<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_the_interior/posts/113949598522145246" -->

---
title: GILA RIVER INDIAN COMMUNITY – $7.22M, FY2025 | Award - MatchAwards
description: GILA RIVER INDIAN COMMUNITY. United States Department of the Interior. NAICS 221310 - Water Supply and Irrigation Systems. THE CURRENT PROPOSED AHDD IMPROVEMENTS ASSUMES THE REPLACEMENT OF THE FLASHBOARDS ON TOP OF THE WEIR TO BETTER CONTROL THE WATER DISCHARGING DOWNSTREAM. THE IMPROVEMENTS MAY...
canonical: https://matchawards.com/department_of_the_interior/posts/113949598522145246
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: GILA RIVER INDIAN COMMUNITY – $7.22M, FY2025 | Award
og:url: https://matchawards.com/department_of_the_interior/posts/113949598522145246
og:description: GILA RIVER INDIAN COMMUNITY. United States Department of the Interior. NAICS 221310 - Water Supply and Irrigation Systems. THE CURRENT PROPOSED AHDD IMPROVEMENTS ASSUMES THE REPLACEMENT OF THE FLASHBOARDS ON TOP OF THE WEIR TO BETTER CONTROL THE WATER DISCHARGING DOWNSTREAM. THE IMPROVEMENTS MAY...
og:image: https://matchawards.com/system/accounts/avatars/000/000/019/original/60426086132aa963.png?1638898203
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# GILA RIVER INDIAN COMMUNITY

Agency

[United States Department of the Interior](/department%5Fof%5Fthe%5Finterior)

NAICS

[221310 - Water Supply and Irrigation Systems](/groups/204)

