EAST BENCH IRRIGATION DISTRICT
- Agency
- United States Department of the Interior
- NAICS
- 221310 - Water Supply and Irrigation Systems
- Period start
- 2024-02-21
- Period end
- 2025-09-30
- Budget
- 188296.0
- Place of performance
- MONTANA, UNITED STATES
Description
THE EAST BENCH IRRIGATION DISTRICT (EBID) IS IN SOUTHWEST MONTANA WITHIN BEAVERHEAD COUNTY. THE EBID CARTER CREEK LINING HEADGATE AUTOMATION PROJECT IS CLASSIFIED AS AN IRRIGATION REHABILITATION PROJECT THAT WILL PROVIDE FOR LINING OF APPROXIMATELY 600 LINEAL FEET OF CANAL ALONG WITH AN UPGRADE OF THE GATES ON THE CARTER CREEK AND WILSON CHECK STRUCTURES WITH NEW AUTOMATED GATES AND TELEMETRY THAT WILL IMPROVE IRRIGATION EFFICIENCY, CONSERVE WATER, PRESERVE WATER QUALITY, AND MANAGEMENT WATER IN THE IRRIGATION SYSTEM. THE PRIMARY PURPOSE FOR THE PROPOSED LINING AND GATE AUTOMATION PROJECT IS TO CONSERVE WATER DIVERTED FROM THE BEAVERHEAD RIVER AND IMPROVE THE IRRIGATION EFFICIENCY WITHIN THE EBIDS WATER DELIVERY SYSTEM. INSTALLING ACTUATORS TO AUTOMATE THE GATES AT EACH STRUCTURE, INSTALLING APPROXIMATELY 600 LINEAL FEET OF LINER, AND INTEGRATING THE GATES INTO THE EBIDS SCADA SYSTEM WILL ALLOW THE EBID TO REMOTELY CONTROL FLOWS WITHIN THE CANAL SYSTEM. THE ABILITY TO REMOTELY CONTROL THE GATES AT EACH STRUCTURE WILL SIGNIFICANTLY REDUCE OPERATION AND MAINTENANCE ACTIVITIES COSTS, IMPROVE IRRIGATION EFFICIENCY, CONSERVE WATER, IMPROVE AGRICULTURAL PRODUCTION, AND DEVELOP AGRICULTURAL ACRES. THE MANUAL STRUCTURES CANNOT BE EFFECTIVELY CONTROLLED TO CHANGE WATER LEVELS WITHIN THE MAIN CANAL WHEN NEEDED, ARE DIFFICULT TO OPERATE, AND CAUSE SIGNIFICANT WATER SHORTAGES TO TURNOUTS ESPECIALLY LATER IN THE IRRIGATION SEASON. PRIMARY ISSUES ARE THE CHECK STRUCTURES ARE DIFFICULT TO ACCESS AND THE EBID HAS LIMITED PERSONNEL TO OPERATE THEM WHEN NEEDED. ALSO, THERE IS OFTEN INSUFFICIENT HEAD TO DIVERT WATER TO TURNOUTS, AND THE EXISTING SYSTEM IS A HAZARD TO EBID PERSONNEL AND THE PUBLIC. TO OPERATE THE SYSTEM, THE EBID MUST INCREASE FLOWS IN THE MAIN CANAL BY OVER 20 CFS TO MEET DEMAND OF USERS, WATER WHICH COULD REMAIN IN CLARK CANYON RESERVOIR OR THE BEAVERHEAD RIVER. LASTLY, AN EXISTING 600-FOOT SECTION OF THE MAIN CANAL LEADING UP TO THE CARTER CREEK SIPHON IS LEAKING OVER 2.5 CFS, HAS SATURATED THE STEEP DOWNSLOPE BANK OF THE CANAL WHICH MAY LEAD TO A MAJOR FAILURE OF THE CANAL. THIS SECTION OF THE CANAL WILL BE LINED TO ELIMINATE CANAL SEEPAGE INTO THE UNDERLYING SOIL. PROJECT PARTNERS INCLUDE RECLAMATION, EAST BENCH IRRIGATION DISTRICT, AND THE WATER USERS. THE PROPOSED PROJECT WILL PROVIDE CONSERVATION, MANAGEMENT, DEVELOPMENT, AND PRESERVATION OF MONTANAS WATER RESOURCES.More from United States Department of the Interior posted in March 2024