<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/117467421257145982" -->

---
title: VALVE,SAFETY RELIEF (SPRMM126QGG52) – Defense Logistics Agency | Closed - MatchAwards
description: VALVE,SAFETY RELIEF. Defense Logistics Agency. Solicitation SPRMM126QGG52. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2026-11-16. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/117467421257145982
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: VALVE,SAFETY RELIEF (SPRMM126QGG52) – Defense Logistics Agency | Closed
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/117467421257145982
og:description: VALVE,SAFETY RELIEF. Defense Logistics Agency. Solicitation SPRMM126QGG52. NAICS 332919 - Other Metal Valve and Pipe Fitting Manufacturing. Deadline 2026-11-16. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# VALVE,SAFETY RELIEF

Status

Closed, the response deadline passed on Nov 16, 2026

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

SPRMM126QGG52

NAICS

[332919 - Other Metal Valve and Pipe Fitting Manufacturing](/groups/455)

PSC

4820 - VALVES, NONPOWERED

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Posted

2026-10-26

Deadline

2026-11-16

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|332919|750||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per clause WSSTERMMZ04 - Evaluation for Award (Lowest PricedTechnically Acceptable). This procurement requires Higher Level Inspection. 1\. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2\. Drawings or technical data are/are not available for this item. (Ifdrawings are available, include remark under "For Drawings")3\. Delivery days\_\_\_\_\_\_\_\_\_aro. 4\. Offer valid for \_\_\_\_\_ days. 5\. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6\. If you are not the manufacturer of the material you are offering, you MUST State who the Original Equipment Manufacturer (OEM) is �Commercial and Government Entity Code (CAGE) code� and the part number you are offering. IF PROPOSING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE TAKE NOTE TO THE TRACEABILITY REQUIREMENTS CITED IN CLAUSES DLATERMHZ01 IN THE SOLICITATION. REFURBISHED MATERIAL IS NOT ACCEPTABLE. 7\. Please provide an email address for follow up communications. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ 8\. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9\. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report through PIEE-WAWF. 10\. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11\. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ 12\. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. \\ 1\. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the VALVE,SAFETY RELIEF , part of the ;MK-91 MOD-3 (GMFCS) NATO; . 2\. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=2080073 |10001| B| |D|0001 | B|49998|0076931 DRAWING DATA=2080075 |10001| B| |D|0001 | B|49998|0090312 DRAWING DATA=2080076 |10001| B| |D|0001 | B|49998|0071424 DRAWING DATA=2468746 |10001| C| |D|0001 | C|49998|0037851 DRAWING DATA=2468746 |10001| C| |D|0002 | C|49998|0033878 DRAWING DATA=2468746 |10001| C| |D|0003 | C|49998|0029327 DRAWING DATA=2468746 |10001| C| |D|0004 | C|49998|0016497 DRAWING DATA=2888335 |10001| B| |D|0001 | B|49998|0073910 DRAWING DATA=2888335 |10001| B|PL |D|0001 | B|49998|0025126 DRAWING DATA=2888337 |10001| H| |F|0001 | H|49998|0086894 DRAWING DATA=2888338 |10001| D| |D|0001 | D|49998|0090955 DRAWING DATA=2888339 |10001| B| |D|0001 | B|49998|0077327 DRAWING DATA=2888343 |10001| B| |D|0001 | B|49998|0077923 DRAWING DATA=2888350 |10001| D| |D|0001 | D|49998|0089213 DRAWING DATA=2888350 |10001| D|PL |D|0001 | D|49998|0031890 DRAWING DATA=2888350 |10001| 1|QP |D|0000.COV | 1|49998|0025404 DRAWING DATA=2888350 |10001| 1|QP |D|0000.I | -|49998|0018616 DRAWING DATA=2888350 |10001| 1|QP |D|0000.II | 1|49998|0012645 DRAWING DATA=2888350 |10001| 1|QP |D|0000.III | -|49998|0009629 DRAWING DATA=2888350 |10001| 1|QP |D|0000.IV | -|49998|0015547 DRAWING DATA=2888350 |10001| 1|QP |D|0001 | 1|49998|0025390 DRAWING DATA=2888350 |10001| 1|QP |D|0002 | -|49998|0025596 DRAWING DATA=2888350 |10001| 1|QP |D|0003 | -|49998|0028083 DRAWING DATA=2888350 |10001| 1|QP |D|0004 | 1|49998|0021344 DRAWING DATA=2888350 |10001| 1|QP |D|0005 | 1|49998|0022532 DRAWING DATA=2888350 |10001| 1|QP |D|0006 | -|49998|0022042 DRAWING DATA=2888350 |10001| 1|QP |D|0007 | -|49998|0008224 DRAWING DATA=2888476 |10001| A| |D|0001 | A|49998|0046586 DRAWING DATA=2889758 |10001| A| |D|0001 | A|00000|0000000 DOCUMENT REF DATA=MIL-STD-105 | | |E |950227|A| | | DOCUMENT REF DATA=MIL-F-14072 | | |D |901004|A| | | DOCUMENT REF DATA=MS33649 | | |C |840802|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=ASTM-E1119 | | | |860725|A| | | DOCUMENT REF DATA=ASTM-D1193 | | | |910915|A| | | DOCUMENT REF DATA=MIL-STD-13231 | | | |991102|A| | | DOCUMENT REF DATA=ASTM-B139/B139M | | | |900223|A| | | DOCUMENT REF DATA=NASM20995 | | | |980430|A| | | DOCUMENT REF DATA=ASTM-A240/A240M | | | |940815|A| | | DOCUMENT REF DATA=SAE-AS28778 | | | |010301|A| | | DOCUMENT REF DATA=ASTM-A313/A313M | | | |921015|A| | | DOCUMENT REF DATA=NASM33540 | | | |980630|A| | | DOCUMENT REF DATA=ASME-B46.1 | | |85 |851205|A| | | DOCUMENT REF DATA=ASTM-A484/A484M | | | |920815|A| | | DOCUMENT