ClickCease THE REGENTS OF THE UNIVERSITY OF COLORADO – $289K, FY2025 | Award - MatchAwards

THE REGENTS OF THE UNIVERSITY OF COLORADO

Agency
United States Department of Commerce
NAICS
541380 - Testing Laboratories and Services
Period start
2024-10-01
Period end
2027-09-30
Budget
289243.0
Place of performance
BOULDER, COLORADO 80309, UNITED STATES

Description

PURPOSE: THE PURPOSE OF THIS GRANT WITH THE REGENTS OF THE UNIVERSITY OF COLORADO IS TO IMPROVE UNDERSTANDING OF THE IMPACT OF CLIMATE CHANGE-INDUCED DROUGHT AND HEAVY PRECIPITATION ON THE SOIL DYNAMIC BEHAVIOR AND ITS SUBSEQUENT IMPACT ON THE RISK OF SEISMIC LIQUEFACTION, EXCESSIVE DISPLACEMENT, AND DAMAGE IMPOSED ON STRUCTURES.ACTIVITIES TO BE PERFORMED: FOUR CENTRIFUGE TESTS WILL BE CONDUCTED TO ASSESS THE SEISMIC RESPONSE OF A SHALLOW-FOUNDED BUILDING STRUCTURE ON VARIOUS SOIL TYPES SUBJECTED TO DIFFERENT THERMO-HYDRAULIC LOADING CONDITIONS. A NEW CONSTITUTIVE MODEL WILL BE DEVELOPED IN AN OPENSOURCE PLATFORM TO COMPLEMENT THE EXPERIMENTAL STUDY. A NOVEL STATISTICAL-FINITE-ELEMENT MODEL WILL BE DEVELOPED (AND VALIDATED) TO SYNTHESIZE THE EXPERIMENTAL DATA AND FINITE ELEMENT MODELS USING A FULL MARKOV CHAIN MONTE CARLO APPROACH. EXPECTED OUTCOMES: RESULTS OF THIS RESEARCH WILL PROVIDE NEW NUMERICAL TOOLS TO ASSESS THE IMPACT OF TEMPERATURE AND MOISTURE ON THE SOIL DYNAMIC CHARACTERISTICS AND IN TURN LIQUEFACTION SUSCEPTIBILITY. THIS WILL ADDRESS THE CURRENT GAPS IN THE BUILDING CODE REQUIREMENT ON LIQUEFACTION ASSESSMENT UNDER CHANGING CLIMATE AND CAN INFORM DEVELOPMENT OF PRACTICAL PROVISIONS FOR INCORPORATION OF SEVER CLIMATE EFFECTS ON GROUND FAILURE SUSCEPTIBILITY.INTENDED BENEFICIARIES: INFORMATION GATHERED FROM THIS RESEARCH WILL PROVIDE PRACTICING ENGINEERS AS WELL AS DECISION-MAKERS AND OTHER STAKEHOLDERS WITH ROBUST TOOLS TO ASSESS AND MITIGATE THE RISK OF CYCLIC SOFTENING, SEISMIC DISPLACEMENTS, AND GROUND FAILURE UNDER MULTI-HAZARD CONDITIONS. THE OUTCOME OF THIS RESEARCH WILL BENEFIT THE PUBLIC BY IMPROVING THE SAFETY AND MINIMIZING THE DAMAGE AND DISRUPTION OF BUILDINGS AND INFRASTRUCTURE SYSTEMS CONSTRUCTED ON SOIL SUSCEPTIBLE TO LIQUEFACTION.SUBRECIPIENT ACTIVITIES: THE RECIPIENT DOES NOT INTEND TO SUBAWARD FUNDS.

Source notice

More from United States Department of Commerce posted in September 2024