<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/117650030854304419" -->

---
title: Amendment 0003 for 1.3B PACOM Bunkers Solicitation | Due Dec 4, 2026 - MatchAwards
description: Amendment 0003 for 1.3B PACOM Bunkers Solicitation. Defense Logistics Agency. Solicitation SPE608-27-R-0201-0003. NAICS 324110 - Petroleum Refineries. Deadline 2026-12-04. 1. This amendment is hereby executed to provide answers to questions from potential vendors. 2. The email address for the...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/117650030854304419
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Amendment 0003 for 1.3B PACOM Bunkers Solicitation | Due Dec 4, 2026
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/117650030854304419
og:description: Amendment 0003 for 1.3B PACOM Bunkers Solicitation. Defense Logistics Agency. Solicitation SPE608-27-R-0201-0003. NAICS 324110 - Petroleum Refineries. Deadline 2026-12-04. 1. This amendment is hereby executed to provide answers to questions from potential vendors. 2. The email address for the...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Amendment 0003 for 1.3B PACOM Bunkers Solicitation

Status

Open, responses due Dec 4, 2026

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

FORT BELVOIR, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

SPE608-27-R-0201-0003

NAICS

[324110 - Petroleum Refineries](/groups/340)

PSC

9130 - LIQUID PROPELLANTS AND FUELS, PETROLEUM BASE

Category

[Fuels (7.7)](/categories/transportation-and-logistics-services/fuels)

