<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/105661543262147428" -->

---
title: 59--CIRCUIT CARD ASSEMB (SPRMM121QHA94) | Closed - MatchAwards
description: 59--CIRCUIT CARD ASSEMB. Defense Logistics Agency. Solicitation SPRMM121QHA94. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2021-02-01. ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| ||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/105661543262147428
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 59--CIRCUIT CARD ASSEMB (SPRMM121QHA94) | Closed
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/105661543262147428
og:description: 59--CIRCUIT CARD ASSEMB. Defense Logistics Agency. Solicitation SPRMM121QHA94. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2021-02-01. ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| ||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 59--CIRCUIT CARD ASSEMB

Status

Closed (archived notice)

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

SPRMM121QHA94

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

5998 - ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE

Posted

2021-02-02

Deadline

2021-02-01

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| ||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE & RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2020)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2001))|4||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|334412|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by fax, or sent by other electronic commerce methods, such as e-mail. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. IN ACCORDANCE WITH DFAR 217.7301, CONTRACTORS SHALL IDENTIFY THEIR SOURCES OF SUPPLY IN CONTRACTS FOR SUPPLIES. IF THE ITEM CURRENTLY BEING PROCURED IS A NON-VALUE ADDED ITEM, PLEASE PROVIDE: ACTUAL MANUFACTURER: CAGE CODE: ADDRESS: CONTRACT DISTRIBUTION: It is recommended that vendors provide contact information to NAVSUP WSS Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts / modifications are issued by DLA Maritime Mechanicsburg and posted on EDA. To receive these notifications, contact: NAVSUP WSS Code 025, Procurement Systems Design and Contract Support Division via email at NAVSUPWSSITIMPHelpDesk@navy.mil. Please include the following information with your request: CAGE code, company name and address and POC with phone number and e-mail address. PRICING FOR REQUEST FOR QUOTATION IS VALID 60 DAYS AFTER THE CLOSING DATE OF THE REQUEST FOR QUOTATION UNLESS OTHERWISE SPECIFIED. PLEASE SPECIFY (IF OTHER THAN 60 DAYS) \_\_\_\_\_\_\_\_\_\_\_\_ DAYS AFTER THE CLOSING DATE OF THE RFQ. Contractors can view their orders, contracts, and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Wide Area Workflow (WAWF) website. It is recommended that contractors register for EDA at: https://wawf.eb.mil/. Click on New User and Registration. This procurement is issued under Special Emergency Procurement Authority (SEPA), FAR 5.202(a)(2). 1\. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB , part of the ;MK200 MOD0 CONTROL DIRECTOR OF THE AEGIS SYSTEM; . 1.2 Master Phototools (Artwork) - the government cannot provide the Stable Base Master Phototools (Artwork). The contractor is required to acquire or develop the Stable Base Master Phototools (Artwork) for manufacture of the CIRCUIT CARD ASSEMB . 2\. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2 ;OD40765 is called out as a method to be used for the cleaning of printed circuit cards. This is an old and somewhat outdated publication. The vendor is authorized to use a more current method of cleaning the circuit cards. The OD40765 may be used as a reference. Method to be approved by the QAR.; 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 The "Document Changes" section provides supersessions/changes to referenced documents. 2.3 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=ESS001 |63394| | |C| | | | DRAWING DATA=OD15268 |10001| 1| |C| | | | DRAWING DATA=WS10010 |10001| K| |D| | | | DRAWING DATA=WS10152 |10001| L| |C| | | | DRAWING DATA=WS10298 |10001| | |C| | | | DRAWING DATA=10300 |10001|00|WS |C| | | | DRAWING DATA=10308 |10001| A|WS |C| | | | DRAWING DATA=2157703 |10001| B| |C| | | | DRAWING DATA=2230116 |10001| K| |C| | | | DRAWING DATA=2296395 |10001| G| |C| | | | DRAWING DATA=2465224 |10001| G| |C| | | | DRAWING DATA=2673225 |10001| B| |C| | | | DRAWING DATA=2907778 |10001| B| |C| | | | DRAWING DATA=2907795 |10001| D| |C| | | | DRAWING DATA=2907797 |10001| D| |C| | | | DRAWING