ClickCease COTEAU DES PRAIRIES HOSPITAL | Award - MatchAwards

COTEAU DES PRAIRIES HOSPITAL

Agency
United States Department of Health and Human Services
NAICS
541611 - Administrative Management and General Management Consulting Services
Period start
2026-09-30
Period end
2029-09-29
Budget
683000.0
Place of performance
SOUTH DAKOTA, UNITED STATES

Description

UPGRADE FOR RURAL HEALTH: REPLACEMENT AND INSTALLATION OF BOILERS, PUMP SYSTEM, AND CHILLER SYSTEM AT COTEAU DES PRAIRIE HOSPITAL, SD. - COTEAU DES PRAIRIES HEALTH CARE SYSTEM (CDP), A 25-BED NONPROFIT CRITICAL ACCESS HOSPITAL LOCATED IN SISSETON, SOUTH DAKOTA, HAS BEEN AWARDED CONGRESSIONALLY DIRECTED SPENDING (CDS) FUNDING THROUGH THE HEALTH RESOURCES AND SERVICES ADMINISTRATION (HRSA) TO SUPPORT CRITICAL INFRASTRUCTURE IMPROVEMENTS THAT WILL ENHANCE FACILITY RELIABILITY, ENERGY EFFICIENCY, AND CONTINUITY OF PATIENT CARE. PROJECT 1: BOILER AND PUMP SYSTEM UPGRADES WILL REPLACE OUTDATED, INEFFICIENT BOILERS AND PUMPS WITH HIGH-EFFICIENCY EQUIPMENT, INCLUDING ASSOCIATED PIPING, CONTROLS, ELECTRICAL WORK, AND SYSTEM INTEGRATION. THESE IMPROVEMENTS WILL REDUCE ENERGY CONSUMPTION, LOWER OPERATING COSTS, IMPROVE SYSTEM RELIABILITY, AND ENSURE UNINTERRUPTED HEATING FOR PATIENT CARE AREAS. PROJECT 2: CHILLER SYSTEM REPLACEMENT AND MODERNIZATION WILL REPLACE THE HOSPITAL'S AGING CHILLER SYSTEM AND COMPLETE THE NECESSARY PNEUMATICS CONVERSION TO MODERNIZE COOLING INFRASTRUCTURE. THE PROJECT WILL IMPROVE TEMPERATURE CONTROL, REDUCE THE RISK OF EQUIPMENT FAILURE, AND HELP PREVENT DISRUPTIONS TO PATIENT CARE AND FACILITY OPERATIONS. TOGETHER, THESE PROJECTS WILL STRENGTHEN THE HOSPITAL'S PHYSICAL INFRASTRUCTURE, IMPROVE ENERGY EFFICIENCY, AND SUPPORT LONG-TERM OPERATIONAL SUSTAINABILITY. THE UPGRADES WILL HELP ENSURE A SAFE, RELIABLE, AND COMFORTABLE CARE ENVIRONMENT FOR PATIENTS, VISITORS, AND STAFF. CDP SERVES MORE THAN 21,000 RESIDENTS ACROSS A MEDICALLY UNDERSERVED RURAL REGION, INCLUDING THE LAKE TRAVERSE RESERVATION OF THE SISSETON WAHPETON OYATE TRIBE. ALL WORK WILL OCCUR WITHIN THE EXISTING HOSPITAL FACILITY AND WILL NOT INVOLVE ANY GROUND DISTURBANCE. THE TOTAL PROJECT COST IS $2,032,000, OF WHICH $1,782,000 IS FUNDED THROUGH THE HRSA CDS AWARD. THE REMAINING BALANCE WILL BE SUPPORTED THROUGH HOSPITAL RESOURCES.

Source notice