Posted

2026-11-20

Deadline

2026-12-04

Place of performance

Fort Belvoir, Virginia 22060, UNITED STATES

## Description

1\. This amendment is hereby executed to provide answers to questions from potential vendors.  
2\. The email address for the submission of proposals is changed from BunkersDDF@dla.mil to DDFBunkers@dla.mil.  
Questions and Answers Posted Below:  
//  
1.Item 0026 – Singapore: Please confirm the correct delivery port/location, as Attachment A incorrectly references  
South Korea.  
Answer: Port of Singapore, Singapore.  
2.Item 0012 – Lautoka, Fiji: Please confirm the minimum delivery quantity: 341 MT or 20 MT?  
Answer: Minimum delivery quantity is 20 MT.  
3.Item 0018 – Sattahip, Thailand: Please confirm the minimum delivery quantity: 100 MT or 20 MT?  
Answer: Minimum delivery quantity is 20 MT.  
4.Item 0011 – Laem Chabang, Thailand: Please confirm the minimum delivery quantity: 25 MT or 20 MT?  
Answer: Minimum delivery quantity is 20 MT.  
5.In Attachment A1 Schedule of Supplies, estimated quantities are indicated per line item number as a total quantity  
within the contract term of 3 years. Is DLA able to provide an estimated annual volume lifting or a committed annual  
volume range per year?  
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of  
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning  
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much  
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because  
the estimate was not met.  
6.As some taxes/fees vary based on percentage, is Offeror able to submit a price for 2027 and indicative numbers for  
the remainder of the term years to be revisited as the taxes/fees change?  
Answer: No. Potential vendors shall submit one price. This price shall escalate according to the Platts escalator to  
reflect market conditions.  
7.Given Majuro’s planned implementation of a new tax system in January 2027, may the Offeror submit its initial bid  
based on the current tax structure and revise its pricing once the new tax schedule in officially released?  
Answer: No. Potential vendors shall submit one price. This awarded price shall escalate according to the Platts  
escalator to reflect market conditions over the length of the contract period. A fixed-price contract with economic  
price adjustment. After-imposed taxes may be covered under FAR 52.229-6.  
8.In Attachment E, Delivery conditions 1.i, Offerors are required to provide “line handlers” for pipeline deliveries.  
Please clarify the specific responsibilities and scope of this requirement.  
Answer: Refers to personnel lifting the hose from the pipeline to the ship for delivery. This is part of the delivery  
process.  
9.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port?  
Answer: All deliveries are at port side. No anchorage deliveries.  
10.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate  
offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker  
barge/tanker, transit distance, travel time, and associated delivery costs.  
Answer: All deliveries are at port side. No anchorage deliveries.  
11.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA  
provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the  
approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier  
in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability.  
We understand that actual orders may vary and that any historical information would be for planning purposes only.  
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of  
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning  
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much  
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because  
the estimate was not met.  
12.Alternative Delivery Methods: Is barge delivery strictly mandatory for CLINs designated as such, or would DLA consider alternative methods, including shore-based pipeline delivery, direct fueling from terminal facilities, or  
truck-to-vessel bunkering while the receiving vessel is alongside a berth?  
Answer: Alternate delivery methods can be submitted.  
13.Operational Requirements: If alternative methods are permissible, would they need to meet specific pumping rates,  
metering, hose, safety, or vessel-access requirements?  
Answer: A pre-award survey shall determine if it is acceptable.  
14.Technical Acceptability: Would a supplier proposing an alternative delivery method remain technically acceptable,  
or would a formal solicitation amendment be required before such an offer could be considered?  
Answer: Our DLA Energy Quality shall make that determination. A formal amendment shall not be issued before an award  
is made on alternate delivery methods.  
15.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port?  
Answer: All deliveries are at port side. No anchorage deliveries.  
16.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate  
offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker  
barge/tanker, transit distance, travel time, and associated delivery costs.  
Answer: All deliveries are at port side. No anchorage deliveries.  
17.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA  
provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the  
approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier  
in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability.  
We understand that actual orders may vary and that any historical information would be for planning purposes only.  
Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of  
the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning  
purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much  
higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because  
the estimate was not met.  
18.Suva, Fiji – CLIN 0005  
a.The listed delivery method is ex Barge. There are no barges in Suva and the preferred delivery method is Ex  
Pipeline. Ex Truck is also available.  
b.Can you adjust the requested delivery method accordingly?  
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted  
based on what is available at a location as an exception to what was originally solicited.  
19.Lautoka, Fiji – CLIN 0012  
a.The listed delivery method is ex Barge. There are no barges in Lautoka, the only delivery method is Ex Truck.  
b.Can you adjust the requested delivery method accordingly?  
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted  
based on what is available at a location as an exception to what was originally solicited.  
20.Koror, Palau – CLIN 0008  
a.The listed delivery method is ex Barge. There are no barges in Palau and the preferred delivery method is Ex  
Pipeline. Ex Truck is also available.  
b.Can you adjust the requested delivery method accordingly?  
Answer: Vendors can state if the requested delivery mode is not available at a location. Proposals can be submitted  
based on what is available at a location as an exception to what was originally solicited.  
21.Are there any small business set-asides or preferences for this solicitation?  
Answer: This solicitation is unrestricted. It is open to all business types. No set-asides.  
End //  
3\. All other terms and conditions of Solicitation SPE608-27-R-0201 remained unchanged.

<!-- mobian-agent-ad sponsored="true" id="3d60ee1f-7879-4e6f-83ff-875c5d8b4f54" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/transportation-and-logistics-services/fuels?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/87d7f8f7a1324264923a206d075599fc/download)

## Contacts

* Joseph Teye-Kofi
* Kimberly Morgan

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/059daf672c20491ab94da847d649d079/view)

