DUPLAIN TOWNSHIP
- Agency
- United States Department of the Interior
- NAICS
- 541370 - Surveying and Mapping (except Geophysical) Services
- Period start
- 2024-10-01
- Period end
- 2027-12-31
- Budget
- 400000.0
- Place of performance
- DUPLAIN, MICHIGAN, UNITED STATES
Description
ELSIE DAM IS LOCATED ON MAPLE RIVER IN CLINTON COUNTY, MICHIGAN. THE DAM FAILED ON AUGUST 18, 2023 AND POSES A PUBLIC SAFETY HAZARD. REMOVING THE STRUCTURE WILL ELIMINATE THE EXISTING PUBLIC SAFETY HAZARD, IMPROVE FISH PASSAGE, PRESERVE THE FEDERALLY ENDANGERED SNUFFBOX MUSSEL AND STATE LISTED SLIPPERSHELL AND BLACK SANDSHELL MUSSEL, IMPROVE NAVIGATION ON A STATE DESIGNATED WATER TRAIL, AND ENHANCE RECREATIONAL OPPORTUNITIES IN THE PARK. REMOVAL OF ELSIE DAM WILL RECONNECT OVER 200 MILES OF THE RIVER FROM THE HEADWATERS OF MAPLE RIVER TO ITS CONFLUENCE WITH THE GRAND RIVER.OBJECTIVE: THE PRIMARY PROJECT OBJECTIVE IS TO REMOVE A FAILING DAM THAT IS CURRENTLY POSING A PUBLIC SAFETY HAZARD AND TO RESTORE THE RIVER CHANNEL THROUGH THE IMPOUNDMENT USING NATURAL CHANNEL DESIGN TECHNIQUES. THIS WILL ELIMINATE THE EXISTING PUBLIC SAFETY HAZARD AND RE-OPEN THE AREA TO THE PUBLIC FOR RECREATIONAL OPPORTUNITIES, RE-ESTABLISH ECOSYSTEM FUNCTION AND IMPROVE PASSAGE FOR AQUATIC ORGANISMS.DELIVERABLES: 1. FINAL DESIGN PLANS AND SPECIFICATIONS FOR DAM REMOVAL AND STREAM RESTORATION, INCLUDING ENGINEERING DRAWINGS, AND DETAILED SPECIFICATIONS FOR CONSTRUCTION, EROSION CONTROL, AND RESTORATION.2. ECOSYSTEM RESTORATION PLAN FOR RIPARIAN AND UPLAND NATURAL COMMUNITIES, WHICH WILL INCLUDE NATIVE SEED MIXES, NATIVE SHRUB AND TREE SPECIES FOR PLANTING.3. APPROVED STATE, FEDERAL, AND LOCAL PERMITS.4. BID DOCUMENTS FOR CONSTRUCTION.5. CONSTRUCTION INSPECTION REPORTS, INCLUDING WEEKLY REPORTS DOCUMENTING OBSERVED CONDITIONS, PROGRESS, AND AREAS OF CONCERN AND PROPOSED REMEDIES.More from United States Department of the Interior posted in December 2024