<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/105299155365864201" -->

---
title: 61--CABLE ASSY LAUNCHER (SPRMM120QRE10) | Closed - MatchAwards
description: 61--CABLE ASSY LAUNCHER. Defense Logistics Agency. Solicitation SPRMM120QRE10. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2020-12-04. INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/105299155365864201
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 61--CABLE ASSY LAUNCHER (SPRMM120QRE10) | Closed
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/105299155365864201
og:description: 61--CABLE ASSY LAUNCHER. Defense Logistics Agency. Solicitation SPRMM120QRE10. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2020-12-04. INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 61--CABLE ASSY LAUNCHER

Status

Closed (archived notice)

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

MECHANICSBURG, USA

Notice type

Solicitation

Solicitation number

SPRMM120QRE10

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

6145 - WIRE AND CABLE, ELECTRICAL

Posted

2020-11-30

Deadline

2020-12-04

## Description

INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2017) (DEVIATION 2018-O0018)|5|||||mark.mcwhorter@dla.mil | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3|||||||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020))|7|||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|335929|1000|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| EVALUATION OF FIRST ARTICLE TESTING|3|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3 ||| This amendment is issued to dissolve the small business set aside and resolicit as an UNRESTRICTED requirement to allow both small and large businesses to submit offers. FOB is changed from D (destination) to S (source). If you have any questions, please call or email: Mark C. McWhorter, 717.550.3138, Email: mark.mcwhorter@dla.mil \\ Please provide the following information with your quote: Contract-Award CAGE: \_\_\_\_\_\_\_\_\_\_\_\_ Quote #: \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ P/N verify\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Inspection (CAGE) \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Acceptance (CAGE) \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Delivery Timeline \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Option Price \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ Option Validity Timeline \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ FOB (S or D) \_\_\_\_\_\_\_\_\_ IMPORTANT - This Solicitation is issued under SEPA Authority. This is a High Priority Navy requirement. Please provide your quote as soon as possible to fill this urgently needed item. Military packaging is required. Government source inspection is required. In order to receive an award from this solicitation, you MUST have a current registration in the System for Award Management (SAM); with no exclusions. You must also have current FAR and DFAR registrations on file. The website to register in SAM is: https://www.sam.gov/portal/public/SAM/ IMPORTANT information for Dealers Traceability - please read and follow clauses DLATERMHZ01 & DLATERMHZ03\. These clauses contain IMPORTANT traceability information that dealers MUST submit to be considered for this order. FAT & PLT: This order requires FAT and PLT testing requirements. Please refer to the technical date package (TDP) and DD 1423, CONTRACT DATA REQUIREMENTS LIST (CDRL) for specific instructions. See Solicitation Notes for CDRL timelines. SUGGESTED DELIVERY SCHEDULE, AFTER DATE OF CONTRACT (ADC), IS AS FOLLOWS: A001-Submit Quality Control Inspection/Test Plan - 30 days ADC Approval of Quality Control Inspection/Test Plan - 60 days ADC A002 - Submit First Article Test/Inspection Procedure - 90 days ADC Approval of First Article Test/Inspection Procedure - 120 days ADC A004 - Submit Certificate of Compliance - Material (Molds) - 150 days ADC Approval of Certificate of Compliance - Material (Molds) - 180 days ADC A005 - Submit Visual Dimensional Inspection Report (Molds) - 210 days ADC Approval of Visual Dimensional Inspection Report (Molds) - 240 days ADC A003 - Submit First Article Test/Inspection Report - 360 Days ADC Approval of First Article Test/Inspection Report - 390 Days ADC A006 - Submit Bulk Cable Inspection Test Report - 420 Days ADC Approval of Bulk Cable Inspection/Test Report - 450 Days ADC A007 - Submit Certificate of Conformance - 420 days ADC Approval of Bulk Certificate of Conformance - 450 days ADC A008 - Submit Certificate of Compliance for various items - 420 days ADC Approval of Certificate of Compliance - 450 days ADC A009 - Submit Bulk Cable Inspection/Test Report - 420 days ADC Approval of Bulk Cable Inspection Test Report - 450 days ADC A00A - Submit Cable Assembly Inspection/Test Report 480 days ADC Approval of Cable Assembly Inspection/Test Report 510 days ADC A00B - Submit Mercury Exclusion Certificate - 480 days ADC Approval of Mercury Exclusion Cert - 510 days ADC Final Shipment of production units - 540 days ADC If the suggested delivery schedule is not agreeable, please revise the above schedule to show your quoted delivery schedule. mark.mcwhorter@dla.mil ; 717.550.3138 \\ 1\. