<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/114078531467704475" -->

---
title: SHIPPING AND STORAG (SPRPA125REG55) – Defense Logistics Agency | Closed - MatchAwards
description: SHIPPING AND STORAG. Defense Logistics Agency. Solicitation SPRPA125REG55. NAICS 332439 - Other Metal Container Manufacturing. Deadline 2025-04-14. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|1 EA|365 DAYS AFTER FAT...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/114078531467704475
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: SHIPPING AND STORAG (SPRPA125REG55) – Defense Logistics Agency | Closed
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/114078531467704475
og:description: SHIPPING AND STORAG. Defense Logistics Agency. Solicitation SPRPA125REG55. NAICS 332439 - Other Metal Container Manufacturing. Deadline 2025-04-14. ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|1 EA|365 DAYS AFTER FAT...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# SHIPPING AND STORAG

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

PHILADELPHIA, USA

Notice type

Sources Sought

Solicitation number

SPRPA125REG55

NAICS

[332439 - Other Metal Container Manufacturing](/groups/442)

PSC

8145 - SPECIALIZED SHIPPING AND STORAGE CONTAINERS

Category

[Package Delivery & Packaging (7.1)](/categories/transportation-and-logistics-services/package-delivery-and-packaging)

Posted

2025-03-14

Deadline

2025-04-14

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|1 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| THIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITYIN ORDER TO MAINTAIN THE QUALITY OF THE PART. IF YOU HAVE NOT MANUFACTUREDTHIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME ANAPPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER TO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES. \\ 1\. SCOPE When discrepancies exist between the contract and the drawings contact the contracting officer listed on page 1 block 5 of the contract. 1.1 Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 Container shell material is ;ALUMINUM; . 1.3 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code ;N241.13 and contracting officer listed on page 1 block 5 of contract.; or code N241.10 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corp; drawing number ( ;05259; ) ;609E001; , Revision ;latest; and all details and specifications referenced therein. 1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS DRAWING DATA=STD-147 |05259| | |D| | | | DRAWING DATA=STD-224 |05259| | |D| | | | DRAWING DATA=STD-225 |05259| | |D| | | | DRAWING DATA=STD-245 |05259| | |D| | | | DRAWING DATA=STD-251 |05259| | |D| | | | DRAWING DATA=STD-265 |05259| | |D| | | | DRAWING DATA=STD-283 |05259| | |D| | | | DRAWING DATA=13C057 |05259| | |D| | | | DRAWING DATA=13C058 |05259| | |D| | | | DRAWING DATA=13C060 |05259| | |D| | | | DRAWING DATA=13D056 |05259| | |D| | | | DRAWING DATA=15930 |80132| C| |D| | | | DRAWING DATA=17D043 |05259| | |D| | | | DRAWING DATA=17D058 |05259| | |D| | | | DRAWING DATA=20D002 |05259| | |D| | | | DRAWING DATA=609C006 |05259| | |D| | | | DRAWING DATA=609C007 |05259| | |D| | | | DRAWING DATA=609E001 |05259| | |D| | | | DRAWING DATA=609E002 |05259| | |D| | | | DRAWING DATA=609E003 |05259| | |D| | | | DRAWING DATA=609E004 |05259| | |D| | | | DRAWING DATA=609E005 |05259| | |D| | | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | 3\. REQUIREMENTS 3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. Welding and welder qualifications shall meet current AWS D1.2 standards. Additionally, cleaning preparations shall be in accordance with MIL-C-5541and the cleaning paragraph located in the welding requirement section ofthe contract. 3.2 Reference to Cadmium plating shall be deleted and the following substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." 3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission of Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;NO OTHER MOUNT; is an approved alternate mount. 3.4 Surface Finishing. All containers shall be glass bead blasted on exterior surfaces only to provide a uniform matte finish that will hide minor surface imperfections, such as scratches, weld irregularities, etc. Size #8 glass beads per MIL-G-9954 shall be used with direct air pressure ranging from 50 to 70 PSIG. A Separator shall be used to provide a reclaim efficiency of 90%, i.e., a minimum of 90% by weight of the original sized material shall be in the reclaim. The glass bead media shall be maintained in a condition free from contamination with other metals, i.e., The media shall not have been used to blast equipment containing other metals or alloys. 