<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_state/posts/113844015145380718" -->

---
title: Installation of CCTV System – United States Department of State | Closed - MatchAwards
description: Installation of CCTV System. United States Department of State. Solicitation 19BF5025Q0017. NAICS 561621 - Security Systems Services (except Locksmiths). Deadline 2025-02-07. Installation of CCTV system at USG property located in Nassau, The Bahamas. The installation will include the installation...
canonical: https://matchawards.com/department_of_state/posts/113844015145380718
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Installation of CCTV System – United States Department of State | Closed
og:url: https://matchawards.com/department_of_state/posts/113844015145380718
og:description: Installation of CCTV System. United States Department of State. Solicitation 19BF5025Q0017. NAICS 561621 - Security Systems Services (except Locksmiths). Deadline 2025-02-07. Installation of CCTV system at USG property located in Nassau, The Bahamas. The installation will include the installation...
og:image: https://matchawards.com/system/accounts/avatars/000/000/059/original/b1e87e8b0854e252.png?1638978695
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Installation of CCTV System

Status

Closed, the response deadline passed on Feb 7, 2025

Agency

[United States Department of State](/department%5Fof%5Fstate)

Office

WASHINGTON, USA

Notice type

Presolicitation

Solicitation number

19BF5025Q0017

NAICS

[561621 - Security Systems Services (except Locksmiths)](/groups/962)

PSC

6350 - MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS

Category

[Security Systems (3.2)](/categories/security-and-protection/security-systems)

Posted

2025-02-11

Deadline

2025-02-07

Place of performance

NASSAU, BAHAMAS, THE

## Description

Installation of CCTV system at USG property located in Nassau, The Bahamas. The installation will include the installation of equipment and any electrical work required.

<!-- mobian-agent-ad sponsored="true" id="8c1cf4fc-d0c0-458d-a86c-12e3e2ce0bd9" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/security-and-protection/security-systems?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


**SCOPE OF WORK**

* Supplying labor and material for installing CCTV equipment to view all perimeter of the property.
* All cameras should be position pointing away from any living space. This will include the pool, patio and any common occupant area. The system should be focus on the **perimeter only**.
* All cameras should be terminated and viewed at the south security booth.
* The system should be completely disconnected from any off-property network and should allow Absolutely no off property viewing. This requirement is during and after installation.
* Vendor is responsible for any electrical, masonry and carpentry needs require to complete scope of work. This will include poles, trenching and brackets.
* Fiber wiring should be used on all camera feeds over 50ft.
* Power for all cameras should be installed near the hub in a secure location with lock access.
* A minimum of 50” Monitor is required for main viewing.
* A minimum of 32” Monitor is required for spot viewing.
* All PTZ cameras should have auto patrol capabilities and manual control from the security booth.
* NVR programming should incorporate triggers which alert personnel, with and output siren/light mounted in security booth, off activities at any camera.
* Illuminators should be used to assist and enhance nighttime viewing.
* System should be able to maintain 21 day of recording before rewriting.
* Main hub and NVR should be locked in a cabinet/chassis to prevent unauthorized tampering.
* Any structural adjustments must be cleared by the RSC before proceeding.
* Any work not completed to the satisfaction of the RSC will be repaired or replaced by the company without additional expense, in equipment or labor costs, to the US Government.
* The company’s employees will clean up after themselves after every job. This includes removing any equipment and materials brought in by the company, and anything debris caused by installation.

**ELECTRICAL GENERAL SPECIFICATIONS**

* The contractor shall supply all materials and labor in order to complete the scope of works.
* All measurements are to be confirmed by the contractor on site.
* All work shall be carried out in a professional manner, with superior craftsmanship.
* The contractor is responsible to rectify any damage caused while executing the project upon completion of the works. All walls are to be repaired after installation of subsurface equipment.
* All work should meet or exceed the local codes
* The contractor shall ensure that all electrical enclosures or panels are housed in outdoor rated enclosures that meet or exceed NEMA 3R ratings.
* All electrical cables should be installed into appropriately sized non-metallic liquid-tight conduit.
* All electrical conduit should be buried to the appropriate depth based on code requirements.
* The use of direct burial cable is prohibited.
* The contractor shall use non-metallic wall boxes as a replacement for existing electrical wall boxes.
* The contractor is to ensure that all boxes are grounded as per code. Where grounding is not provided contractor is to install as necessary.
* The contractor shall ensure that all TV cable (RG6) or fiber lines are labeled and terminated at both ends.
* The contractor shall ensure that all underground electrical ducts terminate at each end with a pull/splice box.
* The contractor is responsible to dispose of all materials removed from the house.
* The electrical contractor will coordinate his work with the overall progress of the project, to avoid miscommunications and rework.
* Electrical contractors will provide regular progress updates to the Embassy staff electrician. The overall project manager will be the Facilities Manager, or the Maintenance Supervisor in the absence of the Facilities Manager.

