<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_state/posts/112018905504562619" -->

---
title: Q&A for Swimming Pool Cover for an Official Residence… | Closed - MatchAwards
description: Q&A for Swimming Pool Cover for an Official Residence (Shenandoah). United States Department of State. Solicitation 19SA7024Q0011. Deadline 2024-03-07. QUESTIONS AND ANSWERS (Q&A) SOLICITATION # 19SA7024Q0011 (Shanandoah CMR Swimming Pool Cover) Q1: General specification on page 10 states that...
canonical: https://matchawards.com/department_of_state/posts/112018905504562619
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Q&A for Swimming Pool Cover for an Official Residence… | Closed
og:url: https://matchawards.com/department_of_state/posts/112018905504562619
og:description: Q&A for Swimming Pool Cover for an Official Residence (Shenandoah). United States Department of State. Solicitation 19SA7024Q0011. Deadline 2024-03-07. QUESTIONS AND ANSWERS (Q&A) SOLICITATION # 19SA7024Q0011 (Shanandoah CMR Swimming Pool Cover) Q1: General specification on page 10 states that...
og:image: https://matchawards.com/system/accounts/avatars/000/000/059/original/b1e87e8b0854e252.png?1638978695
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Q&A for Swimming Pool Cover for an Official Residence (Shenandoah)

Status

Closed, the response deadline passed on Mar 7, 2024

Agency

[United States Department of State](/department%5Fof%5Fstate)

Office

WASHINGTON, USA

Notice type

Special Notice

Solicitation number

19SA7024Q0011

PSC

9520 - STRUCTURAL SHAPES

Category

[Basic Materials (5.6)](/categories/industrial-products-and-services/basic-materials)

Posted

2024-02-29

Deadline

2024-03-07

Place of performance

Riyadh

## Description

QUESTIONS AND ANSWERS (Q&A) SOLICITATION # 19SA7024Q0011 (Shanandoah CMR Swimming Pool Cover) Q1: General specification on page 10 states that all metal steel structure and trusses must be powder coated in black. But these elements will be located below the top checkered plate and will not be visible. Please confirm if this black powder coating is really required? A1: Yes, it is required. Q2: General specification on page 10 states to provide 10mm thick heavy duty rubber insulators to be attached to the steel plates for all the steel structures which are in contact with the pool. Such rubber insulators will increase the thickness below the top cover plate which will rest on the perimeter wall of the pool causing trip hazard. Kindly confirm if these rubber insulators are mandatory requirement? A2: Yes. Q3: General specification on page 09 states that the top cover must be checkered plate aluminum with minimum thickness of 5mm powder coated with the same color of the floor surrounding the pool. But during site visit, we understood that the entire assembly of supporting structure and top cover must be stainless steel. Kindly confirm. A3: The top cover may be constructed from either aluminum or stainless steel with a minimum thickness of 5mm powder coated. Q4: Please confirm if we need to submit structural design calculation from a structural engineer for approval to show that our proposed structure can carry concentrated load of 100 kg / sqm? A4: Initial designs should be included in the submission documents as they are one of the criteria used in the technical evaluation process. Once the contract is awarded, the final designs and load calculations must be submitted for approval before commencing fabrication. Q5: Section 3 Solicitation Provisions under point A.2 (2) states Evidence that the offeror/quoter operates an established business with a permanent address and telephone listing in Saudi Arabia or plans to establish an office within 30 days of contract award. Kindly note that our company is established in Bahrain, and we will use Bahraini or Saudi based subcontractor to accomplish this task order. Kindly confirm. A5: All offerors can use a subcontractor(s). Q6: Section 3- Solicitation Provisions under point A.2 (6) states The offeror shall address its plan to obtain all licenses and permits required by local law (see DOSAR 652.242-73 in Section 2). If offeror already possesses the locally required licenses and permits, a copy shall beprovided. Kindly let us know if there are any specific licenses and permits which will be required to perform the scope under this project? A6: Please refer to Section 3, Solicitation Provisions, A.2(2). 

<!-- mobian-agent-ad sponsored="true" id="7c564060-e84a-43c7-8ac5-a9f21c9d855a" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/basic-materials?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/1a13197ef95d43beb3e12dd647fee83c/view)

[More from United States Department of State posted in March 2024](/department%5Fof%5Fstate/archive/2024-03)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Q\u0026A for Swimming Pool Cover for an Official Residence (Shenandoah)","description":"QUESTIONS AND ANSWERS (Q\u0026A) SOLICITATION # 19SA7024Q0011 (Shanandoah CMR Swimming Pool Cover) Q1: General specification on page 10 states that all metal steel structure and trusses must be powder coated in black. But these elements will be located below the top checkered plate and will not be visible. Please confirm if this black powder coating is really required? A1: Yes, it is required. Q2: General specification on page 10 states to provide 10mm thick heavy duty rubber insulators to be attached to the steel plates for all the steel structures which are in contact with the pool. Such rubber insulators will increase the thickness below the top cover plate which will rest on the perimeter wall of the pool causing trip hazard. Kindly confirm if these rubber insulators are mandatory requirement? A2: Yes. Q3: General specification on page 09 states that the top cover must be checkered plate aluminum with minimum thickness of 5mm powder coated with the same color of the floor surrounding the pool. But during site visit, we understood that the entire assembly of supporting structure and top cover must be stainless steel. Kindly confirm. A3: The top cover may be constructed from either aluminum or stainless steel with a minimum thickness of 5mm powder coated. Q4: Please confirm if we need to submit structural design calculation from a structural engineer for approval to show that our proposed structure can carry concentrated load of 100 kg / sqm? A4: Initial designs should be included in the submission documents as they are one of the criteria used in the technical evaluation process. Once the contract is awarded, the final designs and load calculations must be submitted for approval before commencing fabrication. Q5: Section 3 Solicitation Provisions under point A.2 (2) states Evidence that the offeror/quoter operates an established business with a permanent address and telephone listing in Saudi Arabia or plans to establish an office within 30 days of contract award. Kindly note that our company is established in Bahrain, and we will use Bahraini or Saudi based subcontractor to accomplish this task order. Kindly confirm. A5: All offerors can use a subcontractor(s). Q6: Section 3- Solicitation Provisions under point A.2 (6) states The offeror shall address its plan to obtain all licenses and permits required by local law (see DOSAR 652.242-73 in Section 2). If offeror already possesses the locally required licenses and permits, a copy shall beprovided. Kindly let us know if there are any specific licenses and permits which will be required to perform the scope under this project? A6: Please refer to Section 3, Solicitation Provisions, A.2(2).","url":"https://matchawards.com/department_of_state/posts/112018905504562619","identifier":"19SA7024Q0011","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"9520 - STRUCTURAL SHAPES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.6 Basic Materials","url":"https://matchawards.com/categories/industrial-products-and-services/basic-materials"}],"availabilityStarts":"2024-02-29","availabilityEnds":"2024-03-07","validThrough":"2024-03-07T23:59:59-05:00","areaServed":"Riyadh","sameAs":"https://sam.gov/opp/1a13197ef95d43beb3e12dd647fee83c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"}]}
```

