<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/defense_logistics_agency_dla/posts/105270843817887836" -->

---
title: 17--COVER,CYLINDER (SPRPA120RX238) – Defense Logistics Agency | Closed - MatchAwards
description: 17--COVER,CYLINDER. Defense Logistics Agency. Solicitation SPRPA120RX238. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2020-11-16. ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG...
canonical: https://matchawards.com/defense_logistics_agency_dla/posts/105270843817887836
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: 17--COVER,CYLINDER (SPRPA120RX238) – Defense Logistics Agency | Closed
og:url: https://matchawards.com/defense_logistics_agency_dla/posts/105270843817887836
og:description: 17--COVER,CYLINDER. Defense Logistics Agency. Solicitation SPRPA120RX238. NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing. Deadline 2020-11-16. ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG...
og:image: https://matchawards.com/system/accounts/avatars/000/000/105/original/c90b43bed2221480.png?1638986263
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# 17--COVER,CYLINDER

Status

Closed (archived notice)

Agency

[Defense Logistics Agency](/defense%5Flogistics%5Fagency%5Fdla)

Office

PHILADELPHIA, USA

Notice type

Solicitation

Solicitation number

SPRPA120RX238

NAICS

[333999 - All Other Miscellaneous General Purpose Machinery Manufacturing](/groups/500)

PSC

1720 - AIRCRAFT LAUNCHING EQUIPMENT

Posted

2020-11-25

Deadline

2020-11-16

## Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001|4 EA|225 days ADC|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 year after date of delivery|Within 45 days after discovery of defect.||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5|||||x| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1000|||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)|2||| FACSIMILE PROPOSALS (OCT 1997)|1|x| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/acquisition/Pages/DLAD.aspx As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. Please email copy of proposal to Daniel.MacDonald@dla.mil 1\. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130\. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.4 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.5 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.6 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.7 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.8 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.9 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.10 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995\. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.11 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.12 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;11-61639-6L; ) ;80020; , Revision ;W; and all details and specifications referenced therein. 1.13 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.14 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2\. APPLICABLE DOCUMENTS DRAWING DATA=MPR1223 |80020| B| |A| | | | DRAWING DATA=MPR4 |80020| D| |A| | | | DRAWING DATA=11-61639 |80020| W| |A| | | | 3\. REQUIREMENTS - NOT APPLICABLE 4\. QUALITY ASSURANCE 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ; ; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1\. Critical characteristics: 100% inspection shall apply. 2\. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;The contractor shall accomplish 100% inspection and/or testing of all critical,and/or requirements identified in the drawings, drawing notes, and process and Results shall consist of actual dimensions, measurements, and test outcomes and included in the First Article test report.certifications to be on file for a minumum of seven years after delivery of contract; C. Major and Minor characteristics 1\. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.4 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ; ; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.5 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA (732) 323-4986.; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.6 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA (732) 323-4986\. THE FOLLOWING ITEMS REQUIRES AN INTERIM INSPECTION AT CONTRACTORS LOCATION:; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ;Interim Inspection Requirements:a. The follow item(s) requires an Interim Inspection at the contractor's location: i. Material, Tensile Strength, Yield Strength, Elongation, Reduction of Area and Izod test IAW MPR 4 and per drawing 11-61639 (C1) ii. Heat Treat IAW AMS 2759/1, MPR 4 per Note 6 of Drawing 11-61639 iii. Hardness Test per Drawing per Note 6 of Drawing 11-61639 (M101). iv. Magnetic particle Inspection IAW MPR 4 and per drawing 11-61639 prior to protective coating (M102) v. Dimensional Inspection per drawing 11-61639 prior to protective coating.; ;The contractor shall assist on the conduct of the interim inspection(s) as descfacilities, inspection equipment, and skilled personnel, to support the NAWCADLinterim inspection(s). The contractor shall provide gauges, tools, fixtures, ancontractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment& machines used to accomplish the inspection task. This contractor the production quantities and as a minimum, include inspection of above.; ; ; ; ; ;NECESSARY TO PERFORM THE INSPECTIONS. THE CONTRACTOR SHALL ALSO PROVIDE SUFFIENT RIGGING MATERIAL HANDLING SERVICES AND MANPOWER TO SETUP/CONFIGURE/OPERATEEQUIPMENT & MACHINES USED TO ACCOMPLISH THE INSPECTION TASK. THIS CONTRACTORASSIST REQUIREMENT SHALL BE APPLICABLE TO 100% OF THE PRODUCTION QUANTITIES AND AS A MINIMUM, INCLUDE INSPECTION OF ALL (100%) INTERIM INSPECTIONREQUIREMENTS IDENTIFIED ABOVE.; ; ; 4.7 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.7.1 Dimensional test (special) ;CLOSE MACHINE TOLERANCES. HARDNESS TEST.; 4.7.2 Requirements of: ;LKE DRAWING PACKAGE; 4.7.3 Form ;APPLIES; 4.7.4 Fit ;N/A; 4.7.5 Function ;N/A; 4.7.6 Compliance with drawing ( ;11-61639; ) ;80020; , Revision ;W; and specifications referenced therein. 4.8 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.9 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.10 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.10.1 The QAR shall be present to witness all First Article Testing. 4.10.2 The following additional personnel shall witness the First Article Testing: ;ROY JANNEY QA REP AT FAX (732) 323-4986; 4.11 Disposition of FAT samples 4.11.1 ; ; Sample(s) may be destroyed during testing. 4.11.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.12 Test Sample Coating Instructions 4.12.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.13 Notice to Government of Testing at the contractors facility. 4.13.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;11-61639-6L; ; , Revision ;W; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.14 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the produc 

<!-- mobian-agent-ad sponsored="true" id="32d07472-df39-4d14-8532-e68410054fe2" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


[Source notice](https://sam.gov/opp/a7d113629c3c4fc5b2a84e25e9a7bf2b/view)

[More from Defense Logistics Agency posted in November 2020](/defense%5Flogistics%5Fagency%5Fdla/archive/2020-11)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"17--COVER,CYLINDER","description":"ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001|4 EA|225 days ADC|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 year after date of delivery|Within 45 days after discovery of defect.||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5|||||x| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1000|||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)|2||| FACSIMILE PROPOSALS (OCT 1997)|1|x| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/acquisition/Pages/DLAD.aspx As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. Please email copy of proposal to Daniel.MacDonald@dla.mil 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.4 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.5 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.6 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.7 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.8 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.9 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.10 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration...","url":"https://matchawards.com/defense_logistics_agency_dla/posts/105270843817887836","identifier":"SPRPA120RX238","category":"333999 - All Other Miscellaneous General Purpose Machinery Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1720 - AIRCRAFT LAUNCHING EQUIPMENT"}],"availabilityStarts":"2020-11-25","availabilityEnds":"2020-11-16","sameAs":"https://sam.gov/opp/a7d113629c3c4fc5b2a84e25e9a7bf2b/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

