONDITIONS IN THE FUTURE. THOSE IMPROVEMENTS ARE AS FOLLOWS:1)AREA A - BIG BEND IRRIGATION SYSTEM RENOVATE THE SYSTEM TO INCLUDE A SPRINKLER PACKAGE ANDRENOVATE THE DRIVE SYSTEM OF ONE PIVOT TO ALLOW FOR AUTOMATIC, FULL RANGE OF MOTION OPERATION. 2)AREA B - NORTH SHORE IRRIGATION SYSTEM REPLACE THREE PIVOTS, AND ONE PUMP, MOTOR, AND ELECTRICAL PANEL AT THE BOOSTER STATION WITHIN THE NORTH SHORE IRRIGATION SYSTEM. 3)AREA C - FORT THOMPSON IRRIGATION SYSTEM REPLACE THE POORLY FUNCTIONING INTAKE PUMPS AND ADJACENT PIPING AT THE EXISTING BOOSTER STATION WITHIN THE FORT THOMPSON IRRIGATION SYSTEM.REVIEW THE EXISTING WATER TREATMENT PLANT INTAKE STRUCTURE TO ASSESS POSSIBILITY OF RECONNECTION TO AN ABANDONED WATER TREATMENT INTAKE STRUCTURE. INSPECT THE EXISTING IRRIGATION PIPING USING SMARTBALL, OR A SIMILAR TECHNOLOGY, AND DETERMINE THE CONDITION AND LOCATION OF THE PIPING THROUGHOUT THE SYSTEM.More from United States Department of the Interior posted in October 2026