DATA=2910198 |10001| E| |C| | | | DRAWING DATA=2910230 |10001| V| |D| | | | DRAWING DATA=2910372 |10001| L| |C| | | | DRAWING DATA=2914260 |10001| F| |C| | | | DRAWING DATA=2914414 |10001| D| |C| | | | DRAWING DATA=3161082 |10001| J| |C| | | | DRAWING DATA=5365815 |53711| F| |C| | | | DRAWING DATA=5860277 |53711| H| |D| | | | DRAWING DATA=5860277 |53711| H|PL |D| | | | DRAWING DATA=5974760 |53711| C| |C| | | | DRAWING DATA=5974803 |53711| E|TR |C| | | | DOCUMENT REF DATA=A-A-113 | | |D |000502|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |R |190927|A| |03| DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MMM-A-134 | | | |100114|A| 1| | |Y|10 |970528 DOCUMENT REF DATA=MIL-STD-167 |0001| |A |051102|A| | | DOCUMENT REF DATA=MIL-STD-167 |0002| |A |920521|F| | | DOCUMENT REF DATA=QQ-A-200 | | | |980630|A| 1| | DOCUMENT REF DATA=MIL-STD-202 | | |H |150418|A| |01| DOCUMENT REF DATA=QQ-A-250 | | | |980630|A| | | DOCUMENT REF DATA=QQ-A-250 |0008| | |170126|A| | | DOCUMENT REF DATA=QQ-N-290 | | |A |010503|A| | | DOCUMENT REF DATA=QQ-S-763 | | |F |981005|A| | | DOCUMENT REF DATA=MIL-STD-810 | | |H |190131|A| |03| DOCUMENT REF DATA=MIL-STD-883 | | |L |190916|A| | | DOCUMENT REF DATA=MIL-STD-1285 | | |D |190708|A| | | DOCUMENT REF DATA=MIL-STD-1686 | | |C |951025|A| | |N DOCUMENT REF DATA=DOD-STD-2101 | | | |790510|A| | | DOCUMENT REF DATA=MS3197 | | |G |971231|A| | | DOCUMENT REF DATA=MIL-A-8625 | | |F |190828|A| 1| |N DOCUMENT REF DATA=MIL-F-18870 | | |E |860523|A| 1| | DOCUMENT REF DATA=MIL-M-38510 | | |J |930827|A| 1| | |Y|94 |930915 DOCUMENT REF DATA=MIL-C-39012 |0124| |A |970917|A| | | DOCUMENT REF DATA=DI-NDTI-80603 | | | |061114|A| | | DOCUMENT REF DATA=DI-NDTI-80809 | | |B |140827|A| | | DOCUMENT REF DATA=ASTM-B121 | | |86 |910523|A| | | DOCUMENT REF DATA=ASTM-B194 | | | |921115|A| | |N DOCUMENT REF DATA=MIL-PRF-19500 | | |P |180518|A| | | |Y|135|960131 DOCUMENT REF DATA=MIL-I-24768 | | | |921208|A| 2| |1 DOCUMENT REF DATA=MIL-I-24768 |0002| | |921208|A| 1| | DOCUMENT REF DATA=MIL-I-24768 |0003| | |921208|A| 1| | DOCUMENT REF DATA=ASTM-D3295 | | | |910415|A| | | DOCUMENT REF DATA=ASTM-B36/B36M | | | |910222|A| | | DOCUMENT REF DATA=MIL-PRF-39003 | | |N |170911|A| | |1 |Y|92 |080429 DOCUMENT REF DATA=MIL-PRF-39003 |0001| |N |170911|A| | | DOCUMENT REF DATA=ASTM-D4066 | | | |140304|A| | |N DOCUMENT CHANGE DATA=L-P-403 |ASTM-D1457 DOCUMENT CHANGE DATA=MIL-C-39003/01 |MIL-PRF-39003/01 DOCUMENT CHANGE DATA=MIL-E-16400 |MIL-STD-2036 DOCUMENT CHANGE DATA=MIL-J-6751 |MIL-J-39024/10 DOCUMENT CHANGE DATA=MIL-M-20693 |ASTM-D4066 DOCUMENT CHANGE DATA=MIL-P-13949/4 |MIL-S-13949/4 DOCUMENT CHANGE DATA=MIL-P-18177 |MIL-I-24768/2 & MIL-I-24768/3 DOCUMENT CHANGE DATA=MIL-P-28809 |CANCELLED W/O REPLACEMENT DOCUMENT CHANGE DATA=MIL-S-19500 |MIL-PRF-19500 DOCUMENT CHANGE DATA=MIL-STD-105 |ANSI-Z1.4 DOCUMENT CHANGE DATA=NAVMAT P-9492 |ESS001 DOCUMENT CHANGE DATA=NAVSEA NOTE 3900 |ESS001 DOCUMENT CHANGE DATA=OD 36698 |MIL-STD-1665 DOCUMENT CHANGE DATA=OD40765 |USE CURRENT CLEANING METHOD DOCUMENT CHANGE DATA=QQ-B-613 |ASTM-B36 & ASTM-B121 DOCUMENT CHANGE DATA=QQ-C-533 |ASTM-B194 DOCUMENT CHANGE DATA=WR43A |DOD-STD-2101 DOCUMENT CHANGE DATA=WS10011 |MIL-STD-2000 3\. REQUIREMENTS 3.1 Manufacturing and Design - The CIRCUIT CARD ASSEMB furnished under this contract/purchase order shall meet the material and physical requirements as specified ;for functional item number 5860277-1 ; . 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130\. 3.3 Serialization - The supplier shall mark a serial number on each CIRCUIT CARD ASSEMB in accordance with ;5860277; . Actual serial numbers will be assigned ;by the contractor; . 3.4 Environmental Stress Screening (ESS) - Environmental Stress Screening shall be in accordance with ;5860277, 5974803TR and ESS001; . 3.5 Environmental Stress Screening (ESS) Special Marking Requirement - Unit(s) which have passed the ESS test shall be identified by the special marking "SS, MM, YY" (SS = Stress Screening, MM = Month, YY = Year). The marking shall be located near the part number marking, but distinguishable from the part number. 3.6 Environmental Stress Screening (ESS) - Environmental Stress Screening shall be in accordance with approved ESS procedures. 3.7 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in MIL-STD-1686\. 3.8 First Article Test Procedures are required and must be approved prior to any First Article Testing. 3.9 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.10 Qualification Requirements - This item contains components that must be manufactured by a Government Qualified Products List (QPL) supplier. 