3.5 WELDING. (Aluminum). Proper controls shall be used to prevent melt through or burn through. Welder qualification shall be to MIL-STD-1595A. Filler for welding 6061 alloy shall be 4043\. Filler for welding 5000 series alloys to themselves or to 6061 shall be 5356 or 5556\. Welding and weld inspection shall be in accordance with MIL-W-22248, Class 4, except that: (A) visual inspection shall include 5X (5 power) magnification when a suspect condition is to be examined beyond the capability of normal vision. (B) critical and major welds may be subjected to further non-destructive testing (such as dye penetrant inspection) as prescribed by the buying activity. 3.6 WORK INSTRUCTIONS. Work instructions shall be posted at the operator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate. 3.7 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, conform to the applicable physical, chemical and other technical requirements (supplier's certification is sufficient). 3.8 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding. 3.9 CLEANING. Parts to be welded shall be chemically cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used. 3.10 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days, to account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films. 3.10.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide solutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site, or ending at any closer adjacent edge. 3.10.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include stainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum alloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath. 3.11 At faying surfaces, discontinuous welds, or other areas where atmospheric liquids may be retained by capillary action, the crevice shall be sealed using Sealing Compound MIL-S-81733 or equivalent. THE CONTRACTOR SHALL INCLUDE A COPY OF THE DRAWINGS, CONTRACT, APPROVED ECO'S, DEVIATIONS, WAIVERS, AND ANY MODIFICATIONS IN THE RECORDS RECEPTACLE OF THE FIRST ARTICLE CONTAINER. THESE DOCUMENTS WILL ASSIST TEST PERSONNEL IN EXPEDITING THE FIRST ARTICLE INSPECTION.. All containers must be affixed with a nameplate that includes a Unique Identification (UID) marking as referenced in the drawing package Drawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor shall contact NAVICP code ;N241.13; or code 0771.10 for the alphanumeric sequential serial number group that makes up part of the UID. The UIDwill be included on the nameplate in data matrix format. Contact code ;N241.13; or code N241.10 to arrange for First Article Test location When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. 3.12 Welding and welder qualifications shall be in accordance with AWS D1.1 for steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3 for sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys to themselves or to 6061 shall be 5356 or 5556\. In addition,welding and weld inspection shall include: (1) Visual inspection shall include 5X (5power) magnification when a suspect condition is to be examined beyond the capability of normal vision. (2) Critical and major welds may be subjected to further non destructive testing (such as dye penetrant inspection)as prescribed by the buying activity. (3) Proper documentation shall be available for review by Government personnel. 3.13 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate. 3.14 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical requirements (supplier's certification is sufficient). 3.15 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding. 3.16 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used. 3.17 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days, to account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films. 3.17.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide solutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site, or ending at any closer adjacent edge. 3.17.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include stainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum alloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath. Welding and welder qualifications shall meet current AWS D1.2 standards. Additionally, cleaning preperations shall be in accordance with MIL-C-5541 and the cleaning paragraph located in the welding requirements section of the contract 4\. QUALITY ASSURANCE When a first article is required the contractor shall submit a copy of the drawings, contracts and approved ECO's, deviations, waivers and mods in the records receptacle of the first article container. welding and welder qualifications shall meet current AWS D1.1 and AWS D1.3,and