ClickCease STATE OF CALIFORNIA DEPARTMENT OF WATER RESOURCES – $190K, FY2024 | Award - MatchAwards

STATE OF CALIFORNIA DEPARTMENT OF WATER RESOURCES

Agency
United States Department of the Interior
NAICS
221310 - Water Supply and Irrigation Systems
Period start
2024-01-01
Period end
2028-05-18
Budget
190000.0
Place of performance
CALIFORNIA, UNITED STATES

Description

THE PROJECT AREA IS LOCATED ON THE SACRAMENTO RIVER BETWEEN RIVER MILE (RM) 219 AND RM 222 NEAR THE CITY OF CORNING AND THE TOWN OF VINA IN TEHAMA COUNTY. THE PROJECT AREA CONSISTS OF THE KOPTA SLOUGH PROPERTY, WHICH IS CURRENTLY UNDER THE OWNERSHIP OF STATE OF CALIFORNIAS ENVIRONMENTAL TRUST BUT MAY BE UNDER U.S. FISH AND WILDLIFE SERVICE (USFWS) OWNERSHIP AT THE TIME OF PROJECT IMPLEMENTATION.THE PURPOSE OF THE PROPOSED PROJECT IS TO RESTORE SACRAMENTO RIVER FLOODPLAIN HABITAT AND HYDROLOGIC AND GEOMORPHIC FUNCTION IN THE VICINITY OF KOPTA SLOUGH (BETWEEN RM 219 AND RM 222). THE NEED FOR THIS ACTION DERIVES FROM THE LOSS OF HYDROLOGIC AND GEOMORPHIC FUNCTION RESULTING FROM PLACEMENT OF ROCK REVETMENT ALONG SECTIONS OF THE SACRAMENTO RIVER THAT PREVIOUSLY MEANDERED ACROSS THE FLOODPLAIN AND PROVIDED HABITAT TO JUVENILE SALMONIDS.PROJECT OBJECTIVES ARE TO: 1) RESTORE, ENHANCE, AND CONSERVE FLOODPLAIN HABITAT, 2) RESTORE HYDROLOGIC AND GEOMORPHIC FUNCTION, 3) IMPROVE FISH AND WILDLIFE HABITAT, 4) REDUCE FLOOD MANAGEMENT SYSTEM OPERATION AND MAINTENANCE COSTS AND RESPONSIBILITIES, 5) FACILITATE THE ENHANCEMENT OF RECREATIONAL OPPORTUNITIES.THE PROPOSED PROJECT CONSISTS OF ROCK REVETMENT REMOVAL ALONG THE SACRAMENTO RIVERS RIGHT BANK AT THE KOPTA SLOUGH PROPERTY TO RESTORE NATURAL FLUVIAL AND FLOODPLAIN PROCESSES RESTORATION OF THE AGRICULTURAL PORTION OF THE KOPTA SLOUGH PROPERTY TO ESTABLISH NATIVE FLOODPLAIN HABITAT TRANSFER OF OWNERSHIP OF THE KOPTA SLOUGH PROPERTY TO THE USFWS TO FACILITATE ITS LONG-TERM CONSERVATION AND MANAGEMENT, AS WELL AS FACILITATE THE ENHANCEMENT OF PUBLIC RECREATIONAL OPPORTUNITIES AND PRE- AND POST-PROJECT TIER 1 MONITORING. FEDERAL FUNDING WOULD BE USED FOR PROJECT IMPLEMENTATION, WHICH INCLUDES THE FOLLOWING TASKS: 1) CONSTRUCTION CONTRACTING, 2) TEMPORARY ENTRY PERMITTING, 3) BIOLOGICAL SURVEYS AND PROTECTION MEASURES, 4) SITE PREPARATION, 5) PROJECT ELEMENT 1: FULL REMOVAL OF ROCK REVETMENT ALONG THE KOPTA SLOUGH PROPERTY, 6) PROJECT ELEMENT 2: RESTORE 176 ACRES OF FLOODPLAIN HABITAT, 7) PROJECT ELEMENT 3: TRANSFER OWNERSHIP OF THE KOPTA SLOUGH PROPERTY, 8)TIER 1 MONITORING STUDY DESIGN.THE PROPOSED PROJECT WOULD CONTRIBUTE TO JUVENILE REARING HABITAT RESTORATION IN THE MAINSTEM UPPER SACRAMENTO RIVER AND MONITORING OF THE CHANGE IN HABITAT THROUGH TIME, WHICH ARE A RECOMMENDED RESTORATION ACTION AND HIGH PRIORITY MONITORING NEED FOR CHINOOK SALMON, RESPECTIVELY, IN THE NEAR-TERM RESTORATION STRATEGY (NTRS) FOR THE CENTRAL VALLEY PROJECT IMPROVEMENT ACT FISH RESOURCE AREA FY2021-FY2025. THE PROPOSED PROJECT ALSO ALIGNS WITH OBJECTIVES OF THE CENTRAL VALLEY PROJECT IMPROVEMENT ACT SECTION 3406 (B)(13), WHICH STATES THE PROGRAM SHALL INCLUDE PREVENTIVE MEASURES, SUCH AS RE-ESTABLISHMENT OF MEANDER BELTS AND LIMITATIONS ON FUTURE BANK PROTECTION ACTIVITIES, IN ORDER TO AVOID FURTHER LOSSES OF INSTREAM AND RIPARIAN HABITAT. THE TOTAL TIMEFRAME FOR THE PROPOSED PROJECT WOULD SPAN FROM SEPTEMBER 2023 TO MARCH 2028 (54 MONTHS).

Source notice

More from United States Department of the Interior posted in February 2024