REF DATA=SAE-AS5169 | | | |990928|A| | | DOCUMENT REF DATA=ANSI-Z540.1 | | | |940727|A| | | DOCUMENT REF DATA=ASTM-A580/A580M | | | |930215|A| | | DOCUMENT REF DATA=ASTM-A582/A582M | | | |930316|A| | | DOCUMENT REF DATA=DI-NDTI-80603 | | | |880601|A| | | DOCUMENT REF DATA=DI-NDTI-80809 | | |B |970124|A| | | DOCUMENT REF DATA=ASTM-A967 | | | |970331|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT CHANGE DATA=AN814 |SAE-AS5169 DOCUMENT CHANGE DATA=ISO8402 |ISO9000 DOCUMENT CHANGE DATA=ISO9002 |ISO9001 DOCUMENT CHANGE DATA=MIL-C-45662 |ANSI-Z540.1 DOCUMENT CHANGE DATA=MIL-E-9500 |ASTM-E1119 DOCUMENT CHANGE DATA=MIL-M-13231 |MIL-STD-13231 DOCUMENT CHANGE DATA=MIL-STD-10 |ASME-B46.1 DOCUMENT CHANGE DATA=MIL-STD-109 |ISO8402 DOCUMENT CHANGE DATA=MS20995 |NASM20995 DOCUMENT CHANGE DATA=MS27778 |SAE-AS28778 DOCUMENT CHANGE DATA=MS29512 |SAE-AS29512 DOCUMENT CHANGE DATA=MS33540 |NASM33540 DOCUMENT CHANGE DATA=QQ-B-750 |ASTM-B139 DOCUMENT CHANGE DATA=QQ-C-390 |UNS92200 DOCUMENT CHANGE DATA=QQ-P-35 |ASTM-A967 DOCUMENT CHANGE DATA=QQ-S-764 |ASTM-A582 & A484 DOCUMENT CHANGE DATA=QQ-S-766 |ASTM-A240 UNS30400 DOCUMENT CHANGE DATA=QQ-W-423 |ASTM-A313 & A580 DOCUMENT CHANGE DATA=2468655-1(10001) |2468746(10001) 3\. REQUIREMENTS 3.1 Manufacturing and Design - The VALVE,SAFETY RELIEF furnished under this contract/purchase order shall meet the material and physical requirements as specified ;0n drawing 2888350 cage 10001/w associated drawings and specs; . 3.2 Cage Code/Reference Number Items - The VALVE,SAFETY RELIEF furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage \_\_\_\_\_\_\_ ref. no. ;4J831 2888350 71905 2888350; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.4 First Article Test Procedures are required and must be approved prior to any First Article Testing. 3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.6 Production Lot Test Procedures are required. 3.7 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required. 3.8 Configuration Control in accordance with MIL-STD-973 Short Form procedures - The requirements of MIL-STD-973 are hereby invoked in the contract/purchase order. The tailoring notes stated in the order cited in paragraph 6.2.1.3 are stated below: A. Considered, tailoring implemented B. Automated processing and submittal is not required. Interactive access to digital data is not required. C. Configuration audits are not required. D. Contractor's configuration management plan is not requried. E. Configuration terminology development documentation is required. F. Only paragraphs 5.3.3.2, 5.3.6.4, 5.3.6.7, 5.3.6.7.3 are required. G. FCD is not required. H. ACD and PCD is not required. I. Not Applicable (NA) to this contract/purchase order. J. NA to this contract/purchase order. K. NA to this contract/purchase order. L. Paragraph 5.3.6 with the exception of paragraph 5.3.6.5 and 5.3.6.7.1 are required. M. Paragraph 5.3.6.6 and 5.3.6.6.2 are required. N. Paragraph 5.3.6.6.1 is not required unless specifically cited elsewhere in Section "C" of this contract/purchase order. O. The marking requirement is stated elsewhere in Section "C" of this contract/purchase order. P. Interface requirements are as specified on the drawings provided with this contract/purchase order or the primary equipment performance MIL-SPEC or STD cited in Section "C" of this contract/purchase order. Q. NA to this contract/purchase order. R. All Class I changes to either a Government owned Configuration Identification (CI) or baseline configuration shall be submitted to the Procurement Contracting Officer for review and subsequent approval - conditional approval or disapproval. NDI, COTS, and PDI items previously accepted by the Government shall be submitted as above. This process does not excuse the contractor from initially offering to the Government an item which meets the minimum technical and operational requirements set forth in this contract/ purchase order. S. Preliminary Change Notices and Advance Change Study Notices are not required. T. NA to this contract/purchase order. U. and V. Class II Engineering Change Proposal (ECP) may be carried through provided the Government QAR reviews and concurs with the classification review which resulted in the ECP being classified as Class II. W. Paragraph 5.4.3 is required. X. Paragraph 5.4.4 is required. Y. NORS are not required for this contract/purchase order. Z. Short Form procedures are allowed. AA. Paragraph 5.5.2 is not required for this contract/purchase order. AB. Paragraph 5.5.7 is not required for this contract/purchase order. AC. Paragraph 5.5.8 is not required for this contract/purchase order. AD. Paragraph 5.6.2 is not required for this contract/purchase order. AE. Paragarph 5.6.3 is not required for this contract/purchase order. AF. Paragraph 5.4.2.2.3.2b is not required for this contract/purchase order. 3.8.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788\. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 4\. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;non-destructive; First Article Test/Inspection on ;ONE (1); unit(s) in accordance with requirements ;in accordance with drawing 2888350 and QP2888350 and all associated drawings and specfications; . 4.5 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The 