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSY LAUNCHER . 2\. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=6292767 |53711| B|FN |D|0001 | B|49998|0009641 DRAWING DATA=6292767 |53711| B|FN |D|0002 | B|49998|0005626 DRAWING DATA=6292767 |53711| B|FN |D|0003 | B|49998|0005167 DRAWING DATA=7454380 |53711| A|VD |D|0001 | A|49998|0392364 DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=MIL-C-915 |0002| |A |700925|A| | | DOCUMENT REF DATA=MIL-STD-2073 | | | |840716|A| | | DOCUMENT REF DATA=ISO-9001 | | |- |940701|A| | | DOCUMENT REF DATA=ISO\_9001 | | |- |081115|A| | | DOCUMENT REF DATA=ISO 9002 | | |- |940701|A| | | DOCUMENT REF DATA=MIL-W-22759 |0011| |F |041208|A| 1| | DOCUMENT REF DATA=MIL-M-24041 | | |C |881220|A| | | DOCUMENT REF DATA=MIL-C-24217 | | |A |890117|A| 1| |1 DOCUMENT REF DATA=MIL-C-24643 |0001| |B |970331|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |951103|A| 2| | DOCUMENT REF DATA=MIL-HDBK-454 | | |B |070415|A| | | DOCUMENT REF DATA=ISO9001 | | |- |001215|A| | | DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |2 |990801|A| | | 3\. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CABLE ASSY LAUNCHER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage \_\_\_\_\_\_\_ ref. no. ;ODNZ3 7454380-1; 3.1.1 NAVSEA S9320-AM-PRO-020/MLDG - Manufacture of this item requires vendor certification in accordance with NAVSEA S9320-AM-PRO-020/MLDG. 3.1.2 ;Per the NAVSEA molding manual (S9320-AM-PRO-020/MLDG REV 2), in process step number 4-9 (PRESHIPMENT INSPECTION), the manual states: "ensure test inspection report (DS9: appendix II-F),is properly completed and is packaged with cable assembly".; 3.2 Source Control Item - Previous delivery of the specified National Stock Number or similar item manufactured to technical procurement specifications and/or drawings supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item previously approved by the Government have been solicited. The time required for approval of a new supplier is normally such that award cannot be delayed pending approval of the new source. If you have not been solicited and you can furnish either (a) proof of your prior approval as a supplier of this item, or (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or (c) test data indicating your product can meet service operating requirements, or (d) other pertinent data concerning your qualificatin to produce the required item, notify the Procurement Contracting Officer in writing, furnishing said proof of data for evaluation possibly leading to your firm being authorized as an approved source for this procurement or subsequent procurements. 3.3 ;A Quality Conformance Test Plan (QCTP) shall be submitted for government approval. Approval of this plan is required prior to scheduling First Article testing. The In-Service Engineering Agent (ISEA), Naval Undersea Warfare Center Division Keyport Code 435, will witness First Article Testing (see dwg 7454380 Note 22). If First Article testing is waived, approval of the QCTP is required prior to testing the first production lot unit. The Defense Contract Management Agency will act as the ISEA's designated representative (per note 18) and will witness quality conformance testing on the first production lot unit.; 3.4 First Article Test Procedures are required and must be approved prior to any First Article Testing. 3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.6 Hydrostatic Test - Hydrostatic Testing of the CABLE ASSY LAUNCHER shall be in accordance with ;Note 18 F on Dwg 7454380; . 3.7 Marking - This item shall be physically identified in accordance with MIL-STD-130\. 3.8 Serialization - The supplier shall mark a serial number on each CABLE ASSY LAUNCHER in accordance with ;DWG 7454380 NOTE 15; . Actual serial numbers will be assigned ;by the ISEA, NUWC Divsion, Keyport, 610 Dowell St., Keyport WA 98345, Code 435; . 3.9 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.10 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 3.11 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected. As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation. Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request. Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part. Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.) 3.12 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD023; in ECDS at https://register.nslc.navy.mil/ 4\. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208\. Suppliers certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208\. 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 4.5 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The test procedures shall be approved prior to production. There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure previously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.6 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production. 4.7 Production Lot Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure proviously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved. In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order. 4.8 Production Lot Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). 

