SEAL,PLAIN ENCASED
- Status
- Closed (archived notice)
- Agency
- Defense Logistics Agency
- Office
- MECHANICSBURG, USA
- Notice type
- Solicitation
- Solicitation number
- SPRMM122QWM45
- NAICS
- 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC group
- 99 - MISCELLANEOUS
- Posted
- 2022-06-02
- Deadline
- 2022-07-05
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVIOICE and RECEIVING REPORT|N/A|TBA|SPRMM1|TBA|TBA|TBA|TBA|TBA|TBA|TBA|||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|X|X|X|||X|||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|339991|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. No drawings or technical data are available for this item. 3. RFID is only required if the Ship To code identified above is listed at the website with DFARS 252.211-7006 PASSIVE RFID, as the time of shipment.Currently, there are no locations listed that require passive RFID tagging. 4. Required Delivery is _____ days. 5. Delivery days_________aro. 6. Offer valid for _____ days. 7. Notice to surplus/new surplus/new manufactured surplus suppliers: Submission of your quote without a surplus certificate will null and void your quote. A surplus material certificate must accompany all quotes for surplus/new surplus/new manufactured. If submitting quote via EDI, a faxed or scanned copy must be sent to the buyer. 8. When submitting quotes via EDI, make sure you specify any exceptions (i.e. Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 9. If supplies will be packaged at a location different from the offeror address, the offeror shall provide the name and street address of the packaging facility. Inspection of material will be at: ______________________________________________________________ 10. If you are not the manufacturer of the material you are offering, you muststate who the OEM is (cage code) and the part number you are offering. 11. Please provide an email address for follow up communications. ____________________________________________________________ It is recommended that vendors register with the Navy Electronic Commerce Online (NECO) at https://www.neco.navy.mil to receive automated notifications from NECO when solicitations/amendments and contracts/modifications are issued by DLA Maritime Mechanicsburg and posted to EDA. Contractors can view their orders, contracts and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Procurement Integrated Enterprise Environment (PIEE) website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronicsubmittal of Receiving Report and Invoices through PIEE-WAWF. This procurement requires Higher Level Inspection. Drawings for this solicitation will be accessed via the website, www.SAM.gov.Click the Search button and type the solicitation number in the box and hitenter. Links to the solicitation should follow on the right. Click the BLUELINK with the name of the item that is identified as the "UpdatedSolicitation". Click to the left on "Attachments/Links" which will take you tothe link to request access to the drawings. Drawing access request should besubmitted by the Data Custodian listed on your approved DD2345. Only the Data C Custodian will be granted access to the controlled drawings. If there are problems accessing the drawings, please contact the buyer POC listed on this solicitation. \ 1. SCOPE 1.1 ;This procurement specification contains the reqirements for manufacture and the contract quality requirements for Seal Plain, Encased for use on Navy Submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=6878818 |53711| B| |D|0001 | B|49998|0043129 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | | |A| | | DOCUMENT REF DATA=ISO 9001 | | | |150915|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |961001|A| 2| | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=ADIPRENE L-100 (COML) | | | | |A| | | 3. REQUIREMENTS 3.1 ;The applicable part number is 6878818-2; 3.2 ;Design and Manufacturing - The Seal Plain, Encased furnished under this contract/purchase order shall meet the material, physical and mechanical requirements as specified on Drawing 6878818, Dash-2 including associated specifications mentioned in this procurement.; 3.2.1 ;The Seal Plain, Encased shall be supplied with no fillers, color additives, coatings or finishes as specified on Drawing 6878818, Note4.; 3.3 ;Marking Requirements - The supplier shall mark bag each first article and production lot unit Seal Plain, Encased in accordance with Drawing 6878818, Note 7 including with contract, lot or batch and serial number per MIL-STD-130.; 3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The article testing/inspection procedure and approval are required for the Seal Plain, Encased. Government approval is required prior to commencement of first article unit.; 3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-5083, by email matthew.ogilvie@navy.mil Code 242MO after award of contract.; 3.5.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT Acceptor DODACC is N64498.; 3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9002 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract.CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110; 4.5 ;Material Control - The supplier shall have an effective material control system that provides for certified industrial laboratory analysis by lot or batch for raw material ordered for first article and production lot units.The analysis shall establish the properties for the non-metallic material as specified on Drawing 6878818, Note 4.; 4.6 ;First Article Testing/Inspection. (Supplier Testing/Inspection) The supplier shall perform first article testing/ inspection on the Seal Plain, Encasedin accordance with the applicable drawing and their approved first article procedure.; 4.6.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.7 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The Supplier shall prepare and submit their First Article Testing/Inspection Procedure for Seal Plain, Encased in accordance with the requirements of DI-NDTI-80603 and the applicable drawing as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROC per DI-NDTI-80603A; 4.8 ;First Article Visual/Dimensional Inspection - The Supplier shall visually and physically inspect 100% the first article unit and record the actual measurements and results of each dimension including hardness identified on the applicable drawing.; 4.9 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the first article unit, testing/inspection reports in compliance with the requirements of DI-NDTI-80603 and the applicable drawing. The report shall also include a copy of Certified Industrial Laboratory Analysis for Adiprene L-100 Material and Visual/Dimensional Inspection Report identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first articletesting/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.10 ;Production Lot.; 4.10.1 ;Visual/Dimensional Inspection - The supplier shall visually and Physical inspect 100% the first article unit and record the actual measurements of each dimension identified on the applicable drawing including hardness identified on the applicable drawing. ; 4.10.2 ;Production Lot Testing/Inspection Reports and Acceptance - (Supplier Testing/ Inspection). The supplier shall submit for the completed production units testing/inspection reports in compliance with the applicable Data Item Descriptions (DIDs) and drawing. The Production Lot Testing/Inspection report shall consist of Certified Industrial Laboratory Analysis for Adiprene L-100 Material; Visual/Dimensional Inspection Report and Mercury Exclusion Certification indetified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of productionlot units. CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.11 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior toshipment of production units.; 4.12 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or NSWCPD will be performing the required Inspections/ Test. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.13 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of raw material and finished parts. Records shall be traceable by drawing/part, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.13.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/part, lot or batch, Contract format is acceptable for the below listed CDRLs. a. Certified Industrial Laboratory Analysis for Adiprene L-100 Material. (The analysis shall establish the properties for material as specified on Drawing 6878818, Note 4.). CDRLMore from Defense Logistics Agency posted in June 2022