3.11 Configuration Control in accordance with MIL-STD-973 Short Form procedures - The requirements of MIL-STD-973 are hereby invoked in the contract/purchase order. The tailoring notes stated in the order cited in paragraph 6.2.1.3 are stated below: A. Considered, tailoring implemented B. Automated processing and submittal is not required. Interactive access to digital data is not required. C. Configuration audits are not required. D. Contractor's configuration management plan is not requried. E. Configuration terminology development documentation is required. F. Only paragraphs 5.3.3.2, 5.3.6.4, 5.3.6.7, 5.3.6.7.3 are required. G. FCD is not required. H. ACD and PCD is not required. I. Not Applicable (NA) to this contract/purchase order. J. NA to this contract/purchase order. K. NA to this contract/purchase order. L. Paragraph 5.3.6 with the exception of paragraph 5.3.6.5 and 5.3.6.7.1 are required. M. Paragraph 5.3.6.6 and 5.3.6.6.2 are required. N. Paragraph 5.3.6.6.1 is not required unless specifically cited elsewhere in Section "C" of this contract/purchase order. O. The marking requirement is stated elsewhere in Section "C" of this contract/purchase order. P. Interface requirements are as specified on the drawings provided with this contract/purchase order or the primary equipment performance MIL-SPEC or STD cited in Section "C" of this contract/purchase order. Q. NA to this contract/purchase order. R. All Class I changes to either a Government owned Configuration Identification (CI) or baseline configuration shall be submitted to the Procurement Contracting Officer for review and subsequent approval - conditional approval or disapproval. NDI, COTS, and PDI items previously accepted by the Government shall be submitted as above. This process does not excuse the contractor from initially offering to the Government an item which meets the minimum technical and operational requirements set forth in this contract/ purchase order. S. Preliminary Change Notices and Advance Change Study Notices are not required. T. NA to this contract/purchase order. U. and V. Class II Engineering Change Proposal (ECP) may be carried through provided the Government QAR reviews and concurs with the classification review which resulted in the ECP being classified as Class II. W. Paragraph 5.4.3 is required. X. Paragraph 5.4.4 is required. Y. NORS are not required for this contract/purchase order. Z. Short Form procedures are allowed. AA. Paragraph 5.5.2 is not required for this contract/purchase order. AB. Paragraph 5.5.7 is not required for this contract/purchase order. AC. Paragraph 5.5.8 is not required for this contract/purchase order. AD. Paragraph 5.6.2 is not required for this contract/purchase order. AE. Paragarph 5.6.3 is not required for this contract/purchase order. AF. Paragraph 5.4.2.2.3.2b is not required for this contract/purchase order. 3.11.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788\. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.12 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected. As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation. Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request. Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part. Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.) 4\. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The test procedures shall be approved prior to production. There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure previously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.5 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;nondestructive; First Article Test/Inspection on ;1; unit(s) in accordance with requirements ;on 5860277 and 5974803TR; . 4.6 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 4.7 Environmental Stress Screening (ESS) (Contractor) - The Contractor shall conduct Environmental Stress Screening on ;1; unit(s) in accordance with the requirements of ;5860277,5974803TR and ESS001; . 4.8 Environmental Stress Screening (ESS) Report - Government Approval - The Contractor shall prepare and submit ESS Report(s) in accordance with the Contract Data Requirement List (DD Form 1423) and the following ;5860277, 5974803TR and ESS001; . 4.9 Production Lot Test (Contractor) - The Contractor shall perform 100% production testing in accordance with ;5860277 and 5974803TR; . 5\. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6\. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable s 

