Diversion Chamber C Inlet Pipe Modifications -WPCF
Agency
Connecticut State Opportunities
NAICS
238910 - Site Preparation Contractors
Deadline
2026-10-16T00:00:00.000Z
Place of performance
Connecticut, United States
Description
Dewatering, cleaning, ground water control, CCTV, Cured-in-Place (CIPP) lining of located on the Water Pollution Control Facility (WPCF). Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 - 10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***