ClickCease HIGHLAND HANOVER IRRIGATION DISTRICT – $2M, FY2024 | Award - MatchAwards

HIGHLAND HANOVER IRRIGATION DISTRICT

Agency
United States Department of the Interior
NAICS
221310 - Water Supply and Irrigation Systems
Period start
2023-12-11
Period end
2025-06-30
Budget
2000000.0
Place of performance
WORLAND, WYOMING, UNITED STATES

Description

THE HIGHLAND HANOVER IRRIGATION DISTRICT (HHID) OWNS AND OPERATES A SERIES OF IRRIGATION CANALS IN THE WORLAND, WY AREA OF THE BIGHORN RIVER BASIN. THE HIGHLAND HANOVER IRRIGATION DISTRICT PUMP STATION REPLACEMENT IS A REPLACEMENT OF THE 1957 BUREAU OF RECLAMATION PUMP STATION, CONVEYING STORAGE WATER FROM THE BUREAU OF RECLAMATION BOYSEN RESERVOIR TO THE DISTRICTS CANALS. THE DISTRICT WILL REPLACE THE ORIGINAL BOR PUMPING UNITS IN THE PUMP STATION 2 THAT SERVE BOTH CANAL 2 AND THE COUTIS DITCH WITH MODERN PUMPS AND ELECTRICAL SYSTEMS INCLUDING VARIABLE FREQUENCY DRIVES (VFDS) AND ASSOCIATED CONTROLS, FOCUSING ON WATER SUPPLY DELIVERY, AS THE PUMPS HAVE ALL EXCEEDED THEIR USEFUL LIFE, HAVE DECREASED CAPACITY AND EFFICIENCY, AND THERE IS GREAT CONCERN PUMP FAILURE IS IMMINENT AND NEAR. NOT ONLY WILL REPLACEMENT ALLOW WATER DELIVERY TO USERS, IT WILL ALSO PROVIDE SUBSTANTIAL ENVIRONMENTAL BENEFITS BY UPGRADING SIXTY-FIVE YEAR OLD PUMPING EQUIPMENT, RESULTING IN ENERGY AND WATER SAVINGS. IT IS ANTICIPATED TO REDUCE WATER SPILLS BY APPROXIMATELY 4633.1 ACRE-FEET PER YEAR WITH ENERGY SAVINGS OF 758,726 KILOWATT HOURS PER YEAR THROUGH THE ADDITION OF LEVEL SENSORS, FLOW METERS, AND VFDS TO BETTER MATCH PUMP FLOWS TO SYSTEM DEMANDS. THE TOTAL PROPOSED PROJECT LENGTH INCLUDING DESIGN IS ESTIMATED AT 24 MONTHS FROM DESIGN TO CONSTRUCTION COMPLETION. DESIGN IS ESTIMATED TO BEGIN IN AUGUST OF 2022 WITH CONSTRUCTION COMMENCING JUNE OF 2023. THIS PROJECT IS UTILIZING STATE FUNDING IN CONJUNCTION WITH WATERSMART FUNDING, TO SUPPLEMENT THE IRRIGATION DISTRICT FUNDS.

Source notice

More from United States Department of the Interior posted in January 2024