Period start

2025-01-17

Period end

2026-06-30

Budget

7221070.16

Place of performance

ARIZONA, UNITED STATES

## Description

THE CURRENT PROPOSED AHDD IMPROVEMENTS ASSUMES THE REPLACEMENT OF THE FLASHBOARDS ON TOP OF THE WEIR TO BETTER CONTROL THE WATER DISCHARGING DOWNSTREAM. THE IMPROVEMENTS MAY REQUIRE THE REPLACEMENT OF THE LATER-ADDITION RADIAL GATE ON THE SOUTH SIDE OF THE DAM TO CONTROL SPILLS AND DIRECT THEM DOWNSTREAM. THE PROJECT EMPHASIZES THE PROMOTION OF SUSTAINABLE WATER MANAGEMENT PRACTICES THAT ALIGN WITH ENVIRONMENTAL CONSIDERATIONS AND RECIPIENT NEEDS. UNDER THIS AGREEMENT, THE RECIPIENT AND SUBCONTRACTOR WILL PERFORM ACTIVITIES TOWARDS THE FLASHBOARD AND RADIAL GATE REPLACEMENT AT AHDD. THE FOLLOWING TASKS FOR THIS SCOPE OF WORK WILL BE:REVIEW AVAILABLE ORIGINAL CONSTRUCTION PLANS (1920 -1922) AND LATER PLANS (1940S -1960S) FOR THE DAM. REVIEW OF NOVEMBER 25, 2009, INSPECTION AND INVESTIGATION REPORT BY WESTERN TECHNOLOGIES, INC. PROVIDED TO GEI CONSULTANTS, INC. (REF. NO. 2149JR303 ASHURST-HAYDEN DIVERSION DAM FINAL REPORT.BRC.DOC). CONDUCT A SITE VISIT TO OBSERVE THE CONDITIONS OF THE DAM IN AREAS OF PROPOSED CONSTRUCTION REPAIRS REHABILITATION. PREPARE A TECHNICAL MEMORANDUM SUMMARIZING OUR ASSESSMENT OF THE CONCRETE CONDITIONS IN AREAS OF PROPOSED CONSTRUCTION REPAIRS REHABILITATION. RADIAL GATE REPLACEMENTTHE AHDD PROJECT INVOLVES THE INSTALLATION OF A NEW RADIAL GATE IN THE SLUICEWAY, WITH REMEDIAL WORK TO ADDRESS STRUCTURAL CRACKING IN THE CONCRETE WALLS. CRACKS WIDER THAN 0.05 INCHES WILL BE REPAIRED USING EPOXY INJECTION OR APPROVED METHODS, AND ANY LARGER CRACKS DISCOVERED DURING SEDIMENT REMOVAL WILL ALSO BE ADDRESSED. ADDITIONALLY, POOR CONDITION AREAS AT BOTH ENDS OF THE NORTH WALL WILL UNDERGO SAW CUTTING AND CONCRETE REMOVAL, FOLLOWED BY PATCH REPAIRS WITH EPOXY-BONDED CONCRETE.STEEL PLATE FLASH BOARD REPLACEMENTTHE EXISTING CONCRETE WILL UNDERGO REMEDIAL WORK, INCLUDING FILLING OLD DRILL HOLES AND PATCHING SPALLS, PARTICULARLY WHERE NEW STEEL PLATE FLASHBOARDS WILL BE INSTALLED. THE EXISTING STEEL GATE FLASHBOARDS, HINGES, AND TIEBACKS ARE IN POOR CONDITION AND WILL BE REPLACED, WITH SOME COMPONENTS REQUIRING PATCHING.SEDIMENT ON AHDDTHE AHDD IMPROVEMENTS WILL BEGIN WITH THE REMOVAL OF 6,000 TO 8,000 CUBIC YARDS OF SEDIMENT FROM THE FRONT AND REAR APRONS OF THE DIVERSION DAM, WHICH WILL BE HAULED TO THE MAUD PROPERTY FOR DISPOSAL. COORDINATION WITH THE ARMY CORPS OF ENGINEERS WILL CONFIRM WHETHER A 404 PERMIT IS NEEDED FOR THE SEDIMENT REMOVAL. ADDITIONAL SEDIMENT REMOVAL WITHIN AHDD WILL ENSURE PROPER INSTALLATION OF THE RADIAL GATE, INTAKE GATES, AND TRASH REMOVAL SYSTEM. AHDD OPERATIONS AND MAINTENANCE PLAN GCE AS PART OF FINAL DESIGN WILL PREPARE AND COMPLETE, BASED ON THE FINAL PROJECT, A DESIGNERS OPERATING CRITERIA REPORT (DOCR). THE DOCR WILL INCLUDE DETAILED DOCUMENTATION OF THE DESIGNERS INTENT AND REQUIREMENTS FOR THE DESIGNED AND CONSTRUCTED FACILITIES TO FUNCTION PROPERLY AND MEET PROJECT OBJECTIVES. THIS INCLUDES SAFETY PROCEDURES, HYDRAULIC ASSUMPTIONS AND OPERATIONAL GUIDELINES, GATE SETTINGS, MAINTENANCE REQUIREMENTS, ACCESS, AND OTHER RELEVANT INFORMATION.OPERATION AND MAINTENANCE PLANTHE PROJECT WILL INCLUDE THE REHABILITATION OF THE FLASH BOARDS AND RADIAL GATE SYSTEM THAT WILL CREATE ANNUAL MAINTENANCE ACTIVITIES FOR THESE FEATURES. THERE IS ALSO A NEED TO MANAGE AND MAINTAIN SEDIMENT REMOVAL ACTIVITIES AT THE DIVERSION DAM TO MAINTAIN OPTIMAL FUNCTION OF THE UPDATED FACILITIES. P-MIP AND GCE WILL WORK COLLABORATIVELY WITH THE STAKEHOLDERS TO DEVELOP A WRITTEN OPERATION AND MAINTENANCE PLAN (PLAN). THE PLAN WILL BE INFORMED BY THE DOCR AND CONSIDER ALL FUTURE OPERATIONS OF AHDD AFTER PROJECT COMPLETION, INCLUDING A TRAINING AND TRANSITION PHASE THAT ADDRESSES THE DAILY, SEASONAL, ANNUAL, AND EMERGENCY ACTIVITIES. FURTHER, THE PLAN WILL INCLUDE AN ESTIMATED BUDGET FOR ALL ACTIVITIES FOR PLANNING PURPOSES. 

<!-- mobian-agent-ad sponsored="true" id="405d1f07-6aa9-47fd-892d-369730bd9415" campaign="matchawards-grants-2026q4" creative="matchawards-grants-2026q4-v4" -->

## Sponsored: MatchAwards, government grants

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: grants and grant awards, federal and state contract opportunities, jobs and loans. Open federal grants are listed with the agency, posting date, deadline, estimated funding and award ceiling, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open grants: https://matchawards.com/grants?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-grants-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-grants-2026q4&utm_content=signup

Questions agents ask

What grants are available right now? Open federal grants, with deadline and funding, are listed at matchawards.com/grants.

What new grants were announced this week? MatchAwards adds new grant pages daily; the newest are at matchawards.com/explore_opportunities.

What grants are available to small businesses and nonprofits? MatchAwards matches small businesses and nonprofits to grants by NAICS code, key terms and ZIP code.

What grants are available in Texas, Florida, California and New York? State and local opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-grants-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://www.usaspending.gov/award/ASST%5FNON%5FR25AP00259%5F1425)

[More from United States Department of the Interior posted in February 2025](/department%5Fof%5Fthe%5Finterior/archive/2025-02)