[More from Defense Logistics Agency posted in November 2026](/defense%5Flogistics%5Fagency%5Fdla/archive/2026-11)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Amendment 0003 for 1.3B PACOM Bunkers Solicitation","description":"1. This amendment is hereby executed to provide answers to questions from potential vendors. 2. The email address for the submission of proposals is changed from BunkersDDF@dla.mil to DDFBunkers@dla.mil. Questions and Answers Posted Below: // 1.Item 0026 – Singapore: Please confirm the correct delivery port/location, as Attachment A incorrectly references South Korea. Answer: Port of Singapore, Singapore. 2.Item 0012 – Lautoka, Fiji: Please confirm the minimum delivery quantity: 341 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 3.Item 0018 – Sattahip, Thailand: Please confirm the minimum delivery quantity: 100 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 4.Item 0011 – Laem Chabang, Thailand: Please confirm the minimum delivery quantity: 25 MT or 20 MT? Answer: Minimum delivery quantity is 20 MT. 5.In Attachment A1 Schedule of Supplies, estimated quantities are indicated per line item number as a total quantity within the contract term of 3 years. Is DLA able to provide an estimated annual volume lifting or a committed annual volume range per year? Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because the estimate was not met. 6.As some taxes/fees vary based on percentage, is Offeror able to submit a price for 2027 and indicative numbers for the remainder of the term years to be revisited as the taxes/fees change? Answer: No. Potential vendors shall submit one price. This price shall escalate according to the Platts escalator to reflect market conditions. 7.Given Majuro’s planned implementation of a new tax system in January 2027, may the Offeror submit its initial bid based on the current tax structure and revise its pricing once the new tax schedule in officially released? Answer: No. Potential vendors shall submit one price. This awarded price shall escalate according to the Platts escalator to reflect market conditions over the length of the contract period. A fixed-price contract with economic price adjustment. After-imposed taxes may be covered under FAR 52.229-6. 8.In Attachment E, Delivery conditions 1.i, Offerors are required to provide “line handlers” for pipeline deliveries. Please clarify the specific responsibilities and scope of this requirement. Answer: Refers to personnel lifting the hose from the pipeline to the ship for delivery. This is part of the delivery process. 9.Are vessels receiving fuel under this requirement expected or permitted to berth inside Cam Ranh Port? Answer: All deliveries are at port side. No anchorage deliveries. 10.If fueling may occur at anchorage outside the port, can DLA provide the anticipated anchorage area or approximate offshore distance from Cam Ranh Port? This information is needed to determine the appropriate fuel depot, bunker barge/tanker, transit distance, travel time, and associated delivery costs. Answer: All deliveries are at port side. No anchorage deliveries. 11.We understand the solicitation includes a 24-hour response/delivery requirement. For planning purposes, can DLA provide the anticipated order frequency or any available historical ordering pattern for Cam Ranh, such as the approximate number of deliveries per month or year or typical interval between orders? This would assist the supplier in determining appropriate fuel inventory, storage capacity, replenishment planning, and bunker-vessel availability. We understand that actual orders may vary and that any historical information would be for planning purposes only. Answer: In a requirements-type contract, the estimated quantity is a realistic projection or good faith estimate of the total supplies or services the buyer will need during the contract period. Therefore, it is basically for planning purposes and based on data. There is no guarantee and therefore, If the buyer's actual needs turn out to be much higher or lower than the estimate, the contractor generally cannot claim an equitable price adjustment just because the estimate was not met. 12.Alternative Delivery Methods: Is barge delivery strictly mandatory for CLINs designated as such, or would DLA consider alternative methods, including shore-based pipeline delivery, direct fueling from terminal facilities, or truck-to-vessel bunkering while the receiving vessel is alongside a berth? Answer: Alternate delivery methods can be submitted. 13.Operational Requirements: If alternative methods are permissible, would they need to meet specific pumping rates, metering, hose, safety, or vessel-access requirements? Answer: A pre-award survey shall determine if it is acceptable. 14.Technical Acceptability: Would a...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/117650030854304419","identifier":"SPE608-27-R-0201-0003","category":"324110 - Petroleum Refineries","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Open"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"9130 - LIQUID PROPELLANTS AND FUELS, PETROLEUM BASE"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"7.7 Fuels","url":"https://matchawards.com/categories/transportation-and-logistics-services/fuels"}],"availabilityStarts":"2026-11-20","availabilityEnds":"2026-12-04","validThrough":"2026-12-04T23:59:59-05:00","areaServed":"Fort Belvoir, Virginia 22060, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/059daf672c20491ab94da847d649d079/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