<!-- mobian-agent-ad sponsored="true" id="002718c0-b2f5-4b83-a048-35f23c603b00" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/e3af72942fae4c2ea4baee086f10fec9/view)

[More from Defense Logistics Agency posted in November 2020](/defense%5Flogistics%5Fagency%5Fdla/archive/2020-11)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"61--CABLE ASSY LAUNCHER","description":"INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2017) (DEVIATION 2018-O0018)|5|||||mark.mcwhorter@dla.mil | EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3|||||||||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020))|7|||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|335929|1000|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (JAN 2004)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| EVALUATION OF FIRST ARTICLE TESTING|3|See CDRLs, DD 1423 in back of solicitation See Remarks on page 2-3 ||| This amendment is issued to dissolve the small business set aside and resolicit as an UNRESTRICTED requirement to allow both small and large businesses to submit offers. FOB is changed from D (destination) to S (source). If you have any questions, please call or email: Mark C. McWhorter, 717.550.3138, Email: mark.mcwhorter@dla.mil \\ Please provide the following information with your quote: Contract-Award CAGE: ____________ Quote #: _________________________ P/N verify________________________ Inspection (CAGE) _________________________________ Acceptance (CAGE) _________________________________ Delivery Timeline __________________ Option Price ______________________ Option Validity Timeline _________________ FOB (S or D) _________ IMPORTANT - This Solicitation is issued under SEPA Authority. This is a High Priority Navy requirement. Please provide your quote as soon as possible to fill this urgently needed item. Military packaging is required. Government source inspection is required. In order to receive an award from this solicitation, you MUST have a current registration in the System for Award Management (SAM); with no exclusions. You must also have current FAR and DFAR registrations on file. The website to register in SAM is: https://www.sam.gov/portal/public/SAM/ IMPORTANT information for Dealers Traceability - please read and follow clauses DLATERMHZ01 \u0026 DLATERMHZ03. These clauses contain IMPORTANT traceability information that dealers MUST submit to be considered for this order. FAT \u0026 PLT: This order requires FAT and PLT testing requirements. Please refer to the technical date package (TDP) and DD 1423, CONTRACT DATA REQUIREMENTS LIST (CDRL) for specific instructions. See Solicitation Notes for CDRL timelines. SUGGESTED DELIVERY SCHEDULE, AFTER DATE OF CONTRACT (ADC), IS AS FOLLOWS: A001-Submit Quality Control Inspection/Test Plan - 30 days ADC Approval of Quality Control Inspection/Test Plan - 60 days ADC A002 - Submit First Article Test/Inspection Procedure - 90 days ADC Approval of First Article Test/Inspection Procedure - 120 days ADC A004 - Submit Certificate of Compliance - Material (Molds) - 150 days ADC Approval of Certificate of Compliance - Material (Molds) - 180 days ADC A005 - Submit Visual Dimensional Inspection Report (Molds) - 210 days ADC Approval of Visual Dimensional Inspection Report (Molds) - 240 days ADC A003 - Submit First Article Test/Inspection Report - 360 Days ADC Approval of First Article Test/Inspection Report - 390 Days ADC A006 - Submit Bulk Cable Inspection Test Report - 420 Days ADC Approval of Bulk Cable Inspection/Test Report - 450 Days ADC A007 - Submit Certificate of Conformance - 420 days ADC Approval of Bulk Certificate of Conformance - 450 days ADC A008 - Submit Certificate of Compliance for various items - 420 days ADC Approval of Certificate of Compliance - 450 days ADC A009 - Submit Bulk Cable Inspection/Test Report - 420 days ADC Approval of Bulk Cable Inspection Test Report - 450 days ADC A00A - Submit Cable Assembly Inspection/Test Report 480 days ADC Approval of Cable Assembly Inspection/Test Report 510 days ADC A00B - Submit Mercury Exclusion Certificate - 480 days ADC Approval of Mercury Exclusion Cert - 510 days ADC Final Shipment of production units - 540 days ADC If the suggested delivery schedule is not agreeable,...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/105299155365864201","identifier":"SPRMM120QRE10","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"6145 - WIRE AND CABLE, ELECTRICAL"}],"availabilityStarts":"2020-11-30","availabilityEnds":"2020-12-04","sameAs":"https://sam.gov/opp/e3af72942fae4c2ea4baee086f10fec9/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

