STATE OF UTAH, DIVISION OF WILDLIFE RESOURCES
- Agency
- United States Department of the Interior
- NAICS
- 114119 - Other Marine Fishing
- Period start
- 2025-07-01
- Period end
- 2026-06-30
- Budget
- 25275.0
- Place of performance
- UTAH, UNITED STATES
Description
ARMORING OF AREAS NEAR THE CHICKEN CREEK EAST RAMP AT STRAWBERRY RESERVOIR TO PREVENT EROSION DURING HIGHER LAKE ELEVATIONS. A NEW PARKING AREA AND BOAT RAMP WERE CONSTRUCTED AT THE CHICKEN CREEK EAST AREA ON STRAWBERRY RESERVOIR BACK IN 2022. NEAR RECORD HIGH WATER LEVELS DURING THE SPRING OF 2024 REVEALED THAT SOME OF THE AREA AROUND THE WATERS EDGE OF THE PARKING LOT WERE NOT ADEQUATELY COVERED WITH RIP RAP AND SOME EROSION OF THE PARKING AREA OCCURRED. WE ALSO HAVE FOUND THAT THE DRAINAGE DITCH ALONG THE UPPER END OF THE PARKING AREA CAN BECOME VERY SATURATED IN THE EARLY SPRING WITH HEAVY SNOW MELT AND THE DITCH NEEDS TO BE LINED WITH COBBLE TO ELIMINATE SLUMPING OF THE CUT BANK. UDWR PERSONNEL WILL OVER SEE PROCUREMENT AND DELIVERY OF THE ROCK MATERIAL TO THE SITE AT CHICKEN CREEK EAST. WE ALSO ANTICIPATE UTILIZING THE UDWR HEAVY EQUIPMENT CREW TO HELP PLACE THE ROCK MATERIAL ON SITE. APPROXIMATELY 50 CUBIC YARDS OF ROAD BASE MATERIAL WILL BE PURCHASED AND USED TO BUILD BACK UP SOME OF THE AREAS WHERE THE RESERVOIR EROSION OCCURRED. WE ARE ALSO PROPOSING TO PURCHASE APPROXIMATELY 160 CUBIC YARDS OF 12 INCH ROCK TO BE PLACED AROUND THE PARKING LOT TO ELIMINATE MORE EROSION FROM TAKING PLACE. WE WILL ALSO PURCHASE APPROXIMATELY 140 CUBIC YARDS OF 4 INCH COBBLE ROCK TO BE PLACED IN THE DRAINAGE DITCH ON THE UPPER END OF THE PARKING LOT TO ELIMINATE SLUMPING AND EROSION ALONG THE CUT FOR THE DITCH. THE PLACEMENT OF THE RIP RAP ALONG THE WATERS EDGE WILL ELIMINATE EROSION OF THE PARKING AREA AND THE COBBLE IN THE DRAINAGE DITCH WILL REDUCE EROSION AND SLUMPING THAT WILL KEEP RUNOFF OUT OF THE PARKING AREA. PLACED ROCK WILL ALSO LIMIT ACCESS TO DESIGNATED AREAS.More from United States Department of the Interior posted in September 2025