PUEBLO DE SAN ILDEFONSO
- Agency
- United States Department of the Interior
- NAICS
- 221310 - Water Supply and Irrigation Systems
- Period start
- 2025-04-22
- Period end
- 2026-12-31
- Budget
- 238442.0
- Place of performance
- NEW MEXICO, UNITED STATES
Description
THE SOLE PURPOSE OF THIS PROJECT IS TO BENEFIT THE PUBLIC. THE PUEBLO DE SAN ILDEFONSO HAS DEVELOPED THE ENGINEERED DESIGN TO REFURBISH THE WATER INTAKE STRUCTURE AND PUMP PLANT TO RESTORE FUNCTION AND DELIVER IRRIGATION WATER FROM THE RIO GRANDE INTO THE PUEBLOS WESTSIDE DITCH. THIS PROJECT WILL PROVIDE TRIBAL MEMBERS OF THE PUEBLO DE SAN ILDEFONSO WITH A RELIABLE WATER SOURCE FOR THE WESTSIDE FARMLANDS. THIS IMPROVED ACCESS TO RELIABLE WATER WILL ALLOW TRIBAL MEMBERS TO CONTINUE UTILIZING THEIR TRADITIONAL FARMLANDS. THIS WILL SUPPORT CULTURAL AND SUBSISTENCE PRACTICES AND ENHANCE THE PUEBLOS DROUGHT RESILIENCY. UNDER THIS AGREEMENT THE RECIPIENT SHALL RETROFIT AN EXISTING WATER INTAKE SYSTEM TO DELIVER WATER FROM THE RIO GRANDE INTO THE PUEBLOS WEST DITCH FOR IRRIGATION PURPOSES. THE PUEBLO CONTRACTED WITH A LOCAL ENGINEERING FIRM TO DESIGN THE RETROFIT OF THE WESTSIDE INTAKE STRUCTURE. THE FINAL DESIGN WAS COMPLETED NOVEMBER 2023 AND INCLUDES DESIGN AND SPECIFICATIONS TO ENABLE CONTRACTING FOR CONSTRUCTION SERVICES. THE DESIGN WILL PROVIDE NEW 16-INCH PIPE WITH SCREENED INTAKE, NEW BURIED TANK, NEW PUMP INSTALLED IN EXISTING PUMP HOUSE, AND NEW PIPING TO THE DISCHARGE POINT INTO THE EXISTING WESTSIDE DITCH. TASK 1, CONTRACT MANAGEMENT THE PUEBLO DE SAN ILDEFONSO SHALL BE RESPONSIBLE FOR THE SUCCESSFUL COMPLETION OF THE PROJECT. THE WORK REQUIRES SUBCONTRACTING THE SERVICES OF A QUALIFIED SERVICE PROVIDER AS SUBCONTRACTOR. THE PUEBLO OR DESIGNEE WILL MANAGE ALL ASPECTS OF THE WORK, INCLUDING COORDINATION FOR ANY REQUIRED ACCESS APPROVALS REQUIRED FOR CONSTRUCTION. THE PUEBLO WILL RETAIN THE SERVICES OF THE DESIGN ENGINEER TO PROVIDE TECHNICAL SUPPORT DURING CONSTRUCTION, ADDRESS ANY REQUESTS FOR INFORMATION, VALIDATE TECHNICAL COMPLETION, AND PROVIDE TECHNICAL GUIDANCE FOR ANY ISSUES RELATED TO DESIGN. THE ENGINEER WILL PROVIDE REDLINE DRAWINGS OR ELECTRONIC DRAWING UPDATES, AS AGREED UPON BETWEEN THE PUEBLO AND DESIGN ENGINEER, IN ORDER TO PROVIDE THE PUEBLO WITH ADEQUATE AS-BUILT DOCUMENTATION OF PROJECT CONSTRUCTION.TASK 2, CONSTRUCTION THE REHABILITATION OF THE INTAKE STRUCTURE SHALL BE COMPLETED BY A LICENSED AND QUALIFIED CONTRACTOR IN ACCORDANCE WITH THE DESIGN DRAWINGS AND SPECIFICATIONS. ANY DEVIATION FROM DESIGN SHALL BE APPROVED IN WRITING BY THE PUEBLO AND DESIGN ENGINEER IN ADVANCE OF IMPLEMENTATION.THE CONSTRUCTION START WILL BE AUTHORIZED BY WRITTEN NOTICE TO PROCEED ISSUED BY THE PUEBLO PROJECT MANAGER. A FORMAL CONSTRUCTION KICKOFF MEETING WILL BE HELD TO REVIEW THE ENVIRONMENTAL AND OTHER PROJECT CONDITIONS, INTRODUCE PROJECT PERSONNEL AND IDENTIFY ROLES AND RESPONSIBILITIES, DISCUSS ACCESS AND CLEARANCE REQUIREMENTS, DETERMINE NECESSARY SAFETY AND ACCESS RESTRICTIONS, AND IDENTIFY NOTIFICATIONS TO BE TAKEN IF CULTURAL RESOURCES ARE ENCOUNTERED OR OTHER UNANTICIPATED PROJECT CONDITIONS OCCUR. A FORMAL SUBSTANTIAL COMPLETION INSPECTION WILL BE DOCUMENTED WHEN THE SYSTEM IS OPERATIONAL, AND THE DESIGN ENGINEER SHALL BE RESPONSIBLE FOR DOCUMENTING ANY DEFICIENCIES OR WORK REQUIREMENTS. COMPLETION INSPECTION MUST ALSO BE DOCUMENTED AND ACCEPTED BY THE DESIGN ENGINEER AND PUEBLO PROJECT MANAGER.More from United States Department of the Interior posted in May 2025