COEUR D'ALENE TRIBE
- Agency
- United States Department of the Interior
- NAICS
- 541370 - Surveying and Mapping (except Geophysical) Services
- Period start
- 2023-10-11
- Period end
- 2025-09-30
- Budget
- 500799.42
- Place of performance
- IDAHO, UNITED STATES
Description
THE COEUR D ALENE TRIBE IN PARTNERSHIP WITH THE WORLEY HIGHWAY DISTRICT REQUESTS FUNDING TO ADDRESS FISH PASSAGE AND INFRASTRUCTURE NEEDS IN THE LAKE CREEK WATERSHED THAT WILL COMPLEMENT AND ENHANCE THE BENEFITS FROM PLANNED RESTORATION ACTIONS. WE PROPOSE TO DESIGN AND REPLACE AGING, UNDERSIZED CULVERTS WITH ENGINEERED BOTTOMLESS ARCHES THAT WILL AFFORD SUPERIOR LONGITUDINAL AND LATERAL CONNECTIVITY ACROSS MORE THAN 2.08 MILES OF STREAM AND 65 ACRES OF FLOODPLAIN HABITATS THAT HAVE BEEN TARGETED FOR RESTORATION. THE ROADS THAT INTERCEPT THE FLOODPLAIN IN THESE LOCATIONS WILL BE UPGRADED AND RETROFITTED WITH ADDITIONAL DRAINAGE STRUCTURES THAT MAXIMIZE LATERAL CONNECTIVITY AT HIGHER DISCHARGE RATES TO BOTH PROTECT CRITICAL INFRASTRUCTURE AND ENSURE THAT RIVERINE FLOODPLAIN WETLANDS WILL BENEFIT FROM SIGNIFICANT FUNCTIONAL UPLIFT. PROJECT DESIGNS AND REQUIRED PERMITTING WILL BE COMPLETED BETWEEN OCTOBER 2023 AND MAY 2024 WITH CONSTRUCTION OCCURRING DURING LOW FLOW CONDITIONS IN 2024 AND 2025. REQUESTED FUNDS TOTAL 500,799.42, WITH 82,860.74 PROVIDED AS MATCHING FUNDS.More from United States Department of the Interior posted in February 2024