MUSKEGON RIVER WATERSHED ASSEMBLY
- Agency
- United States Department of the Interior
- NAICS
- 541620 - Environmental Consulting Services
- Period start
- 2024-01-01
- Period end
- 2025-09-30
- Budget
- 18827.6
- Place of performance
- EVART, MICHIGAN, UNITED STATES
Description
A 175 FOOT SECTION OF BANK ALONG THE MUSKEGON RIVER IS SEVERELY ERODING INCREASING SEDIMENT LOADING INTO THE SYSTEM AND DESTABILIZING LARGE TREES ALONG THE BANK THIS PROJECT WILL STABILIZE THE STREAM BANK USING LARGE WOODY DEBRIS COIR LOGS AND WOOD STAKES. THESE ACTIONS WILL RESULT IN A REDUCTION OF ONE AND A HALF TONS OF SAND INTO THE SYSTEM ANNUALLY INCREASE AND IMPROVE RIPARIAN HABITAT THROUGH TOE WOOD COIR LOG AND STAKE INSTALLATION AND RESTORE NATURAL STREAM FLOW FUNCTIONS BY STABILIZING SEDIMENT INPUTS INTO THE SYSTEM.More from United States Department of the Interior posted in February 2024