in the case of stainless steel, AWS D1.6 standards. For Aluminum;Welding and welder qualifications shall meet current AWS D1.2 standards.Additionally, cleaning preparations shall be in accordance with MIL-C-5541and the cleaning paragraph located in the welding requirement section of thecontract. Contact contracting officer listed on page 1 block 5 of the contract for test facility location. ALL COSTS AND RESPONSIBILITIES RELATED TO THE FIRST ARTICLE TEST SUBMISSION CONTAINER SHIPMENT TO AND FROM THE FIRST ARTICLE TEST FACILITY ARE TO BE BORNE BY THE CONTRACTOR 4.1 PAINTING OF CONTAINER INTERIOR STEEL SURFACES. Steel surfaces (excluding stainless steel) shall be cleaned and pretreated for painting in accordance with TT-C-490 (salt spray test requirements excluded). Paint coating shall consist of 2 coats of primer in accordance with MIL-P-53022, MIL-P-53030, TT-P-664, or MIL-E-52891B. The total paint thickness shall be 1.5 mils (0.015 inches) minimum. To comply with ozone depleting substance regulation, whenever cleaning in accordance with TT-C-490 is required, the use of Trichlorethylene (MIL-T-81533) is deleted. 4.2 100% PRODUCTION LEAK TEST. Each container, uninstrumented and without dummy load, shall be raised to a height of 18 inches and allowed to fall freely to a concrete or similarly hard surface, landing flat on its base. The container shall then be prepared for testing by sealing all breathing devices and inserting suitable pressurized fittings and gauges. The container shall be closed and sealed in a normal manner. The pneumatic-pressure technique of method 5009 of Federal Test Method Standard No. 101C shall be used to detect leakage. An initial pressure setting equal to 1.0 + 0.1 - 0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of 0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection. WARNING Container may explode or fasteners may fail during test. Use protective barriers to avoid injury to personnel. 4.3 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below. 4.3.1 Dimensional test (special) ;to drawing (05259) 609E001 and sub-drawings is applicable; 4.3.2 Requirements of: ;to drawing (05259) 609E001 and sub-drawings is applicable; 4.3.3 Form: ;applies; 4.3.4 Fit: ;applies; 4.3.5 Function ;per 100% production leak test IAW drawing specifications; 4.3.6 Compliance with drawing ( ;05259; ) ;609E001; , Revision ;latest; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract requirements requirements. 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during testing. 4.6 The cost of the Government testing effort set forth in this solicitation is estimated to be $ ;10,000; for the first article testing. This cost factor will be added, for solicitation purposes, to the price of all offerors for whom the government will require such testing. 4.7 Disposition of FAT samples 4.7.1 ;zero; Sample(s) shall not be returned to the contractor because they shall be destroyed during testing. 4.7.2 ;All; Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval from the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. ;N/A; Sample(s) shall be returned to the contractor but shall not be considered as production due. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative. 4.9 FAT Approval Criteria 4.9.1 FAR 52.209-4 applies (A) The contractors shall deliver ;one (1); ; unit(s) of the following CAGE ( ;05259; ; ) Part Number ;609E001; ; , Revision ;latest; ; within ;120; ; calendar days from the date of this contract to the Government at ; TEST FACILITY ADDRESSES Naval Air Warfare Center Aircraft Division Highway 547, Building 678 Lakehurst, NJ 08733 NSWC Indian Head Division, Detachment Picatinny Building 458, Whittemore Ave. Picatinny Arsenal, NJ 07806-5000; ; Marking of test sample(s) shipping container shall be as follows, citing this contract number: "FOR FIRST ARTICLE TESTING. NOT RFI MATERIAL. DO NOT TAKE UP IN STOCK CONTRACT NUMBER:\_\_\_\_\_\_\_\_\_\_\_\_" For First Article Test, the shipping documentation shall contain this contract number and lot/item identification. The characteristics that the First Article must meet and the testing requirements are specified elsewhere in this contract. (B) Upon shipment of First Article sample(s), two (2) copies of the Material Inspection and Receiving Report (DD Form 250) bearing the QAR's signature and indication of preliminary inspection shall be forwarded to the NAVICP- Philadelphia code cited in Block 10.a of SF33, with duplicate copies to NAVICP code 072 and to the designated test facility. The envelopes shall be clearly marked: "DO NOT OPEN IN MAIL ROOM". Within ;60; ; days after receipt of the samples, the test site shall co 