Interested vendors should email NelsonDA@state.gov for a copy of the solicitation documents.

 You are encouraged to visit www.bahamas.gov.bs to see requirements to operate in The Bahamas

[Source notice](https://sam.gov/opp/3daeedf1aeb14ac1bcc779a702906919/view)

[More from United States Department of State posted in January 2025](/department%5Fof%5Fstate/archive/2025-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Installation of CCTV System","description":"Installation of CCTV system at USG property located in Nassau, The Bahamas. The installation will include the installation of equipment and any electrical work required. SCOPE OF WORK Supplying labor and material for installing CCTV equipment to view all perimeter of the property. All cameras should be position pointing away from any living space. This will include the pool, patio and any common occupant area. The system should be focus on the perimeter only . All cameras should be terminated and viewed at the south security booth. The system should be completely disconnected from any off-property network and should allow Absolutely no off property viewing. This requirement is during and after installation. Vendor is responsible for any electrical, masonry and carpentry needs require to complete scope of work. This will include poles, trenching and brackets. Fiber wiring should be used on all camera feeds over 50ft. Power for all cameras should be installed near the hub in a secure location with lock access. A minimum of 50” Monitor is required for main viewing. A minimum of 32” Monitor is required for spot viewing. All PTZ cameras should have auto patrol capabilities and manual control from the security booth. NVR programming should incorporate triggers which alert personnel, with and output siren/light mounted in security booth, off activities at any camera. Illuminators should be used to assist and enhance nighttime viewing. System should be able to maintain 21 day of recording before rewriting. Main hub and NVR should be locked in a cabinet/chassis to prevent unauthorized tampering. Any structural adjustments must be cleared by the RSC before proceeding. Any work not completed to the satisfaction of the RSC will be repaired or replaced by the company without additional expense, in equipment or labor costs, to the US Government. The company’s employees will clean up after themselves after every job. This includes removing any equipment and materials brought in by the company, and anything debris caused by installation. ELECTRICAL GENERAL SPECIFICATIONS The contractor shall supply all materials and labor in order to complete the scope of works. All measurements are to be confirmed by the contractor on site. All work shall be carried out in a professional manner, with superior craftsmanship. The contractor is responsible to rectify any damage caused while executing the project upon completion of the works. All walls are to be repaired after installation of subsurface equipment. All work should meet or exceed the local codes The contractor shall ensure that all electrical enclosures or panels are housed in outdoor rated enclosures that meet or exceed NEMA 3R ratings. All electrical cables should be installed into appropriately sized non-metallic liquid-tight conduit. All electrical conduit should be buried to the appropriate depth based on code requirements. The use of direct burial cable is prohibited. The contractor shall use non-metallic wall boxes as a replacement for existing electrical wall boxes. The contractor is to ensure that all boxes are grounded as per code. Where grounding is not provided contractor is to install as necessary. The contractor shall ensure that all TV cable (RG6) or fiber lines are labeled and terminated at both ends. The contractor shall ensure that all underground electrical ducts terminate at each end with a pull/splice box. The contractor is responsible to dispose of all materials removed from the house. The electrical contractor will coordinate his work with the overall progress of the project, to avoid miscommunications and rework. Electrical contractors will provide regular progress updates to the Embassy staff electrician. The overall project manager will be the Facilities Manager, or the Maintenance Supervisor in the absence of the Facilities Manager. Interested vendors should email NelsonDA@state.gov for a copy of the solicitation documents. You are encouraged to visit www.bahamas.gov.bs to see requirements to operate in The Bahamas","url":"https://matchawards.com/department_of_state/posts/113844015145380718","identifier":"19BF5025Q0017","category":"561621 - Security Systems Services (except Locksmiths)","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"6350 - MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"3.2 Security Systems","url":"https://matchawards.com/categories/security-and-protection/security-systems"}],"availabilityStarts":"2025-02-11","availabilityEnds":"2025-02-07","validThrough":"2025-02-07T23:59:59-05:00","areaServed":"NASSAU, BAHAMAS, THE","sameAs":"https://sam.gov/opp/3daeedf1aeb14ac1bcc779a702906919/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"}]}
```