<!-- mobian-agent-ad sponsored="true" id="c7c9fcc6-0194-4a4c-acd2-06a4a2b57d14" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/ab36b2062ed94de994b40dd8263812e0/view)

[More from Defense Logistics Agency posted in February 2021](/defense%5Flogistics%5Fagency%5Fdla/archive/2021-02)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"59--CIRCUIT CARD ASSEMB","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| ||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE \u0026 RECEIVING REPORT|N/A|TBD|SPRMM1|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2020)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2001))|4||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|334412|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be \"issued\" by the government when copies are either deposited in the mail, transmitted by fax, or sent by other electronic commerce methods, such as e-mail. The government's acceptance of the contractor's proposal constitutes bilateral agreement to \"issue\" contractual documents as detailed herein. IN ACCORDANCE WITH DFAR 217.7301, CONTRACTORS SHALL IDENTIFY THEIR SOURCES OF SUPPLY IN CONTRACTS FOR SUPPLIES. IF THE ITEM CURRENTLY BEING PROCURED IS A NON-VALUE ADDED ITEM, PLEASE PROVIDE: ACTUAL MANUFACTURER: CAGE CODE: ADDRESS: CONTRACT DISTRIBUTION: It is recommended that vendors provide contact information to NAVSUP WSS Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts / modifications are issued by DLA Maritime Mechanicsburg and posted on EDA. To receive these notifications, contact: NAVSUP WSS Code 025, Procurement Systems Design and Contract Support Division via email at NAVSUPWSSITIMPHelpDesk@navy.mil. Please include the following information with your request: CAGE code, company name and address and POC with phone number and e-mail address. PRICING FOR REQUEST FOR QUOTATION IS VALID 60 DAYS AFTER THE CLOSING DATE OF THE REQUEST FOR QUOTATION UNLESS OTHERWISE SPECIFIED. PLEASE SPECIFY (IF OTHER THAN 60 DAYS) ____________ DAYS AFTER THE CLOSING DATE OF THE RFQ. Contractors can view their orders, contracts, and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Wide Area Workflow (WAWF) website. It is recommended that contractors register for EDA at: https://wawf.eb.mil/. Click on New User and Registration. This procurement is issued under Special Emergency Procurement Authority (SEPA), FAR 5.202(a)(2). 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB , part of the ;MK200 MOD0 CONTROL DIRECTOR OF THE AEGIS SYSTEM; . 1.2 Master Phototools (Artwork) - the government cannot provide the Stable Base Master Phototools (Artwork). The contractor is required to acquire or develop the Stable Base Master Phototools (Artwork) for manufacture of the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under \"Drawing Number\". These items should be retained until an award is made. 2.2 ;OD40765 is called out as a method to be used for the cleaning of printed circuit cards. This is an old and somewhat outdated publication. The vendor is authorized to use a more current method of cleaning the circuit cards. The OD40765 may be used as a reference. Method to be approved by the QAR.; 2.2.1 \"Document References\" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 The \"Document Changes\" section provides supersessions/changes to referenced documents. 2.3 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=ESS001 |63394| | |C| | | | DRAWING DATA=OD15268 |10001| 1| |C| | | | DRAWING...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/105661543262147428","identifier":"SPRMM121QHA94","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"5998 - ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE"}],"availabilityStarts":"2021-02-02","availabilityEnds":"2021-02-01","sameAs":"https://sam.gov/opp/ab36b2062ed94de994b40dd8263812e0/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