<!-- mobian-agent-ad sponsored="true" id="d1d5471b-0a3d-4471-80ff-8dbad3101cd4" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/transportation-and-logistics-services/package-delivery-and-packaging?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/ab3a61aa217a4fd79360541ea1cc23fd/view)

[More from Defense Logistics Agency posted in February 2025](/defense%5Flogistics%5Fagency%5Fdla/archive/2025-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"SHIPPING AND STORAG","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|1 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| THIS ITEM REQUIRES ENGINEERING SOURCE APPROVAL BY THE DESIGN ACTIVITYIN ORDER TO MAINTAIN THE QUALITY OF THE PART. IF YOU HAVE NOT MANUFACTUREDTHIS ITEMBEFORE FOR DLA AVIATION PHILADELPHIA AND WANT TO BECOME ANAPPROVED SOURCE OFSUPPLY, PLEASE CONTACT THE BUYER TO INQUIRE ABOUT SOURCE APPROVAL REQUESTPROCEDURES. \\ 1. SCOPE When discrepancies exist between the contract and the drawings contact the contracting officer listed on page 1 block 5 of the contract. 1.1 Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 Container shell material is ;ALUMINUM; . 1.3 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code ;N241.13 and contracting officer listed on page 1 block 5 of contract.; or code N241.10 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Container Research Corp; drawing number ( ;05259; ) ;609E001; , Revision ;latest; and all details and specifications referenced therein. 1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=STD-147 |05259| | |D| | | | DRAWING DATA=STD-224 |05259| | |D| | | | DRAWING DATA=STD-225 |05259| | |D| | | | DRAWING DATA=STD-245 |05259| | |D| | | | DRAWING DATA=STD-251 |05259| | |D| | | | DRAWING DATA=STD-265 |05259| | |D| | | | DRAWING DATA=STD-283 |05259| | |D| | | | DRAWING DATA=13C057 |05259| | |D| | | | DRAWING DATA=13C058 |05259| | |D| | | | DRAWING DATA=13C060 |05259| | |D| | | | DRAWING DATA=13D056 |05259| | |D| | | | DRAWING DATA=15930 |80132| C| |D| | | | DRAWING DATA=17D043 |05259| | |D| | | | DRAWING DATA=17D058 |05259| | |D| | | | DRAWING DATA=20D002 |05259| | |D| | | | DRAWING DATA=609C006 |05259| | |D| | | | DRAWING DATA=609C007 |05259| | |D| | | | DRAWING DATA=609E001 |05259| | |D| | | | DRAWING DATA=609E002 |05259| | |D| | | | DRAWING DATA=609E003 |05259| | |D| | | | DRAWING DATA=609E004 |05259| | |D| | | | DRAWING DATA=609E005 |05259| | |D| | | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | 3. REQUIREMENTS 3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. Welding and welder qualifications shall meet current AWS D1.2 standards. Additionally, cleaning preparations shall be in accordance with MIL-C-5541and the cleaning paragraph located in the welding requirement section ofthe contract. 3.2 Reference to Cadmium plating shall be deleted and the following substituted: \"Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3.\" 3.3 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/114078531467704475","identifier":"SPRPA125REG55","category":"332439 - Other Metal Container Manufacturing","additionalProperty":[{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"8145 - SPECIALIZED SHIPPING AND STORAGE CONTAINERS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"7.1 Package Delivery \u0026 Packaging","url":"https://matchawards.com/categories/transportation-and-logistics-services/package-delivery-and-packaging"}],"availabilityStarts":"2025-03-14","availabilityEnds":"2025-04-14","sameAs":"https://sam.gov/opp/ab3a61aa217a4fd79360541ea1cc23fd/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