<!-- mobian-agent-ad sponsored="true" id="e0d6c6cc-3cbc-4f56-a656-b6adf77f84c8" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/workspace/contract/opp/9391d9800ac34a84afb8488a2c8c39aa/view)

[More from Defense Logistics Agency posted in October 2026](/defense%5Flogistics%5Fagency%5Fdla/archive/2026-10)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"VALVE,SAFETY RELIEF","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|332919|750||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per clause WSSTERMMZ04 - Evaluation for Award (Lowest PricedTechnically Acceptable). This procurement requires Higher Level Inspection. 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be \"issued\" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein. 2. Drawings or technical data are/are not available for this item. (Ifdrawings are available, include remark under \"For Drawings\")3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection \u0026 Acceptance (I\u0026A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST State who the Original Equipment Manufacturer (OEM) is �Commercial and Government Entity Code (CAGE) code� and the part number you are offering. IF PROPOSING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE TAKE NOTE TO THE TRACEABILITY REQUIREMENTS CITED IN CLAUSES DLATERMHZ01 IN THE SOLICITATION. REFURBISHED MATERIAL IS NOT ACCEPTABLE. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE \u0026 ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE \u0026 ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/117467421257145982","identifier":"SPRMM126QGG52","category":"332919 - Other Metal Valve and Pipe Fitting Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4820 - VALVES, NONPOWERED"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2026-10-26","availabilityEnds":"2026-11-16","validThrough":"2026-11-16T23:59:59-05:00","sameAs":"https://sam.gov/workspace/contract/opp/9391d9800ac34a84afb8488a2c8c39aa/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

