COUNTY OF, CHELAN
- Agency
- United States Department of the Interior
- NAICS
- 221310 - Water Supply and Irrigation Systems
- Period start
- 2024-03-28
- Period end
- 2025-12-31
- Budget
- 468903.0
- Place of performance
- WASHINGTON, UNITED STATES
Description
THE CHELAN COUNTY NATURAL RESOURCE DEPARTMENT, IN COORDINATION WITH THE WASHINGTON DEPARTMENT OF NATURAL RESOURCES, WILL RESTORE WET MEADOW HYDROLOGY IN CAMAS MEADOWS, A UNIQUE MEADOW ECOSYSTEM WITHIN THE STEEP CANYON DRAINAGES OF NORTH-CENTRAL CASCADE MOUNTAINS IN WASHINGTON THAT OFFERS ONE OF THE HIGHEST NATURAL WATER STORAGE AND STREAMFLOW RESTORATION OPPORTUNITIES IN THE WENATCHEE BASIN (NSD 2022). THE 1,300 ACRE MEADOW WAS PROTECTED AS A NATURAL AREAS PRESERVE BY WA DNR IN 1987 AND INTO CAMAS CREEK, A MAJOR TRIBUTARY THAT FLOWS INTO PESHASTIN CREEK AT RIVER MILE 6.2 IN THE WENATCHEE WATERSHED. DUE TO WIDESPREAD FLOODPLAIN DISCONNECTION AND IRRIGATION WITHDRAWALS, THE PESHASTIN SUB-BASIN IS AMONG THE TOP THREE FLOW-LIMITED SUB-BASINS IN THE WENATCHEE WATERSHED, WITH CHRONIC LOW FLOWS AND HIGH STREAM TEMPERATURES LIMITING RECOVERY OF ESA-LISTED STEELHEAD AND SPRING CHINOOK THAT RESIDE THROUGHOUT PESHASTIN CREEK AND IN THE LOWER REACHES OF CAMAS CREEK. HISTORICALLY A MASSIVE NATURAL WATER STORAGE FEATURE ON THE LANDSCAPE, A LEGACY OF HISTORICAL AGRICULTURE INCLUDING DITCHING, LEVELING, GRAZING, AND FIRE SUPPRESSION HAS RESULTED IN CAMAS MEADOWS BEING CONFINED INTO DITCH-LIKE CHANNELS WITH INCISION RANGING FROM 4-8 FEET, CAUSING RAPID AND EARLY DRYING OF THE MEADOW. A COLLABORATIVE TWO YEAR PLANNING AND ASSESSMENT PROCESS RESULTED IN THE DEVELOPMENT OF THE CAMAS MEADOWS RESTORATION PLAN. PROJECT RESTORATION ACTIONS IDENTIFIED IN THE PLAN AND TO BE IMPLEMENTED UNDER THIS PROJECT INCLUDE ADDRESSING THE PRIMARY DRIVERS OF INCISION BY REPLACING THE MEADOW OUTLET CULVERT AND RESETTING THE MEADOW GRADE ELEVATIONS, CHANNEL REGRADING, INSTALLATION OF CHANNEL-SPANNING HABITAT LOG STRUCTURES, AND RE-PLANTING WITH NATIVE SHRUBS AND PLANTS. THROUGH THESE ACTIONS THE PROJECT WILL RESTORE FLOODPLAIN CONNECTIVITY AND WET MEADOW HYDROLOGY FOR A MODELED ADDITIONAL WATER STORAGE OF 180 ACRE-FEET AND A YEAR-ROUND BASEFLOW CONTRIBUTION OF 0.2 CFS. ADDITIONAL PROJECT BENEFITS INCLUDE EXPANDED LISTED-PLANT SPECIES HABITAT, IMPROVED AQUATIC AND WETLAND ECOSYSTEMS, AND INCREASED COLD GROUNDWATER FLOW TO DOWNSTREAM ESA-LISTED SPECIES HABITAT. THE PROJECT ADDRESSES TOP PRIORITY ACTIONS IN THE WENATCHEE WATERSHED PLAN, IS SUPPORTED BY LOCAL TRIBES AND WATER DISTRICTS, PROTECTS TRIBAL USES OF THE MEADOW, AND WILL PROVIDE CLIMATE RESILIENCY AND NATURAL WATER INFRASTRUCTURE TO ECOSYSTEMS AND COMMUNITIES WITHIN A CRITICAL LOW-FLOW BASIN.More from United States Department of the Interior posted in April 2024